Hot water motor using 50W400 high grade cold rolled silicon steel, stamping by high speed punch, make its stator iron loss is low, less heating advantages, the motor winding using high temperature, anti-aging hot water motor special winding water line, using 3CR13 stainless steel impeller shaft, high temperature sleeve and other high quality accessories, so that it can run at high temperature for a long time, and can be used with a frequency converter, so that it can automatically adjust according to the size of the water consumption.
This product is a three-phase AC 380V power supply (tolerance ± 5%), 50HZ frequency (tolerance ± 1%) pump, suitable for pumping water temperature not higher than 20 °C water. Specific requirements include: solid impurities content is not greater than 0.01%; PH value between 6.5-8.5; hydrogen sulfide content is not more than 1.5mg/L; chloride ion content is not more than 400mg/L. The pump adopts closed or water sealed structure, before use must be filled with water, tighten the water and air exhaust bolts, otherwise not to use. The pump must be completely immersed in water, immersion depth shall not exceed 70m, and the distance from the bottom of the well shall not be less than 3m. The water flow in the well shall meet the requirements of the pump output and continuous operation, the pump output shall be controlled at 0.7-1.2 times the rated flow. The well shall be vertical, the pump can not be used horizontally or tilted, only vertical use. The pump must be equipped with cables and external overload protection device according to the requirements. It is strictly prohibited to test the pump without water and no load.
Mfano | Mtiririko (m3/h) | Kichwa (m) |
Kasi ya mzunguko (badilisha / uhakika) |
Pampu ya maji(%) | Kituo kipenyo (mm) |
Inatumika vizuri kipenyo(mm) |
Imekadiriwa power(KW) |
Imekadiriwa voltage (V) |
Imekadiriwa sasa (A) |
Ufanisi (%) | nguvu factorcos | Kitengo Ukubwa wa juu wa radial(mm) |
Toa maoni | |||||||||
200QJ20-40 | 20 | 40 | 2850 | 66 | 50 | 200juu | 4 | 380 | 10.1 | 76.0 | 0.79 | 184 | ||||||||||
200QJ20-54 | 54 | 5.5 | 13.6 | 77.0 | 0.8 | |||||||||||||||||
200QJ20-81 | 81 | 7.5 | 18.0 | 78.0 | 0.81 | |||||||||||||||||
200QJ20-93 | 93 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ20-108 | 108 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ20-121 | 121 | 13 | 29.8 | 80.0 | 0.83 | |||||||||||||||||
200QJ20-148 | 148 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ20-175 | 175 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ20-202 | 202 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ20-243 | 243 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ20-270 | 270 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ20-360 | 360 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ20-442 | 442 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ25-28 | 25 | 28 | 2850 | 68 | 65 | 200juu | 4 | 380 | 10.1 | 76.0 | 0.79 | 184 | ||||||||||
200QJ25-42 | 42 | 5.5 | 13.6 | 77.0 | 0.8 | |||||||||||||||||
200QJ25-56 | 56 | 7.5 | 18.0 | 78.0 | 0.81 | |||||||||||||||||
200QJ25-70 | 70 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ25-98 | 98 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ25-112 | 25 | 112 | 2850 | 68 | 65 | 200juu | 13 | 380 | 29.8 | 80.0 | 0.83 | 184 | ||||||||||
200QJ25-126 | 126 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ25-154 | 154 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ25-182 | 182 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ25-210 | 210 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ25-252 | 252 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ25-308 | 308 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ25-378 | 378 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ32-26 | 32 | 26 | 2850 | 70 | 80 | 200juu | 4 | 380 | 10.1 | 76.0 | 0.79 | 184 | ||||||||||
200QJ32-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | |||||||||||||||||
200QJ32-52 | 52 | 7.5 | 18.0 | 78.0 | 0.81 | |||||||||||||||||
200QJ32-65 | 65 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ32-78 | 78 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ32-91 | 91 | 13 | 29.8 | 80.0 | 0.83 | |||||||||||||||||
200QJ32-104 | 104 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ32-130 | 130 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ32-143 | 143 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ32-169 | 169 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ32-195 | 195 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ32-247 | 247 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ32-299 | 299 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ40-26 | 40 | 26 | 2850 | 72 | 80 | 200juu | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 184 | ||||||||||
