300QJR Bomba ya Kisima Inayozamishwa kwa Kina

Fanya usindikaji wa OEM! Kulingana na mahitaji ya mtumiaji, kubuni na utengenezaji wa aina mbalimbali za mahitaji maalum ya magari yasiyo ya kawaida ya chini ya maji na pampu. Viwango vya utekelezaji wa bidhaa: GB/T2816-2014 "pampu inayoweza kuingizwa vizuri", GB/T2818-2014 "motor inayoingia vizuri ya asynchronous". WhatsApp:17855846335
PDF DOWNLOAD
Maelezo
Lebo
 
Muhtasari wa Bidhaa

This hot water pump adopts the motor made of 50W400 grade high quality cold rolled silicon steel, which is stamped by high speed punch press. It has the advantages of low stator iron loss and low self-heating. The motor winding is designed for hot water pump, high temperature resistance and anti-aging. The winding has water resistance, and adopts 3CR13 stainless steel blade shaft, high temperature resistant bushing and other high quality accessories to enable it to operate for a long time at high temperature, and can be used with frequency converter, so as to automatically adjust according to the amount of water used. This hot water pump is the ideal choice for your hot water equipment, which can operate stably and efficiently, providing you with a lasting hot water supply.

 

 
Masharti ya Matumizi

The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply submersible pump. With water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not more than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not more than 1.5mg/L; chloride ion content is not more than 400mg/L. The electric pump adopts closed or water sealed wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, and then tighten the water and air bolts, otherwise not to use. Its work should be completely immersed in water, immersion depth is not more than 70 meters, the distance between the bottom of the pump and the bottom of the well is not less than 3 meters. Well water inflow quantity should be able to meet the electric pump water output and continuous operation, the output water quantity should be controlled at 0.7-1.2 times of the rated flow. The well should be vertical, the electric pump can not be used horizontally or inclined, only vertically placed. The electric pump must be equipped with cables and external overload protection device as required. It is strictly prohibited to conduct no-load test under no water condition.

 

 
Maana ya Mfano

Read More About submersible well pumps

 

 
Marejeleo ya Mfano wa Sehemu
Mfano Mtiririko (m3/h) Kichwa
(m)

Kasi ya mzunguko

(badilisha / uhakika)

Pampu ya maji(%)  Kituo
kipenyo
(mm)
Inatumika vizuri
kipenyo(mm) 
 Imekadiriwa
power(KW)
Imekadiriwa
voltage (V)
Imekadiriwa
sasa (A)
Ufanisi (%) nguvu factorcos   Kitengo
Ukubwa wa juu wa radial(mm)
Toa maoni
300QJ200-40 200 40 2900 76 150  300juu 37 380 77.8 85.0 0.85 281  
300QJ200-60 60 55 115 85.5 0.85  
300QJ200-80 80 75 154.1 86.0 0.86  
300QJ200-100 100 90 183.8 86.5 0.86  
300QJ200-120 120 100 204.3 86.5 0.86  
300QJ200-140 140 125 249.5 87.5 0.87  
300QJ200-160 160 140 277.8 88.0 0.87  
300QJ200-180 180 160 317.5 88.0 0.87  
300QJ200-200 200 185 367.2 88.0 0.87  
300QJ200-240 240 220 436.6 88.0 0.87  
300QJ320-30 320 30 2900 77 200  300juu 45 380 94.6 85.0 0.85 281  
300QJ320-60 60 90 183.8 86.5 0.86  
300QJ320-90 90 125 249.5 87.5 0.87  
300QJ320-120 120 160 317.5 88.0 0.87  

 

 
Tahadhari za Usalama

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, madhubuti kulingana na masharti ya kuinua pampu, mtiririko mbalimbali ya matumizi, ili kuzuia mtiririko wa chini au kuinua high kusukumia nguvu, kuzaa kutia na sehemu nyingine ya kuvaa, overload motor kuchomwa moto.

6, baada ya pampu chini ya kisima, kipimo cha motor kwa upinzani ardhi insulation haipaswi kuwa chini ya 100M, baada ya kuanza kuchunguza voltage na sasa, kuangalia motor vilima insulation, iwe kulingana na mahitaji; pampu kuhifadhi joto eneo kama chini ya kiwango kufungia, lazima kavu maji katika cavity motor, kuzuia cavity motor maji barafu uharibifu unaosababishwa na joto la chini.

 

 
Utangulizi wa Muundo

The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other components. The main characteristic of this product is that the motor is a water-cooled submersible three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom is used to adjust the expansion-contraction pressure difference in the body caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed at the bottom of the motor. The lubrication of the motor and the pump bearing is realized through water lubrication. The stator winding of the motor is made of high-quality well motor winding wire, with high insulation performance. The pump is designed by computer CAD, with simple structure and good technical performance.

