250QJR Deep Well Submersible Pump

Isagawa ang pagproseso ng OEM! Ayon sa mga kinakailangan ng gumagamit, disenyo at paggawa ng iba't ibang uri ng mga espesyal na pangangailangan ng non-standard na submersible motor at pump. Ang mga pamantayan sa pagpapatupad ng produkto: GB/T2816-2014 "well submersible pump", GB/T2818-2014 "well submersible asynchronous motor". WhatsApp:17855846335
PDF DOWNLOAD
Mga Detalye
Mga tag
 
Pangkalahatang-ideya ng Produkto

The hot water pump adopts 50W400 grade high quality cold rolled silicon steel, stamped by high speed punch, with the advantages of low stator iron loss and low self-heating. The motor winding is specially designed for high temperature and anti-aging hot water motor. The winding is waterproof, and the high quality accessories such as 3CR13 stainless steel impeller shaft and high temperature durable bushing make it able to operate at high temperature for a long time, and can be used with frequency converter, which can be automatically adjusted according to the water consumption.

 

 
Kondisyon sa Paggamit

1, power supply: tatlong-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%).

2, kalidad ng tubig:

(1) water temperature is not higher than 20 °C;

(2) solid impurities content (mass ratio) ay hindi hihigit sa 0.01%;

(3) PH value (pH) 6.5-8.5;

(4) ang nilalaman ng hydrogen sulfide ay hindi hihigit sa 1.5mg/L;

(5) ang nilalaman ng chloride ion ay hindi hihigit sa 400mg/L.

3, ang motor ay sarado o puno ng tubig na basa na istraktura, bago gamitin ang submersible motor cavity ay dapat na puno ng malinis na tubig, upang maiwasan ang maling puno, at pagkatapos ay higpitan ang iniksyon ng tubig, air release bolts, kung hindi man ay hindi pinapayagang gamitin

4, ang submersible pump ay dapat na lubusang lumubog sa tubig, ang diving depth ay hindi hihigit sa 70m, ang ilalim ng submersible pump mula sa ilalim ng balon ay hindi mas mababa sa 3m.

5, ang mahusay na daloy ng tubig ay dapat na matugunan ang submersible pump tubig output at tuluy-tuloy na operasyon, ang submersible pump tubig output ay dapat na kontrolado sa 0.7 - 1.2 beses ang rate ng daloy.

6, ang balon ay dapat na tuwid, ang submersible pump ay hindi maaaring gamitin o dumped, tanging vertical na paggamit.

7, ang submersible pump ay dapat na tumugma sa cable ayon sa mga kinakailangan, at ang panlabas na overload na proteksyon na aparato.

8, ang bomba ay mahigpit na ipinagbabawal nang walang tubig na walang-load na pagsubok na makina

 

 
Kahulugan ng Modelo

Read More About 110 volt deep well submersible pump

 
Bahagyang Sanggunian ng Modelo
Modelo Daloy (m3/h) Ulo
(m)

Bilis ng pag-ikot

(baguhin/punto)

Bomba ng tubig(%)  Outlet
diameter
(mm)
Applicable na rin
diameter(mm) 
 Na-rate
power(KW)
Na-rate
boltahe(V)
Na-rate
kasalukuyang(A)
Motorefficiency (%) power factorcosφ   Yunit
Radial Maximu size(mm)
Puna
250QJ50-40 50 40 2875 72 80  250sa itaas 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250sa itaas 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250sa itaas 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250sa itaas 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250sa itaas 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250sa itaas 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250sa itaas 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250sa itaas 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250sa itaas 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Mga Pag-iingat sa Kaligtasan

 This well submersible pump is a clean water pump. It is strictly prohibited to dig new wells and extract sediment and turbid water. The voltage grade of the well pump is 380/50HZ. Other submersible motors with different voltage grades need to be customized. Underground cables must be waterproof and equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have conventional comprehensive motor protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection. In abnormal cases, the protection device should be tripped in time. The pump must be reliably grounded when installed and used. It is prohibited to push and pull the switch when the hands and feet are wet. The power must be cut off before installation and maintenance of the pump. The place where the pump is used must be clearly marked with "anti-electric shock". Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water. The intake/drain bolts must be tightened. When testing the pump on the ground, water must be added to the pump chamber to lubricate the rubber bearings. The instantaneous start should not exceed one second to check whether the direction is correct. This is also applicable to direction indication. When using the vertical electric pump, pay attention to safety to prevent overturning and injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump in low lift has a large flow or high lift has a large pull, resulting in extreme wear of thrust bearings and other parts, so that the motor overload burned. After the pump into the well, the measurement of the insulation resistance between the motor and the ground shall not be less than 100MΩ. After the start, regular observation of voltage and current, and check whether the motor winding insulation meets the requirements of the provisions. If the pump storage location temperature is below freezing, the water in the motor cavity should be drained to prevent freezing in the motor cavity and damage the motor due to low temperature.

