250QJP Peep Well dompelpomp

Undernimme OEM-ferwurking! Neffens brûker easken, ûntwerp en fabrikaazje fan ferskate soarten spesjale easken fan net-standert dompelmotor en pomp. Produktimplementaasjenormen: GB/T2816-2014 "goed dompelpomp", GB / T2818-2014 "goed dompelbere asynchrone motor". WhatsApp: 17855846335
PDF DOWNLOAD
Details
Tags
 
produktoersjoech

This series of fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are equipped with alloy copper sleeves with water as lubricant. Stainless steel bushings replace ball bearings, avoiding the problems of easy rust of ball bearings and burnout of motor due to lack of oil and wear. Most suitable for music fountain, all models can be used horizontally.

 

 
Betingsten fan gebrûk

1, Netzteil: trije-fase AC 380V (tolerânsje + / - 5%), 50HZ (tolerânsje + / - 1%).

2, wetterkwaliteit:

(1) water temperature is not higher than 20 °C;

(2) fêste ûnreinheden ynhâld (massa ratio) is net grutter as 0,01%;

(3) PH wearde (pH) 6,5-8,5;

(4) wetterstof sulfide ynhâld is net grutter as 1.5mg / L;

(5) chloride ion ynhâld is net grutter as 400mg / L.

3, de motor is sletten of mei wetter fol wiete struktuer, foardat gebrûk de ûnderdompele motor holte moat wêze fol mei skjin wetter, foar te kommen falske fol, en dan strak it wetter ynjeksje, lucht release bouten, oars net tastien te brûken

4, dompelpomp moat folslein ûnderdompele wurde yn it wetter, de dûkdjipte is net grutter as 70m, de boaiem fan 'e dompelpomp fan' e boaiem fan 'e put is net minder as 3m.

5, de put wetter stream moat wêze kinne om te foldwaan oan de submersible pomp wetter útfier en trochgeande operaasje, de submersible pomp wetter útfier moat wurde regele op 0,7 - 1,2 kear de rated stream.

6, de put moat rjocht wêze, de dompelpomp kin net brûkt wurde of dumpt, allinich fertikaal gebrûk.

7, de dompelpomp moat wurde matched mei de kabel neffens de easken, en de eksterne overload beskerming apparaat.

8, de pomp is strang ferbean sûnder wetter no-load test masine

 

 
Model Meaning

250QJP Peep Well Submersible Pump

 
Partial Model Reference
Model Flow (m3/h) Holle
(m)

Rotatingspeed

(feroarje/punt)

Wetterpomp(%)  Outlet
diameter
(mm)
Goed tapast
diameter (mm) 
 Rated
power(KW)
Rated
spanning (V)
Rated
aktuele (A)
Motor effisjinsje (%) power factorcosφ   Ienheid
Radiale Maksimum grutte (mm)
Opmerking
250QJ50-40 50 40 2875 72 80  250boppe 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250boppe 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250boppe 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250boppe 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250boppe 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250boppe 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250boppe 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250boppe 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250boppe 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Feiligens foarsoarchsmaatregels

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, strikt neffens de bepalingen fan 'e pomplift, streamberik fan gebrûk, om lege trochstreaming of hege lift pompekrêft te foarkommen, de thrust bearing en oare dielen fan' e wearze, de motor overload ferbaarnd

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Ynlieding ta Struktuer

The introduction and structure of this pump product mainly include pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main characteristics of this pump product include the use of water-cooled wet submersible three-phase asynchronous motor, the motor cavity is filled with clean water to cool the motor and lubricate the bearing, the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and the sand ring is installed to form a sand prevention structure. In order to avoid the pump shaft jumping at startup, the pump shaft and the motor shaft are connected together through the coupling, and the thrust bearing is installed at the lower part of the motor. The motor and pump bearing lubrication adopts water lubrication. The stator winding of the motor adopts high quality submersible motor winding, with high insulation performance. The pump adopts computer CAD design, simple structure and superior technical performance.

250QJP Peep Well Submersible Pump
 
Ynstallearje

(1) Tarieding foar ynstallaasje:
1. Kontrolearje oft de dompelpomp foldocht oan de gebrûksbetingsten en omfang spesifisearre yn 'e hantlieding.
2. Mei in swiere objekt mei in diameter lyk oan de maksimale bûtendiameter fan 'e dompelpomp, mjitte oft de binnendiameter fan' e putboring de dompelpomp passe kin, en mjit oft de putdjipte foldocht oan de ynstallaasjeeasken.
3. Kontrolearje oft de putboring skjin is en oft it putwetter troebel is. Nea brûke in dompelpomp elektryske pomp te waskjen de welor pomp modder en sân wetter te kommen foar betiid skea oan de dompelpomp elektryske pomp.
4. Kontrolearje oft de posysje fan de welhead ynstallaasje clamp is geskikt en oft it kin wjerstean de kwaliteit fan de hiele ienheid
5. Kontrolearje oft de submersible pomp ûnderdielen binne kompleet en ynstallearre goed neffens de gearstalling diagram yn de hânlieding Ferwiderje it filter skerm en draaie de koppeling om te sjen oft it draait fleksibel
6. Skroef de wetterskroef los en folje de motorholte mei skjin, net-korrosyf wetter (notysje. Wês wis dat it opfolje), dan draait de wetterskroef oan. Nei 12 oeren fan wetterynjeksje moat de isolaasjeferset fan 'e motor net minder wêze dan 150M Q as mjitten mei in 500V skoddetafel.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

