250QJP Peep Well Submersible Pump

Fanya usindikaji wa OEM! Kulingana na mahitaji ya mtumiaji, kubuni na utengenezaji wa aina mbalimbali za mahitaji maalum ya magari yasiyo ya kawaida ya chini ya maji na pampu. Viwango vya utekelezaji wa bidhaa: GB/T2816-2014 "pampu inayoweza kuingizwa vizuri", GB/T2818-2014 "motor inayoingia vizuri ya asynchronous". WhatsApp:17855846335
PDF DOWNLOAD
Maelezo
Lebo
 
Muhtasari wa Bidhaa

This series of fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are equipped with alloy copper sleeves with water as lubricant. Stainless steel bushings replace ball bearings, avoiding the problems of easy rust of ball bearings and burnout of motor due to lack of oil and wear. Most suitable for music fountain, all models can be used horizontally.

 

 
Masharti ya Matumizi

1, usambazaji wa nguvu: awamu ya tatu AC 380V (uvumilivu + / - 5%), 50HZ (uvumilivu + / - 1%).

2, ubora wa maji:

(1) joto la maji si zaidi ya 20 °C;

(2) maudhui ya uchafu thabiti (uwiano wa wingi) si kubwa kuliko 0.01%;

(3) PH thamani (pH) 6.5-8.5;

(4) maudhui ya sulfidi hidrojeni si kubwa kuliko 1.5mg/L;

(5) Maudhui ya ioni ya kloridi si zaidi ya 400mg/L.

3, motor imefungwa au maji kujazwa muundo wa mvua, kabla ya kutumia submersible motor cavity lazima kamili ya maji safi, ili kuzuia uongo kamili, na kisha kaza sindano ya maji, bolts hewa kutolewa, vinginevyo hairuhusiwi kutumia.

4, pampu inayoweza kuzama lazima iingizwe kabisa ndani ya maji, kina cha kupiga mbizi sio zaidi ya 70m, pampu ya chini ya maji kutoka chini ya kisima sio chini ya 3m.

5, mtiririko wa maji vizuri wanapaswa kuwa na uwezo wa kukidhi submersible pato maji pato na operesheni ya kuendelea, submersible pato pato maji inapaswa kudhibitiwa saa 0.7-1.2 mara kati yake lilipimwa.

6, kisima lazima sawa, pampu submersible haiwezi kutumika au kutupwa, wima tu matumizi.

7, pampu submersible lazima kuendana na cable kulingana na mahitaji, na kifaa nje overload ulinzi.

8, pampu ni marufuku madhubuti bila maji hakuna mzigo mashine mtihani

 

 
Maana ya Mfano

 
Marejeleo ya Mfano wa Sehemu
Mfano Mtiririko (m3/h) Kichwa
(m)

Kasi ya mzunguko

(badilisha / uhakika)

Pampu ya maji(%)  Kituo
kipenyo
(mm)
Inatumika vizuri
kipenyo(mm) 
 Imekadiriwa
power(KW)
Imekadiriwa
voltage (V)
Imekadiriwa
sasa (A)
Ufanisi (%) nguvu factorcos   Kitengo
Ukubwa wa juu wa radial(mm)
Toa maoni
250QJ50-40 50 40 2875 72 80  250juu 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250juu 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250juu 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250juu 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250juu 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250juu 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250juu 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250juu 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250juu 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Tahadhari za Usalama

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, madhubuti kulingana na masharti ya kuinua pampu, mtiririko mbalimbali ya matumizi, ili kuzuia mtiririko wa chini au kuinua high kusukumia nguvu, kuzaa kutia na sehemu nyingine ya kuvaa, overload motor kuchomwa moto.

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Utangulizi wa Muundo

The introduction and structure of this pump product mainly include pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main characteristics of this pump product include the use of water-cooled wet submersible three-phase asynchronous motor, the motor cavity is filled with clean water to cool the motor and lubricate the bearing, the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and the sand ring is installed to form a sand prevention structure. In order to avoid the pump shaft jumping at startup, the pump shaft and the motor shaft are connected together through the coupling, and the thrust bearing is installed at the lower part of the motor. The motor and pump bearing lubrication adopts water lubrication. The stator winding of the motor adopts high quality submersible motor winding, with high insulation performance. The pump adopts computer CAD design, simple structure and superior technical performance.