Read More About 4 inch deep well submersible pump
 
Sakinisha

(1) Maandalizi kabla ya ufungaji:
1. Angalia ikiwa pampu inayoweza kuzama inakidhi masharti ya matumizi na upeo uliobainishwa kwenye mwongozo.
2. Kwa kutumia kipenyo kizito chenye kipenyo sawa na kipenyo cha juu zaidi cha nje cha pampu inayoweza kuzamishwa, pima ikiwa kipenyo cha ndani cha kisima kinaweza kutoshea pampu inayoweza kuzamishwa, na kupima kama kina cha kisima kinakidhi mahitaji ya usakinishaji.
3. Angalia kama kisima ni safi na kama maji ya kisima ni machafu. Kamwe usitumie pampu ya umeme inayoweza kuzama ili kuosha tope la pampu ya kisima na maji ya mchanga ili kuepuka uharibifu wa mapema wa pampu ya umeme inayoweza kuzamishwa.
4. Angalia ikiwa nafasi ya bani ya usakinishaji ya welhead inafaa na ikiwa inaweza kuhimili ubora wa kitengo kizima.
5. Angalia ikiwa vijenzi vya pampu inayoweza kuzamishwa vimekamilika na kusakinishwa ipasavyo kulingana na mchoro wa kusanyiko kwenye mwongozoOndoa skrini ya kichujio na uzungushe kiunganishi ili kuona kama kinazunguka kwa urahisi.
6. Fungua skrubu ya skrubu ya maji na ujaze tundu la moshi kwa maji safi, yasiyo na babuzi (kumbuka. hakikisha umeichuja), kisha kaza screw ya maji. Baada ya masaa 12 ya sindano ya maji, upinzani wa insulation ya motor haipaswi kuwa chini ya 150M Q inapopimwa na meza ya 500V ya kutikisa.
7. Kiunganishi cha kebo, kata mkono wa mpira wa mm 120 kutoka mwisho mmoja wa kebo inayotoka na kebo inayolingana na kisu cha fundi umeme kisha uyumbe urefu wa nyaya tatu za msingi katika umbo la kupitiwa, ng'oa msingi wa shaba wa mm 20, ondoa oksidi. safu ya nje ya waya wa shaba na kisu au kitambaa cha mchanga, na ingiza ncha mbili za waya zilizounganishwa kwenye palirs.Baada ya kuifunga safu kwa ukali na waya mzuri wa shaba, solder kabisa na imara, na mchanga wa yoyote. burrs juu ya uso. Kisha, kwa viungo vitatu, tumia mkanda wa insulation ya polyvester ili kuvifunga kwa njia ya nusu iliyopangwa kwa birika tatu. Funga ncha mbili za safu ya kukunja vizuri kwa uzi wa nyion, na kisha utumie njia iliyopangwa nusu kufunga mkanda kwa tabaka tatu. Funga kifaa cha nje na mkanda wa insulation ya shinikizo la juu kwa tabaka tatu. Hatimaye, kunja nyuzi tatu pamoja na kuzifunga mara kwa mara kwa tabaka tano na mkanda wa shinikizo la juu. Kila safu lazima imefungwa vizuri, na viungo vya interlayer lazima ziwe tight na fimm ili kuzuia maji kupenya na kuharibu insulation, Baada ya kuifunga, loweka ndani ya maji kwenye joto la kawaida la 20 'c kwa masaa 12, na kupima upinzani wa insulation na meza ya kutikisa. , ambayo haipaswi kuwa chini ya 100M Ω

 

Mchoro wa mchakato wa wiring cable ni kama ifuatavyo:
Read More About submersible well water pump

 

8. Tumia multimeter ili uangalie ikiwa waya za awamu tatu zimeunganishwa na ikiwa upinzani wa DC ni takriban usawa.
9. Angalia ikiwa saketi na uwezo wa kibadilishaji umeme umejaa kupita kiasi, na kisha unganisha swichi ya ulinzi wa upakiaji au vifaa vya kuanzia. Tazama Jedwali la 2 kwa miundo mahususi, kisha Mimina ndoo ya maji kwenye pampu ya maji kutoka kwa pampu ya maji ili kulainisha fani za mpira kwenye pampu, na kisha uweke pampu ya umeme inayoweza kuzamishwa wima na thabiti. Anza (si zaidi ya sekunde moja) na uangalie ikiwa mwelekeo wa usukani unalingana na ishara ya usukani. Ikiwa sivyo, badilisha viunganishi vyovyote viwili vya kebo ya awamu ya tatu.Kisha sakinisha kichujio na ujiandae kwenda chini ya kisima. Ikiwa inatumiwa katika matukio maalum (kama vile mitaro, mifereji, mito, mabwawa, mabwawa, nk), pampu ya umeme lazima iwekwe chini kwa uhakika.