 

 
Panimula sa Istruktura

Maikling panimula ng istraktura: ang bahagi ng bomba ay pangunahing binubuo ng pump shaft, impeller, diversion shell, rubber bearing, check valve body (mga opsyonal na bahagi) at iba pang mga bahagi. Ang bahagi ng motor ay pangunahing binubuo ng base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable at iba pang bahagi.


Ang mga pangunahing tampok ng produkto ay kinabibilangan ng:

 1, Ang motor ay isang wet submersible three-phase asynchronous na motor na puno ng tubig, ang lukab ng motor ay puno ng malinis na tubig, ginagamit upang palamig ang motor at mag-lubricate ang tindig, ang pressure regulating film sa ilalim ng motor ay ginagamit upang ayusin ang pagkakaiba ng pagpapalawak at pag-urong ng presyon ng tubig sa loob ng katawan sanhi ng pagbabago ng pagtaas ng temperatura ng motor.

 2, Upang maiwasan ang pagpasok ng buhangin sa tubig ng balon sa motor, ang itaas na dulo ng baras ng motor ay nilagyan ng dalawang mga seal ng langis, at isang singsing ng buhangin ay naka-install upang bumuo ng isang istraktura ng pag-iwas sa buhangin.

 3, Upang maiwasan ang pagtakbo ng pump shaft kapag nagsisimula, ang pump shaft at ang motor shaft ay konektado sa pamamagitan ng isang coupling, at isang upper thrust bearing ay naka-install sa ibabang bahagi ng motor.

 4, Ang pagpapadulas ng motor at ang pump bearing ay water lubrication.

 5, Ang motor stator winding ay gawa sa mataas na kalidad na submersible motor winding wire, na may mataas na pagganap ng pagkakabukod.

 6, Ang bomba ay dinisenyo ng computer CAD, na may simpleng istraktura at mahusay na teknikal na pagganap.

Read More About 110 volt deep well submersible pump
 
I-install

(1) Paghahanda bago i-install:
1. Suriin kung ang submersible pump ay nakakatugon sa mga kondisyon ng paggamit at saklaw na tinukoy sa manual.
2. Gamit ang isang mabigat na obiect na may diameter na katumbas ng maximum na panlabas na diameter ng submersible pump, sukatin kung ang inneldiameter ng wellbore ay maaaring magkasya sa submersible pump, at sukatin kung ang lalim ng balon ay nakakatugon sa mga kinakailangan sa pag-install.
3. Suriin kung malinis ang wellbore at kung ang tubig ng balon ay maputik. Huwag gumamit ng submersible electric pump upang hugasan ang welor pump na putik at tubig ng buhangin upang maiwasan ang maagang pagkasira ng submersible electric pump.
4. Suriin kung ang posisyon ng welhead installation clamp ay angkop at kung ito ay makatiis sa kalidad ng buong unit
5. Suriin kung ang mga bahagi ng submersible pump ay kumpleto at maayos na naka-install ayon sa assembly diagram sa manualAlisin ang filter screen at paikutin ang coupling upang makita kung ito ay umiikot nang flexible
6. Alisin ang turnilyo ng tubig at punan ang lukab ng motor ng malinis, hindi kinakaing unti-unti na tubig (tandaan. siguraduhing salaan ito), pagkatapos ay higpitan ang waterscrew. Pagkatapos ng 12 oras na pag-iniksyon ng tubig, ang insulation resistance ng motor ay hindi dapat mas mababa sa 150M Q kapag sinusukat sa isang 500V shaking table.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Ang naka-attach na cable wiring process diagram ay ang mga sumusunod:
Read More About 4 inch deep well submersible pump

 

8. Gumamit ng multimeter upang suriin kung ang mga three-phase na wire ay konektado at kung ang DC resistance ay tinatayang balanse.
9. Suriin kung ang kapasidad ng circuit at transpormer ay na-overload, at pagkatapos ay ikonekta ang overload na proteksyon switch o panimulang kagamitan. Tingnan ang Talahanayan 2 para sa mga partikular na modelo, at pagkatapos ay ibuhos ang isang balde ng tubig sa water pump mula sa outlet ng water pump upang lubricate ang rubber bearings sa pump, at pagkatapos ay ilagay ang submersible electric pump nang patayo at matatag. Magsimula (hindi hihigit sa isang segundo) at suriin kung ang direksyon ng pagpipiloto ay pare-pareho sa sign ng pagpipiloto. Kung hindi, palitan ang alinmang dalawang connector ng three-phase cable. Pagkatapos ay i-install ang filter at maghanda na bumaba sa balon. Kung ginagamit sa mga espesyal na okasyon (tulad ng mga kanal, kanal, ilog, pond, pond, atbp.), ang electric pump ay dapat na mapagkakatiwalaang naka-ground.