 
Sakinisha

(1) Maandalizi kabla ya ufungaji:
1. Angalia ikiwa pampu inayoweza kuzama inakidhi masharti ya matumizi na upeo uliobainishwa kwenye mwongozo.
2. Kwa kutumia kipenyo kizito chenye kipenyo sawa na kipenyo cha juu zaidi cha nje cha pampu inayoweza kuzamishwa, pima ikiwa kipenyo cha ndani cha kisima kinaweza kutoshea pampu inayoweza kuzamishwa, na kupima kama kina cha kisima kinakidhi mahitaji ya usakinishaji.
3. Angalia kama kisima ni safi na kama maji ya kisima ni machafu. Kamwe usitumie pampu ya umeme inayoweza kuzama ili kuosha tope la pampu ya kisima na maji ya mchanga ili kuepuka uharibifu wa mapema wa pampu ya umeme inayoweza kuzamishwa.
4. Angalia ikiwa nafasi ya bani ya usakinishaji ya welhead inafaa na ikiwa inaweza kuhimili ubora wa kitengo kizima.
5. Angalia ikiwa vijenzi vya pampu inayoweza kuzamishwa vimekamilika na kusakinishwa ipasavyo kulingana na mchoro wa kusanyiko kwenye mwongozoOndoa skrini ya kichujio na uzungushe kiunganishi ili kuona kama kinazunguka kwa urahisi.
6. Fungua skrubu ya skrubu ya maji na ujaze tundu la moshi kwa maji safi, yasiyo na babuzi (kumbuka. hakikisha umeichuja), kisha kaza screw ya maji. Baada ya masaa 12 ya sindano ya maji, upinzani wa insulation ya motor haipaswi kuwa chini ya 150M Q inapopimwa na meza ya 500V ya kutikisa.
7. Kiunganishi cha kebo, kata mkono wa mpira wa mm 120 kutoka mwisho mmoja wa kebo inayotoka na kebo inayolingana na kisu cha fundi umeme kisha uyumbe urefu wa nyaya tatu za msingi katika umbo la kupitiwa, ng'oa msingi wa shaba wa mm 20, ondoa oksidi. safu ya nje ya waya wa shaba na kisu au kitambaa cha mchanga, na ingiza ncha mbili za waya zilizounganishwa kwenye palirs.Baada ya kuifunga safu kwa ukali na waya mzuri wa shaba, solder kabisa na imara, na mchanga wa yoyote. burrs juu ya uso. Kisha, kwa viungo vitatu, tumia mkanda wa insulation ya polyvester ili kuvifunga kwa njia ya nusu iliyopangwa kwa birika tatu. Funga ncha mbili za safu ya kukunja vizuri kwa uzi wa nyion, na kisha utumie njia iliyopangwa nusu kufunga mkanda kwa tabaka tatu. Funga kifaa cha nje na mkanda wa insulation ya shinikizo la juu kwa tabaka tatu. Hatimaye, kunja nyuzi tatu pamoja na kuzifunga mara kwa mara kwa tabaka tano na mkanda wa shinikizo la juu. Kila safu lazima imefungwa vizuri, na viungo vya interlayer lazima ziwe tight na fimm ili kuzuia maji kupenya na kuharibu insulation, Baada ya kuifunga, loweka ndani ya maji kwenye joto la kawaida la 20 'c kwa masaa 12, na kupima upinzani wa insulation na meza ya kutikisa. , ambayo haipaswi kuwa chini ya 100M Ω

 

Mchoro wa mchakato wa wiring cable ni kama ifuatavyo:

 

8. Tumia multimeter ili uangalie ikiwa waya za awamu tatu zimeunganishwa na ikiwa upinzani wa DC ni takriban usawa.
9. Angalia ikiwa saketi na uwezo wa kibadilishaji umeme umejaa kupita kiasi, na kisha unganisha swichi ya ulinzi wa upakiaji au vifaa vya kuanzia. Tazama Jedwali la 2 kwa miundo mahususi, kisha Mimina ndoo ya maji kwenye pampu ya maji kutoka kwa pampu ya maji ili kulainisha fani za mpira kwenye pampu, na kisha uweke pampu ya umeme inayoweza kuzamishwa wima na thabiti. Anza (si zaidi ya sekunde moja) na uangalie ikiwa mwelekeo wa usukani unalingana na ishara ya usukani. Ikiwa sivyo, badilisha viunganishi vyovyote viwili vya kebo ya awamu ya tatu.Kisha sakinisha kichujio na ujiandae kwenda chini ya kisima. Ikiwa inatumiwa katika matukio maalum (kama vile mitaro, mifereji, mito, mabwawa, mabwawa, nk), pampu ya umeme lazima iwekwe chini kwa uhakika.