200QJ40-39 | 39 | 7.5 | 18.0 | 78.0 | 0.81 | |||||||||||||||||
200QJ40-52 | 52 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ40-65 | 65 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ40-78 | 78 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ40-104 | 104 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ40-117 | 117 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ40-143 | 143 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ40-169 | 169 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ40-208 | 208 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ40-247 | 247 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ50-26 | 50 | 26 | 2850 | 74 | 80 | 200juu | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 184 | ||||||||||
200QJ50-39 | 39 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ50-52 | 52 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ50-65 | 65 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ50-78 | 78 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ50-91 | 91 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ50-104 | 104 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ50-130 | 130 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ50-156 | 156 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ50-208 | 208 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ63-24 | 63 | 24 | 2850 | 74 | 80 | 200juu | 7.5 | 380 | 18.0 | 78.0 | 0.81 | 184 | ||||||||||
200QJ63-36 | 36 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ63-60 | 60 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ63-72 | 72 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ63-84 | 84 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ63-96 | 96 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ63-120 | 120 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ63-144 | 144 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ80-22 | 80 | 22 | 2850 | 75 | 100 | 200juu | 7.5 | 380 | 18.0 | 78.0 | 0.81 | 184 | ||||||||||
200QJ80-33 | 33 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ80-44 | 44 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ80-55 | 55 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ80-66 | 66 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ80-88 | 88 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ80-99 | 99 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ80-121 | 121 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ100-18 | 100 | 18 | 2850 | 75 | 100 | 200juu | 9.2 | 380 | 21.7 | 78.5 | 0.82 | 184 | ||||||||||
200QJ100-27 | 27 | 13 | 29.8 | 80.0 | 0.83 | |||||||||||||||||
200QJ100-36 | 36 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ100-45 | 45 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ100-54 | 54 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ100-63 | 63 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ100-72 | 100 | 72 | 2850 | 75 | 100 | 200juu | 37 | 380 | 79.7 | 84.0 | 0.84 | 184 | ||||||||||
200QJ100-90 | 90 | 45 | 96.9 | 84.0 | 0.84 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, madhubuti kulingana na masharti ya kuinua pampu, mtiririko mbalimbali ya matumizi, ili kuzuia mtiririko wa chini au kuinua high kusukumia nguvu, kuzaa kutia na sehemu nyingine ya kuvaa, overload motor kuchomwa moto.
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
Utangulizi mfupi wa muundo: sehemu ya pampu inaundwa hasa na shimoni la pampu, impela, ganda la diversion, kuzaa kwa mpira, angalia mwili wa valve (sehemu za hiari) na vipengele vingine. Sehemu ya motor inaundwa na msingi, filamu inayosimamia shinikizo, fani ya kutia, sahani ya kutia, kiti cha chini cha kubeba mwongozo, stator, rotor, kiti cha kuzaa mwongozo, pete ya mchanga, sehemu ya ghuba ya maji, kebo na vifaa vingine.
Makala kuu ya bidhaa ni pamoja na:
1, motor ni kujazwa na maji mvua submersible awamu ya tatu asynchronous motor, cavity motor ni kamili ya maji safi, kutumika kwa baridi motor na lubricate kuzaa, shinikizo kudhibiti filamu chini ya motor hutumiwa kurekebisha. tofauti ya shinikizo la upanuzi na contraction ya maji ndani ya mwili unaosababishwa na mabadiliko ya ongezeko la joto la motor.
2, Ili kuzuia mchanga katika maji ya kisima usiingie kwenye motor, mwisho wa juu wa shimoni la motor una vifaa vya mihuri miwili ya mafuta, na pete ya mchanga imewekwa ili kuunda muundo wa kuzuia mchanga.
3, Ili kuzuia shimoni la pampu kukimbia wakati wa kuanza, shimoni la pampu na shimoni ya gari huunganishwa na kiunganishi, na sehemu ya juu ya msukumo imewekwa kwenye sehemu ya chini ya gari.
4, lubrication ya motor na kuzaa pampu ni lubrication maji.
5, Vilima vya stator ya motor hutengenezwa kwa waya wa hali ya juu wa chini ya maji, na utendaji wa juu wa insulation.