 

(2) Vifaa na zana za usakinishaji:
1. Jozi moja ya minyororo ya kuinua kwa zaidi ya tani mbili.
2. Tripod yenye urefu wa wima wa si chini ya mita nne.
3. Kamba mbili za kunyongwa (kamba za waya) zinazoweza kubeba uzito wa zaidi ya tani moja (zinaweza kubeba uzito wa seti kamili ya pampu za maji).
4. Weka jozi mbili za clamps (splints).
5. Wrenches, nyundo, screwdrivers, zana za umeme na vyombo, nk.

 

(3) Ufungaji wa pampu ya umeme:
1. Mchoro wa ufungaji wa pampu ya umeme ya chini ya maji umeonyeshwa kwenye Mchoro 2. Vipimo maalum vya ufungaji vinaonyeshwa kwenye Jedwali la 3 "Orodha ya Vipimo vya Ufungaji wa Pumpu ya Umeme ya Submersible".

2. Pampu za umeme zinazozamishwa na kichwa chini ya mita 30 zinaweza kuinuliwa moja kwa moja kwenye kisima kwa kutumia mabomba na kamba za waya au kamba nyingine za katani ambazo zinaweza kubeba uzito kamili wa mashine nzima, mabomba ya maji, na maji katika mabomba.

3. Pampu zilizo na kichwa cha zaidi ya mita 30 hutumia mabomba ya chuma, na mlolongo wa ufungaji ni kama ifuatavyo:
①Tumia kibano kubana ncha ya juu ya sehemu ya pampu ya maji (motor na pampu ya maji vimeunganishwa kwa wakati huu), inua kwa mnyororo wa kuning'inia, na polepole uifunge ndani ya kisima hadi Weka bani kwenye kichwa cha kisima na uondoe. mnyororo wa kunyongwa.
② Tumia vibano vingine ili kubana bomba, linyanyue kwa mnyororo wa kuning'inia umbali wa sm 15 kutoka kwenye ubao, na uushushe polepole. Kati ya flange ya bomba na flange ya pampuWeka pedi ya mpira mahali pake na kaza bomba na pampu sawasawa na bolts, karanga na washers wa spring.
③ Inua pampu inayoweza kuzama kidogo, ondoa kibano kwenye ncha ya juu ya pampu ya maji, funga kebo kwa uthabiti kwenye bomba la maji kwa mkanda wa plastiki, na uifunge polepole chini hadi Kinano kiwekwe kwenye kisima.
④Tumia njia sawa kufunga mabomba yote ya maji kwenye kisima.
⑤Baada ya kebo ya kuongoza kuunganishwa kwenye swichi ya kudhibiti, inaunganishwa kwenye usambazaji wa umeme wa awamu tatu.


(4) Mambo ya kuzingatia wakati wa usakinishaji:
1. Ikiwa jambo la jamming linapatikana wakati wa mchakato wa kusukuma, pindua au kuvuta bomba la maji ili kuondokana na hatua ya jamming. Ikiwa hatua mbalimbali bado hazifanyi kazi, tafadhaliUsilazimishe pampu chini ili kuepuka uharibifu wa pampu ya umeme inayozama na kisima.
2. Wakati wa ufungaji, pedi ya mpira inapaswa kuwekwa kwenye flange ya kila bomba na kuimarishwa sawasawa.
3. Wakati pampu ya maji inaposhushwa ndani ya kisima, inapaswa kuwekwa katikati ya bomba la kisima ili kuzuia pampu kukimbia dhidi ya ukuta wa kisima kwa muda mrefu, na kusababisha pampu kutetemeka na motor kufagia na kuwaka. .
4. Tambua kina cha pampu ya maji hadi chini ya kisima kulingana na mchanga unaopita na hali ya silt ya kisima. Usizike pampu kwenye matope. Umbali kutoka kwa pampu ya maji hadi chini ya kisima kwa ujumla sio chini ya mita 3 (ona Mchoro 2).
5. Kina cha kuingilia maji cha pampu ya maji haipaswi kuwa chini ya mita 1-1.5 kutoka ngazi ya maji yenye nguvu hadi nodi ya ingizo la maji (ona Mchoro 2). Vinginevyo, fani za pampu za maji zinaweza kuharibiwa kwa urahisi.
6. Kuinua kwa pampu ya maji hawezi kuwa chini sana. Vinginevyo, vali ya lango inahitaji kusakinishwa kwenye bomba la maji la kisima ili kudhibiti mtiririko wa pampu kwenye sehemu iliyokadiriwa ya mtiririko ili kuzuia injini isijazwe na kuteketezwa kwa sababu ya viwango vikubwa vya mtiririko.
7. Wakati pampu ya maji inapoendesha, pato la maji linapaswa kuendelea na hata, sasa inapaswa kuwa imara (chini ya hali ya kazi iliyopimwa, kwa ujumla si zaidi ya 10% ya sasa iliyopimwa), na haipaswi kuwa na vibration au kelele. Ikiwa kuna hali isiyo ya kawaida, mashine inapaswa kusimamishwa ili kujua sababu na kuiondoa.
8. Wakati wa kufunga, makini na mpangilio wa waya wa kutuliza motor (angalia Mchoro 2). Wakati bomba la maji ni bomba la chuma, liongoze kutoka kwenye kisima cha kisima; wakati bomba la maji ni bomba la plastiki, liongoze kutoka kwa alama ya kutuliza pampu ya umeme.