It taheakke prosesdiagram foar kabelbedrading is as folget:
250QJP Peep Well Submersible Pump

 

8. Brûk in multimeter om te kontrolearjen oft de trije-fase triedden binne ferbûn en oft de DC ferset is likernôch lykwichtich.
9. Kontrolearje oft it circuit en transformator kapasiteit binne oerladen, en dan ferbinen de oerlêst beskerming switch of begjinnende apparatuer. Sjoch Tabel 2 foar spesifike modellen, en dan Giet in amer mei wetter yn 'e wetterpomp út' e wetterpompútlaat om de rubberlagers yn 'e pomp te smeerjen, en set dan de ûnderdompelbere elektryske pomp rjochtop en steady.Start (net mear as ien sekonde) en kontrolearje oft de stjoerrjochting oerienkomt mei it stjoerteken. As net, ruilje alle twa Anschlüsse fan 'e trije-faze kabel. Ynstallearje dan it filter en meitsje jo klear om de put del te gean. As brûkt by spesjale gelegenheden (lykas sleatten, sleatten, rivieren, fivers, fivers, ensfh.), De elektryske pomp moat betrouber wurde grûn.

 

(2) Ynstallaasje apparatuer en ark:
1. Ien pear liftkeatlingen foar mear as twa ton.
2. In tripod mei in fertikale hichte fan net minder as fjouwer meter.
3. Twa hingjende touwen (wire touwen) dy't in gewicht fan mear as ien ton drage kinne (kinne it gewicht fan in folsleine set wetterpompen drage).
4. Ynstallearje twa pearen fan clamps (spalken).
5. Wrenches, hammers, schroevendraaiers, elektryske ark en ynstruminten, ensfh.

 

(3) Elektryske pomp ynstallaasje:
1. It ynstallaasjediagram fan 'e ûnderdompele elektryske pomp wurdt werjûn yn figuer 2. De spesifike ynstallaasjedimensjes wurde werjûn yn Tabel 3 "List fan ynstallaasje-ôfmjittings fan 'e ûnderdompele elektryske pomp".

 

2. Submersible elektryske pompen mei in kop minder as 30 meter kinne direkt yn 'e boarne ophelle wurde mei slangen en draadseilen of oare himp-touwen dy't it folsleine gewicht fan' e hiele masine, wetterpipes, en wetter yn 'e pipes drage kinne.

 

3. Pompen mei in kop fan mear as 30 meter brûke stielen pipen, en de ynstallaasje folchoarder is as folget:
①Gebrûk in klem om it boppeste ein fan it wetterpompdiel te klemmen (de motor en de wetterpomp binne op dit stuit ferbûn), til it mei in hingjende keatling op en bine it stadichoan yn 'e put oant Set de klem op' e putkop en fuortsmite hingjende ketting.
② Brûk in oar pear klemmen om in piip te klemmen, til it mei in hingjende ketting 15 sm fuort fan 'e flange, en ferleegje it stadich. Tusken pipe flange en pomp flangePut de rubberen pad yn plak en strak de piip en pomp gelyk mei bouten, moeren en spring washers.
③ Til de dompelpomp in bytsje op, ferwiderje de klem op 'e boppeste ein fan' e wetterpomp, bine de kabel stevich oan 'e wetterpipe mei in plestik tape, en bûgje it stadichoan oant De klem wurdt pleatst by de putkop.
④Brûk deselde metoade om alle wetterpipes yn 'e put te binen.
⑤ Neidat de lead-out kabel is ferbûn mei de kontrôle switch, it is ferbûn oan de trije-fase Netzteil.