6, pampu imeundwa na CAD ya kompyuta, na muundo rahisi na utendaji mzuri wa kiufundi.

(1) Maandalizi kabla ya ufungaji:
1. Angalia ikiwa pampu inayoweza kuzama inakidhi masharti ya matumizi na upeo uliobainishwa kwenye mwongozo.
2. Kwa kutumia kipenyo kizito chenye kipenyo sawa na kipenyo cha juu zaidi cha nje cha pampu inayoweza kuzamishwa, pima ikiwa kipenyo cha ndani cha kisima kinaweza kutoshea pampu inayoweza kuzamishwa, na kupima kama kina cha kisima kinakidhi mahitaji ya usakinishaji.
3. Angalia kama kisima ni safi na kama maji ya kisima ni machafu. Kamwe usitumie pampu ya umeme inayoweza kuzama ili kuosha tope la pampu ya kisima na maji ya mchanga ili kuepuka uharibifu wa mapema wa pampu ya umeme inayoweza kuzamishwa.
4. Angalia ikiwa nafasi ya bani ya usakinishaji ya welhead inafaa na ikiwa inaweza kuhimili ubora wa kitengo kizima.
5. Angalia ikiwa vijenzi vya pampu inayoweza kuzamishwa vimekamilika na kusakinishwa ipasavyo kulingana na mchoro wa kusanyiko kwenye mwongozoOndoa skrini ya kichujio na uzungushe kiunganishi ili kuona kama kinazunguka kwa urahisi.
6. Fungua skrubu ya skrubu ya maji na ujaze tundu la moshi kwa maji safi, yasiyo na babuzi (kumbuka. hakikisha umeichuja), kisha kaza screw ya maji. Baada ya masaa 12 ya sindano ya maji, upinzani wa insulation ya motor haipaswi kuwa chini ya 150M Q inapopimwa na meza ya 500V ya kutikisa.
7. Kiunganishi cha kebo, kata mkono wa mpira wa mm 120 kutoka mwisho mmoja wa kebo inayotoka na kebo inayolingana na kisu cha fundi umeme kisha uyumbe urefu wa nyaya tatu za msingi katika umbo la kupitiwa, ng'oa msingi wa shaba wa mm 20, ondoa oksidi. safu ya nje ya waya wa shaba na kisu au kitambaa cha mchanga, na ingiza ncha mbili za waya zilizounganishwa kwenye palirs.Baada ya kuifunga safu kwa ukali na waya mzuri wa shaba, solder kabisa na imara, na mchanga wa yoyote. burrs juu ya uso. Kisha, kwa viungo vitatu, tumia mkanda wa insulation ya polyvester ili kuvifunga kwa njia ya nusu iliyopangwa kwa birika tatu. Funga ncha mbili za safu ya kukunja vizuri kwa uzi wa nyion, na kisha utumie njia iliyopangwa nusu kufunga mkanda kwa tabaka tatu. Funga kifaa cha nje na mkanda wa insulation ya shinikizo la juu kwa tabaka tatu. Hatimaye, kunja nyuzi tatu pamoja na kuzifunga mara kwa mara kwa tabaka tano na mkanda wa shinikizo la juu. Kila safu lazima imefungwa vizuri, na viungo vya interlayer lazima ziwe tight na fimm ili kuzuia maji kupenya na kuharibu insulation, Baada ya kuifunga, loweka ndani ya maji kwenye joto la kawaida la 20 'c kwa masaa 12, na kupima upinzani wa insulation na meza ya kutikisa. , ambayo haipaswi kuwa chini ya 100M Ω
Mchoro wa mchakato wa wiring cable ni kama ifuatavyo:
8. Tumia multimeter ili uangalie ikiwa waya za awamu tatu zimeunganishwa na ikiwa upinzani wa DC ni takriban usawa.
9. Angalia ikiwa saketi na uwezo wa kibadilishaji umeme umejaa kupita kiasi, na kisha unganisha swichi ya ulinzi wa upakiaji au vifaa vya kuanzia. Tazama Jedwali la 2 kwa miundo mahususi, kisha Mimina ndoo ya maji kwenye pampu ya maji kutoka kwa pampu ya maji ili kulainisha fani za mpira kwenye pampu, na kisha uweke pampu ya umeme inayoweza kuzamishwa wima na thabiti. Anza (si zaidi ya sekunde moja) na uangalie ikiwa mwelekeo wa usukani unalingana na ishara ya usukani. Ikiwa sivyo, badilisha viunganishi vyovyote viwili vya kebo ya awamu ya tatu.Kisha sakinisha kichujio na ujiandae kwenda chini ya kisima. Ikiwa inatumiwa katika matukio maalum (kama vile mitaro, mifereji, mito, mabwawa, mabwawa, nk), pampu ya umeme lazima iwekwe chini kwa uhakika.
(2) Vifaa na zana za usakinishaji:
1. Jozi moja ya minyororo ya kuinua kwa zaidi ya tani mbili.
2. Tripod yenye urefu wa wima wa si chini ya mita nne.
3. Kamba mbili za kunyongwa (kamba za waya) zinazoweza kubeba uzito wa zaidi ya tani moja (zinaweza kubeba uzito wa seti kamili ya pampu za maji).
4. Weka jozi mbili za clamps (splints).
5. Wrenches, nyundo, screwdrivers, zana za umeme na vyombo, nk.
(3) Ufungaji wa pampu ya umeme:
1. Mchoro wa ufungaji wa pampu ya umeme ya chini ya maji umeonyeshwa kwenye Mchoro 2. Vipimo maalum vya ufungaji vinaonyeshwa kwenye Jedwali la 3 "Orodha ya Vipimo vya Ufungaji wa Pumpu ya Umeme ya Submersible".
2. Pampu za umeme zinazozamishwa na kichwa chini ya mita 30 zinaweza kuinuliwa moja kwa moja kwenye kisima kwa kutumia mabomba na kamba za waya au kamba nyingine za katani ambazo zinaweza kubeba uzito kamili wa mashine nzima, mabomba ya maji, na maji katika mabomba.
3. Pampu zilizo na kichwa cha zaidi ya mita 30 hutumia mabomba ya chuma, na mlolongo wa ufungaji ni kama ifuatavyo:
①Tumia kibano kubana ncha ya juu ya sehemu ya pampu ya maji (motor na pampu ya maji vimeunganishwa kwa wakati huu), inua kwa mnyororo wa kuning'inia, na polepole uifunge ndani ya kisima hadi Weka bani kwenye kichwa cha kisima na uondoe. mnyororo wa kunyongwa.
② Tumia vibano vingine ili kubana bomba, linyanyue kwa mnyororo wa kuning'inia umbali wa sm 15 kutoka kwenye ubao, na uushushe polepole. Kati ya flange ya bomba na flange ya pampuWeka pedi ya mpira mahali pake na kaza bomba na pampu sawasawa na bolts, karanga na washers wa spring.
③ Inua pampu inayoweza kuzama kidogo, ondoa kibano kwenye ncha ya juu ya pampu ya maji, funga kebo kwa uthabiti kwenye bomba la maji kwa mkanda wa plastiki, na uifunge polepole chini hadi Kinano kiwekwe kwenye kisima.
④Tumia njia sawa kufunga mabomba yote ya maji kwenye kisima.
⑤Baada ya kebo ya kuongoza kuunganishwa kwenye swichi ya kudhibiti, inaunganishwa kwenye usambazaji wa umeme wa awamu tatu.
(4) Mambo ya kuzingatia wakati wa usakinishaji:
1. Ikiwa jambo la jamming linapatikana wakati wa mchakato wa kusukuma, pindua au kuvuta bomba la maji ili kuondokana na hatua ya jamming. Ikiwa hatua mbalimbali bado hazifanyi kazi, tafadhaliUsilazimishe pampu chini ili kuepuka uharibifu wa pampu ya umeme inayozama na kisima.
2. Wakati wa ufungaji, pedi ya mpira inapaswa kuwekwa kwenye flange ya kila bomba na kuimarishwa sawasawa.
3. Wakati pampu ya maji inaposhushwa ndani ya kisima, inapaswa kuwekwa katikati ya bomba la kisima ili kuzuia pampu kukimbia dhidi ya ukuta wa kisima kwa muda mrefu, na kusababisha pampu kutetemeka na motor kufagia na kuwaka. .