 

(2) Kagamitan at kasangkapan sa pag-install:
1. Isang pares ng lifting chain para sa higit sa dalawang tonelada.
2. Isang tripod na may patayong taas na hindi bababa sa apat na metro.
3. Dalawang nakabitin na lubid (wire ropes) na kayang magdala ng bigat na higit sa isang tonelada (maaaring pasanin ang bigat ng isang kumpletong hanay ng mga water pump).
4. Mag-install ng dalawang pares ng clamps (splints).
5. Wrenches, martilyo, distornilyador, mga kasangkapang elektrikal at instrumento, atbp.

 

(3)Pag-install ng electric pump:
1. Ang diagram ng pag-install ng submersible electric pump ay ipinapakita sa Figure 2. Ang mga partikular na sukat ng pag-install ay ipinapakita sa Talahanayan 3 "Listahan ng Mga Dimensyon ng Pag-install ng Submersible Electric Pump".

 

2. Ang mga submersible electric pump na may ulo na wala pang 30 metro ay maaaring iangat nang direkta sa balon gamit ang mga hose at wire rope o iba pang mga lubid ng abaka na kayang pasanin ang buong bigat ng buong makina, mga tubo ng tubig, at tubig sa mga tubo.

 

3. Ang mga pump na may ulo na higit sa 30 metro ay gumagamit ng mga bakal na tubo, at ang pagkakasunud-sunod ng pag-install ay ang mga sumusunod:
①Gumamit ng clamp upang i-clamp ang itaas na dulo ng bahagi ng water pump (ang motor at water pump ay konektado sa oras na ito), iangat ito gamit ang isang nakabitin na kadena, at dahan-dahang itali ito sa balon hanggang sa Ilagay ang clamp sa wellhead at alisin ang nakasabit na kadena.
② Gumamit ng isa pang pares ng clamp para i-clamp ang isang tubo, iangat ito gamit ang nakabitin na kadena 15 cm ang layo mula sa flange, at ibaba ito ng dahan-dahan. Sa pagitan ng pipe flange at pump flangeIlagay ang rubber pad sa lugar at higpitan ang pipe at pump nang pantay-pantay gamit ang bolts, nuts at spring washers.
③ Bahagyang iangat ang submersible pump, tanggalin ang clamp sa itaas na dulo ng water pump, itali ang cable sa pipe ng tubig gamit ang plastic tape, at dahan-dahang itali ito hanggang sa mailagay ang clamp sa wellhead.
④Gamitin ang parehong paraan upang itali ang lahat ng tubo ng tubig sa balon.
⑤Pagkatapos maikonekta ang lead-out cable sa control switch, ito ay konektado sa three-phase power supply.


(4) Mga bagay na dapat tandaan sa panahon ng pag-install:
1. Kung may nakitang jamming phenomenon sa panahon ng proseso ng pumping, paikutin o hilahin ang tubo ng tubig upang malampasan ang jamming point. Kung ang iba't ibang mga hakbang ay hindi pa rin gumagana, mangyaring Huwag pilitin ang pump upang maiwasan ang pinsala sa submersible electric pump at sa balon.
2. Sa panahon ng pag-install, ang isang rubber pad ay dapat ilagay sa flange ng bawat pipe at higpitan nang pantay-pantay.
3. Kapag ang bomba ng tubig ay ibinaba sa balon, dapat itong ilagay sa gitna ng tubo ng balon upang maiwasan ang pagtakbo ng bomba sa dingding ng balon nang mahabang panahon, na nagiging sanhi ng pag-vibrate ng bomba at pagwalis at pagkasunog ng motor. .
4. Tukuyin ang lalim ng water pump sa ilalim ng balon ayon sa dumadaloy na buhangin at silt na kondisyon ng balon. Huwag ibaon ang bomba sa putik. Ang distansya mula sa water pump hanggang sa ilalim ng balon ay karaniwang hindi bababa sa 3 metro (tingnan ang Larawan 2).
5. Ang lalim ng pagpasok ng tubig ng water pump ay dapat na hindi bababa sa 1-1.5 metro mula sa dynamic na lebel ng tubig hanggang sa water inlet node (tingnan ang Larawan 2). Kung hindi, ang water pump bearings ay maaaring madaling masira.
6. Ang pagtaas ng water pump ay hindi maaaring masyadong mababa. Kung hindi, kailangang mag-install ng gate valve sa wellhead water pipeline para makontrol ang pump flow sa rated flow point para maiwasang ma-overload at masunog ang motor dahil sa malalaking flow rate.
7. Kapag ang water pump ay tumatakbo, ang tubig na output ay dapat na tuluy-tuloy at kahit na, ang kasalukuyang ay dapat na stable (sa ilalim ng rated working conditions, sa pangkalahatan ay hindi hihigit sa 10% ng rated current), at dapat walang vibration o ingay. Kung mayroong anumang abnormalidad, dapat na ihinto ang makina upang malaman ang sanhi at maalis ito.
8. Kapag nag-i-install, bigyang-pansin ang setting ng grounding wire ng motor (tingnan ang Figure 2). Kapag ang tubo ng tubig ay isang bakal na tubo, akayin ito mula sa wellhead clamp; kapag ang tubo ng tubig ay isang plastik na tubo, akayin ito mula sa marka ng saligan ng electric pump.