 

(2) Vifaa na zana za usakinishaji:
1. Jozi moja ya minyororo ya kuinua kwa zaidi ya tani mbili.
2. Tripod yenye urefu wa wima wa si chini ya mita nne.
3. Kamba mbili za kunyongwa (kamba za waya) zinazoweza kubeba uzito wa zaidi ya tani moja (zinaweza kubeba uzito wa seti kamili ya pampu za maji).
4. Weka jozi mbili za clamps (splints).
5. Wrenches, nyundo, screwdrivers, zana za umeme na vyombo, nk.

 

(3) Ufungaji wa pampu ya umeme:
1. Mchoro wa ufungaji wa pampu ya umeme ya chini ya maji umeonyeshwa kwenye Mchoro 2. Vipimo maalum vya ufungaji vinaonyeshwa kwenye Jedwali la 3 "Orodha ya Vipimo vya Ufungaji wa Pumpu ya Umeme ya Submersible".

 

2. Pampu za umeme zinazozamishwa na kichwa chini ya mita 30 zinaweza kuinuliwa moja kwa moja kwenye kisima kwa kutumia mabomba na kamba za waya au kamba nyingine za katani ambazo zinaweza kubeba uzito kamili wa mashine nzima, mabomba ya maji, na maji katika mabomba.

 

3. Pampu zilizo na kichwa cha zaidi ya mita 30 hutumia mabomba ya chuma, na mlolongo wa ufungaji ni kama ifuatavyo:
①Tumia kibano kubana ncha ya juu ya sehemu ya pampu ya maji (motor na pampu ya maji vimeunganishwa kwa wakati huu), inua kwa mnyororo wa kuning'inia, na polepole uifunge ndani ya kisima hadi Weka bani kwenye kichwa cha kisima na uondoe. mnyororo wa kunyongwa.
② Tumia vibano vingine ili kubana bomba, linyanyue kwa mnyororo wa kuning'inia umbali wa sm 15 kutoka kwenye ubao, na uushushe polepole. Kati ya flange ya bomba na flange ya pampuWeka pedi ya mpira mahali pake na kaza bomba na pampu sawasawa na bolts, karanga na washers wa spring.
③ Inua pampu inayoweza kuzama kidogo, ondoa kibano kwenye ncha ya juu ya pampu ya maji, funga kebo kwa uthabiti kwenye bomba la maji kwa mkanda wa plastiki, na uifunge polepole chini hadi Kinano kiwekwe kwenye kisima.
④Tumia njia sawa kufunga mabomba yote ya maji kwenye kisima.
⑤Baada ya kebo ya kuongoza kuunganishwa kwenye swichi ya kudhibiti, inaunganishwa kwenye usambazaji wa umeme wa awamu tatu.


(4) Mambo ya kuzingatia wakati wa usakinishaji:
1. Ikiwa jambo la jamming linapatikana wakati wa mchakato wa kusukuma, pindua au kuvuta bomba la maji ili kuondokana na hatua ya jamming. Ikiwa hatua mbalimbali bado hazifanyi kazi, tafadhaliUsilazimishe pampu chini ili kuepuka uharibifu wa pampu ya umeme inayozama na kisima.
2. Wakati wa ufungaji, pedi ya mpira inapaswa kuwekwa kwenye flange ya kila bomba na kuimarishwa sawasawa.
3. Wakati pampu ya maji inaposhushwa ndani ya kisima, inapaswa kuwekwa katikati ya bomba la kisima ili kuzuia pampu kukimbia dhidi ya ukuta wa kisima kwa muda mrefu, na kusababisha pampu kutetemeka na motor kufagia na kuwaka. .
4. Tambua kina cha pampu ya maji hadi chini ya kisima kulingana na mchanga unaopita na hali ya silt ya kisima. Usizike pampu kwenye matope. Umbali kutoka kwa pampu ya maji hadi chini ya kisima kwa ujumla sio chini ya mita 3 (ona Mchoro 2).
5. Kina cha kuingilia maji cha pampu ya maji haipaswi kuwa chini ya mita 1-1.5 kutoka ngazi ya maji yenye nguvu hadi nodi ya ingizo la maji (ona Mchoro 2). Vinginevyo, fani za pampu za maji zinaweza kuharibiwa kwa urahisi.
6. Kuinua kwa pampu ya maji hawezi kuwa chini sana. Vinginevyo, vali ya lango inahitaji kusakinishwa kwenye bomba la maji la kisima ili kudhibiti mtiririko wa pampu kwenye sehemu iliyokadiriwa ya mtiririko ili kuzuia injini isijazwe na kuteketezwa kwa sababu ya viwango vikubwa vya mtiririko.
7. Wakati pampu ya maji inapoendesha, pato la maji linapaswa kuendelea na hata, sasa inapaswa kuwa imara (chini ya hali ya kazi iliyopimwa, kwa ujumla si zaidi ya 10% ya sasa iliyopimwa), na haipaswi kuwa na vibration au kelele. Ikiwa kuna hali isiyo ya kawaida, mashine inapaswa kusimamishwa ili kujua sababu na kuiondoa.
8. Wakati wa kufunga, makini na mpangilio wa waya wa kutuliza motor (angalia Mchoro 2). Wakati bomba la maji ni bomba la chuma, liongoze kutoka kwenye kisima cha kisima; wakati bomba la maji ni bomba la plastiki, liongoze kutoka kwa alama ya kutuliza pampu ya umeme.