(4) Dingen om op te merken by ynstallaasje:
1. As in jamming ferskynsel wurdt fûn tidens it pompen proses, draaie of lûke de wetter piip te oerwinnen it jamming punt. As ferskate maatregels noch net wurkje, twinge asjebleaft de pomp net omleech om skea oan 'e dompelpomp en de put te foarkommen.
2. By ynstallaasje moat in rubberen pad op 'e flange fan elke piip pleatst wurde en gelijkmatig oanskerpe.
3. As de wetterpomp yn 'e boarne ferlege wurdt, moat it yn' e midden fan 'e putpipe pleatst wurde om te foarkommen dat de pomp lang tsjin' e wellmuorre rint, wêrtroch't de pomp trillet en de motor sweep en brânt .
4. Bepale de djipte fan 'e wetterpomp nei de boaiem fan' e boarne neffens de streamende sân- en siltbetingsten fan 'e boarne. Begrave de pomp net yn 'e modder. De ôfstân fan 'e wetterpomp nei de boaiem fan' e put is oer it generaal net minder as 3 meter (sjoch figuer 2).
5. De wetteryngongsdjipte fan 'e wetterpomp moat net minder wêze as 1-1,5 meter fan it dynamyske wetterpeil nei it wetteryntreeknooppunt (sjoch figuer 2). Oars kinne de wetterpomplagers maklik skea wurde.
6. De lift fan 'e wetterpomp kin net te leech wêze. Oars, in poarte fentyl moat wurde ynstallearre op de wellhead wetter pipeline te kontrolearjen de pomp trochstreaming op de rated flow punt om foar te kommen dat de motor wurdt oerladen en útbaarnd fanwege grutte stream tariven.
7. As de wetterpomp rint, moat de wetterútfier kontinuële en sels wêze, de aktuele moat stabyl wêze (ûnder beoardielde wurkomstannichheden, oer it generaal net mear as 10% fan 'e nominearre aktuele), en der moat gjin trilling of lûd wêze. As der in abnormaliteit is, moat de masine wurde stoppe om de oarsaak te finen en it te eliminearjen.
8. By it ynstallearjen, betelje omtinken oan de ynstelling fan 'e motor grûndraad (sjoch figuer 2). As it wetter piip is in stielen piip, liedt it út de puthead clamp; as it wetter piip is in plestik piip, liedt it út 'e grûn mark fan' e elektryske pomp.

 

 
Ûnderhâld en ûnderhâld

 After the installation of the underwater pump, the insulation resistance and three-phase continuity of the switch face should be rechecked, and the connection between the instrument and the start device should be checked for any errors. If there is no problem, you can start to test the machine. After the start, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has noise or vibration. If everything is normal, it can be put into operation. After the first operation of the pump for four hours, the motor should be shut down and tested for thermal insulation resistance quickly. Its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and causing the motor to burn out due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal. If the following conditions are found, the machine should be shut down immediately to eliminate the fault: the current exceeds 20% under rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the underwater pump becomes violently vibrating or making noise; the supply voltage is lower than 340 volts; a fuse is blown out; the water pipe is damaged; the motor's thermal insulation resistance to the earth is less than 0.5 megaohm. The sequence of disassembly is: untie the cable fastening, remove the pipeline part, remove the line protection plate, screw down the water discharge bolt and discharge all the water in the motor chamber, remove the filter and loosen the coupling fixing screw of the motor shaft. The sequence of disassembly of the pump is: (see Figure 1) inlet section, impeller, guide housing, impeller, check the valve body. When removing the impeller, use special tools to loosen the taper sleeve of the impeller. Avoid bending the pump shaft and damaging the components throughout the process. The disassembly process of the motor is: (see Figure 1) put the motor on the platform, and remove the bolts, base, shaft head lock nut, thrust plate, key, lower guide plate (transverse bolt), bearing seat, screw knife seat from the bottom of the motor in order (take care not to damage the winding), and finally remove the connecting part and the upper guide bearing seat. Before assembling the unit, the rust and dirt of each part should be cleaned, and the sealant should be applied to each mating surface and fastener, and then assembled in reverse order of disassembly (the movement of the motor shaft after assembly is about one millimeter). After assembly, the coupling should be rotated flexibly and put on the filter for test. Once a year, or if less than a year of operation but has been immersed for two years, the underwater electric pump must be disassembled for maintenance in accordance with Article 5 and replace worn parts to ensure the normal operation and durability of the pump.

 

 
Opslach en bewar

 1, set it wetter yn 'e motorholte (benammen yn' e winter om foar te kommen dat de motor befriest), en bine de kabel goed.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, lange-termyn gebrûk moatte betelje omtinken foar de roest previnsje fan dompelpompen.

 

 
Wearing Parts
  • Impeller
  • Shaft mouwe
  • Rubber shaft sleeve
  • Segelring

 
Applikaasje senario

01 Djippe boarne wetter yntak

02 Hege wetterfoarsjenning

03 berch wetterfoarsjenning 

04 toer wetter

05 Agraryske yrrigaasje

06 tún yrrigaasje

07 rivier wetter yntak

08 húshâldlik wetter

 

As jo ​​ynteressearre binne yn ús produkten, kinne jo kieze in ferlitte jo ynformaasje hjir, en wy sille yn kontakt mei jo koart.


Skriuw jo berjocht hjir en stjoer it nei ús

As jo ​​ynteressearre binne yn ús produkten, kinne jo kieze in ferlitte jo ynformaasje hjir, en wy sille yn kontakt mei jo koart.


fyFrisian