 

 
Pagpapanatili at Pagpapanatili
  • (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
  • (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  • (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  • (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Ang pabagu-bagong lebel ng tubig ay bumababa sa bahaging pumapasok ng tubig, na nagiging sanhi ng pasulput-sulpot na tubig.
  • 3 Ang submersible pump ay may matinding vibration o ingay.
  • 4 Ang supply boltahe ay mas mababa sa 340 volts.
  • 5 Ang isang piyus ay nasunog.
  • 6 Nasira ang tubo ng suplay ng tubig.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • (5)Unit disassembly:
  • 1 Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2 i-screw down ang water bolt, ilagay ang tubig sa motor chamber.
  • 3 tanggalin ang filter, maluwag ang nakapirming tornilyo sa pagkabit upang ayusin ang baras ng motor.
  • 4 i-screw down ang bolt na kumukonekta sa water inlet section sa motor, at paghiwalayin ang pump mula sa motor (pansinin ang unit cushion kapag naghihiwalay, para maiwasan ang baluktot ng pump shaft)
  • 5 ang disassembly sequence ng pump ay: (tingnan ang figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, kapag inaalis ang impeller, gumamit ng mga espesyal na tool para paluwagin ang conical sleeve ng fixed impeller muna, at iwasan ang baluktot at pasa ang pump shaft sa proseso ng disassembly.
  • 6 ang proseso ng disassembly ng motor ay: (tingnan ang figure 1) ilagay ang motor sa platform, at alisin ang mga nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat at double head bolt mula sa ibaba ng ang motor naman, at pagkatapos ay kunin ang rotor (pansinin na huwag masira ang wire package) at sa wakas ay tanggalin ang connecting section at upper guide bearing seat.
  • 7 yunit ng pagpupulong: bago ang pagpupulong, ang kalawang at dumi ng mga bahagi ay dapat linisin, at ang ibabaw ng isinangkot at mga fastener ay pinahiran ng sealant, at pagkatapos ay tipunin sa kabaligtaran na pagkakasunud-sunod ng disassembly (ang motor shaft ay gumagalaw pataas at pababa pagkatapos ng pagpupulong para sa halos isa millimeter), pagkatapos ng pagpupulong, ang pagkabit ay dapat na nababaluktot, at pagkatapos ay ang filter screen test machine. Ang mga submersible pump ay dapat ilabas mula sa balon para sa pagtatanggal-tanggal at pagpapanatili ayon sa Artikulo 5 pagkatapos ng isang taon ng operasyon, o mas mababa sa isang taon ng operasyon ngunit dalawang taon ng diving time, at ang mga pagod na bahagi ay dapat palitan.

 

 
Imbakan at Kustodiya

This product is a submersible pump. In order to ensure that your equipment can work effectively for a long time, we provide the following suggestions: In winter, pay special attention to draining the water in the motor cavity to prevent freezing; roll up the cable and tie it well.When storage, select a room with a temperature below 40 °C and no corrosive substances or gases. When not in use for a long time, be sure to prevent the submersible pump from rusting.These simple methods will improve the service life and performance of the product, ensuring that you can fully enjoy the convenience and benefits it brings.

 

 
Nagsusuot ng mga Bahagi
  • Impeller
  • manggas ng baras
  • manggas ng goma shaft
  • Singsing sa pagbubuklod

 
Mga Sitwasyon ng Application

01 Deep well water intake

02 Mataas na suplay ng tubig

03 suplay ng tubig sa bundok

04 tubig sa tore

05 Pang-agrikultura na patubig

06 patubig sa hardin

07 pag-inom ng tubig sa ilog

08 tubig sa bahay

 

Kung interesado ka sa aming mga produkto, maaari mong piliing iwanan ang iyong impormasyon dito, at makikipag-ugnayan kami sa iyo sa ilang sandali.


Isulat ang iyong mensahe dito at ipadala ito sa amin

Kung interesado ka sa aming mga produkto, maaari mong piliing iwanan ang iyong impormasyon dito, at makikipag-ugnayan kami sa iyo sa ilang sandali.


tlTagalog