4. Tambua kina cha pampu ya maji hadi chini ya kisima kulingana na mchanga unaopita na hali ya silt ya kisima. Usizike pampu kwenye matope. Umbali kutoka kwa pampu ya maji hadi chini ya kisima kwa ujumla sio chini ya mita 3 (ona Mchoro 2).
5. Kina cha kuingilia maji cha pampu ya maji haipaswi kuwa chini ya mita 1-1.5 kutoka ngazi ya maji yenye nguvu hadi nodi ya ingizo la maji (ona Mchoro 2). Vinginevyo, fani za pampu za maji zinaweza kuharibiwa kwa urahisi.
6. Kuinua kwa pampu ya maji hawezi kuwa chini sana. Vinginevyo, vali ya lango inahitaji kusakinishwa kwenye bomba la maji la kisima ili kudhibiti mtiririko wa pampu kwenye sehemu iliyokadiriwa ya mtiririko ili kuzuia injini isijazwe na kuteketezwa kwa sababu ya viwango vikubwa vya mtiririko.
7. Wakati pampu ya maji inapoendesha, pato la maji linapaswa kuendelea na hata, sasa inapaswa kuwa imara (chini ya hali ya kazi iliyopimwa, kwa ujumla si zaidi ya 10% ya sasa iliyopimwa), na haipaswi kuwa na vibration au kelele. Ikiwa kuna hali isiyo ya kawaida, mashine inapaswa kusimamishwa ili kujua sababu na kuiondoa.
8. Wakati wa kufunga, makini na mpangilio wa waya wa kutuliza motor (angalia Mchoro 2). Wakati bomba la maji ni bomba la chuma, liongoze kutoka kwenye kisima cha kisima; wakati bomba la maji ni bomba la plastiki, liongoze kutoka kwa alama ya kutuliza pampu ya umeme.
According to the product description, our submersible pump after installation needs careful inspection and testing to ensure its normal operation and prolong the service life. After installation, it is necessary to recheck the insulation resistance and three-phase continuity to ensure that the instrument and the start-up equipment are connected correctly. Before starting the test machine, observe whether the indication readings of the instruments are correct, check whether the rated voltage and current specified on the nameplate are exceeded, and observe whether there is noise or vibration in the pump. If everything is normal, it can be put into operation. After the pump runs for the first four hours, the motor thermal insulation resistance should be closed and quickly tested, and its value should not be less than 0.5 megaohms. After stopping the pump, it needs to be restarted at an interval of five minutes to prevent the water column in the pipeline from returning to cause the motor to burn out due to excessive current. After normal operation, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. Once abnormal conditions are found, such as the current exceeds 20% of the rated working conditions, the water level drops causing intermittent drainage, the submersible pump vibrates or makes loud noise, the supply voltage is lower than 340 volts, one phase in the fuse is burned out, the water pipe is damaged or the motor's thermal insulation resistance to the earth is less than 0.5 megaohms, the machine should be stopped immediately to eliminate the fault. When disassembling the unit, it is necessary to operate in accordance with the specified sequence to avoid damaging various components. Once a year or less than one year of use but has been immersed for two years, it must be disassembled and inspected in accordance with the provisions, and the worn parts must be replaced to ensure the normal operation and service life of the submersible electric pump.
1, kuweka maji katika cavity motor (hasa katika majira ya baridi ili kuzuia motor kutoka kufungia), na kufunga cable vizuri.
2, hifadhi katika chumba cha ndani bila vitu babuzi na gesi, na joto chini ya 40 °C.
3, matumizi ya muda mrefu lazima makini na kuzuia kutu ya pampu submersible.
- Msukumo
- Sleeve ya shimoni
- Sleeve ya shimoni ya mpira
-
Pete ya kuziba
01 Unywaji wa maji ya kisima kirefu
02 Ugavi wa maji wa hali ya juu
03 usambazaji wa maji wa mlima
04 maji ya mnara
05 Umwagiliaji wa kilimo
06 umwagiliaji wa bustani
07 ulaji wa maji ya mto
08 maji ya nyumbani