 

 
Matengenezo na Matengenezo

 After the installation of the underwater pump, the insulation resistance and three-phase continuity of the switch face should be rechecked, and the connection between the instrument and the start device should be checked for any errors. If there is no problem, you can start to test the machine. After the start, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has noise or vibration. If everything is normal, it can be put into operation. After the first operation of the pump for four hours, the motor should be shut down and tested for thermal insulation resistance quickly. Its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and causing the motor to burn out due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal. If the following conditions are found, the machine should be shut down immediately to eliminate the fault: the current exceeds 20% under rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the underwater pump becomes violently vibrating or making noise; the supply voltage is lower than 340 volts; a fuse is blown out; the water pipe is damaged; the motor's thermal insulation resistance to the earth is less than 0.5 megaohm. The sequence of disassembly is: untie the cable fastening, remove the pipeline part, remove the line protection plate, screw down the water discharge bolt and discharge all the water in the motor chamber, remove the filter and loosen the coupling fixing screw of the motor shaft. The sequence of disassembly of the pump is: (see Figure 1) inlet section, impeller, guide housing, impeller, check the valve body. When removing the impeller, use special tools to loosen the taper sleeve of the impeller. Avoid bending the pump shaft and damaging the components throughout the process. The disassembly process of the motor is: (see Figure 1) put the motor on the platform, and remove the bolts, base, shaft head lock nut, thrust plate, key, lower guide plate (transverse bolt), bearing seat, screw knife seat from the bottom of the motor in order (take care not to damage the winding), and finally remove the connecting part and the upper guide bearing seat. Before assembling the unit, the rust and dirt of each part should be cleaned, and the sealant should be applied to each mating surface and fastener, and then assembled in reverse order of disassembly (the movement of the motor shaft after assembly is about one millimeter). After assembly, the coupling should be rotated flexibly and put on the filter for test. Once a year, or if less than a year of operation but has been immersed for two years, the underwater electric pump must be disassembled for maintenance in accordance with Article 5 and replace worn parts to ensure the normal operation and durability of the pump.

 

 
Uhifadhi na Uhifadhi

 1, kuweka maji katika cavity motor (hasa katika majira ya baridi ili kuzuia motor kutoka kufungia), na kufunga cable vizuri.

 2, hifadhi katika chumba cha ndani bila vitu babuzi na gesi, na joto chini ya 40 °C.

 3, matumizi ya muda mrefu lazima makini na kuzuia kutu ya pampu submersible.

 

 
Sehemu za Kuvaa
  • Msukumo
  • Sleeve ya shimoni
  • Sleeve ya shimoni ya mpira
  • Pete ya kuziba

 
Matukio ya Maombi

01 Unywaji wa maji ya kisima kirefu

02 Ugavi wa maji wa hali ya juu

03 usambazaji wa maji wa mlima 

04 maji ya mnara

05 Umwagiliaji wa kilimo

06 umwagiliaji wa bustani

07 ulaji wa maji ya mto

08 maji ya nyumbani

 

Ikiwa una nia ya bidhaa zetu, unaweza kuchagua kuacha maelezo yako hapa, na tutawasiliana nawe baada ya muda mfupi.


Andika ujumbe wako hapa na ututumie

Ikiwa una nia ya bidhaa zetu, unaweza kuchagua kuacha maelezo yako hapa, na tutawasiliana nawe baada ya muda mfupi.


swSwahili