 

 
Matengenezo na Matengenezo

 After installation of the underwater pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether the connection between the instrument and the starting equipment is wrong. If there is no problem, you can start the test machine. After starting, observe whether the indication reading of each instrument is correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has any noise or vibration. If everything is normal, it can be put into operation. Four hours after the first operation of the pump, it should be turned off and the thermal insulation resistance of the motor should be quickly tested, and its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing, resulting in the motor burning due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to eliminate the fault:

1 the current exceeds 20% under the rated working condition.

2 the dynamic water level drops to the inlet section, resulting in intermittent drainage.

3 the underwater pump vibrates violently or emits huge noise.

4 the supply voltage is lower than 340 volts.

5 a fuse is burned.

6 the water pipe is damaged.

7 the thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.

When disassembling the device, it is necessary to untie the cable bundle and remove the pipeline part and the line protection plate. Remove the drain bolt and exclude all water in the motor chamber. Remove the filter element and loosen the screw on the coupling fixed to the motor shaft. Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (pay attention to placing the device horizontally when separating to prevent the bending of the pump shaft). The sequence of disassembling the pump is as follows: (see Figure 1) water inlet section, impeller, water inlet shell, impeller. Check the valve body, and use a special tool to loosen the cone sleeve fixed to the impeller when removing the impeller. In the process of disassembly, avoid bending the pump shaft and damaging various components. The disassembly process of the motor is as follows: (see Figure 1) put the motor on the platform, and remove the nuts on the screw (pull rod bolt), base, shaft head lock nut, thrust plate, key and lower guide rail - bearing seat, bolt, and then remove the rotor (be careful not to damage the wiring harness), and finally remove the connecting parts and upper guide bearing seat. Unit assembly: before assembly, the rust and dirt of each component should be cleaned, and the sealant should be coated on each mating surface and fastener, and then assembled in the opposite order of disassembly (the movement of the motor shaft after assembly is about one millimeter), after the assembly is completed, the coupling should be flexibly rotated, and then the filter element should be placed for testing. Each time the underwater electric pump has been used for one year, or less than one year but has been immersed for two years, it must be disassembled and inspected in accordance with Article 5 and replace the worn parts.

 

 
Uhifadhi na Uhifadhi

 1, kuweka maji katika cavity motor (hasa katika majira ya baridi ili kuzuia motor kutoka kufungia), na kufunga cable vizuri.

 2, hifadhi katika chumba cha ndani bila vitu babuzi na gesi, na joto chini ya 40 °C.

 3, matumizi ya muda mrefu lazima makini na kuzuia kutu ya pampu submersible.

 

 
Sehemu za Kuvaa
  • Msukumo
  • Sleeve ya shimoni
  • Sleeve ya shimoni ya mpira
  • Pete ya kuziba

 
Matukio ya Maombi

01 Unywaji wa maji ya kisima kirefu

02 Ugavi wa maji wa hali ya juu

03 usambazaji wa maji wa mlima 

04 maji ya mnara

05 Umwagiliaji wa kilimo

06 umwagiliaji wa bustani

07 ulaji wa maji ya mto

08 maji ya nyumbani

 

Ikiwa una nia ya bidhaa zetu, unaweza kuchagua kuacha maelezo yako hapa, na tutawasiliana nawe baada ya muda mfupi.


Andika ujumbe wako hapa na ututumie

Ikiwa una nia ya bidhaa zetu, unaweza kuchagua kuacha maelezo yako hapa, na tutawasiliana nawe baada ya muda mfupi.


swSwahili