This hot water pump adopts the motor made of 50W400 grade high quality cold rolled silicon steel, which is stamped by high speed punch press. It has the advantages of low stator iron loss and low self-heating. The motor winding is designed for hot water pump, high temperature resistance and anti-aging. The winding has water resistance, and adopts 3CR13 stainless steel blade shaft, high temperature resistant bushing and other high quality accessories to enable it to operate for a long time at high temperature, and can be used with frequency converter, so as to automatically adjust according to the amount of water used. This hot water pump is the ideal choice for your hot water equipment, which can operate stably and efficiently, providing you with a lasting hot water supply.
The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply submersible pump. With water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not more than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not more than 1.5mg/L; chloride ion content is not more than 400mg/L. The electric pump adopts closed or water sealed wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, and then tighten the water and air bolts, otherwise not to use. Its work should be completely immersed in water, immersion depth is not more than 70 meters, the distance between the bottom of the pump and the bottom of the well is not less than 3 meters. Well water inflow quantity should be able to meet the electric pump water output and continuous operation, the output water quantity should be controlled at 0.7-1.2 times of the rated flow. The well should be vertical, the electric pump can not be used horizontally or inclined, only vertically placed. The electric pump must be equipped with cables and external overload protection device as required. It is strictly prohibited to conduct no-load test under no water condition.
Awoṣe | Sisan (m3/h) | Ori (m) |
Iyara yiyipo (ayipada/ojuami) |
Omi (%) | Ijabọ opin (mm) |
Wulo daradara opin (mm) |
Ti won won power(KW) |
Ti won won foliteji(V) |
Ti won won lọwọlọwọ (A) |
Iṣiṣẹ mọto (%) | agbara ifosiwewecosφ | Ẹyọ Iwọn Radial ti o pọju (mm) |
Akiyesi | |||||||||
300QJ200-40 | 200 | 40 | 2900 | 76 | 150 | 300loke | 37 | 380 | 77.8 | 85.0 | 0.85 | 281 | ||||||||||
300QJ200-60 | 60 | 55 | 115 | 85.5 | 0.85 | |||||||||||||||||
300QJ200-80 | 80 | 75 | 154.1 | 86.0 | 0.86 | |||||||||||||||||
300QJ200-100 | 100 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-120 | 120 | 100 | 204.3 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-140 | 140 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ200-160 | 160 | 140 | 277.8 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-180 | 180 | 160 | 317.5 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-200 | 200 | 185 | 367.2 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-240 | 240 | 220 | 436.6 | 88.0 | 0.87 | |||||||||||||||||
300QJ320-30 | 320 | 30 | 2900 | 77 | 200 | 300loke | 45 | 380 | 94.6 | 85.0 | 0.85 | 281 | ||||||||||
300QJ320-60 | 60 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ320-90 | 90 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ320-120 | 120 | 160 | 317.5 | 88.0 | 0.87 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, ni ibamu si awọn ipese ti fifa fifa soke, iwọn lilo ti sisan, lati ṣe idiwọ sisan kekere tabi agbara fifa soke, gbigbe gbigbe ati awọn ẹya miiran ti yiya, apọju motor sun.
6, lẹhin fifa soke si isalẹ kanga, wiwọn ti awọn motor si ilẹ idabobo resistance ko yẹ ki o wa ni kere ju 100M, lẹhin ti awọn ibere lati mo daju awọn foliteji ati lọwọlọwọ, ṣayẹwo awọn motor yikaka idabobo, boya ni ila pẹlu awọn ibeere; fifa soke ipamọ ipo otutu ti o ba ti kere ju didi ojuami, yẹ ki o wa gbẹ omi ninu awọn motor iho, se awọn motor iho omi yinyin bibajẹ ṣẹlẹ nipasẹ kekere otutu.
The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other components. The main characteristic of this product is that the motor is a water-cooled submersible three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom is used to adjust the expansion-contraction pressure difference in the body caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed at the bottom of the motor. The lubrication of the motor and the pump bearing is realized through water lubrication. The stator winding of the motor is made of high-quality well motor winding wire, with high insulation performance. The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Igbaradi ṣaaju fifi sori:
1. Ṣayẹwo boya fifa omi inu omi ba pade awọn ipo lilo ati iwọn ti a pato ninu itọnisọna.
2. Lilo obiect ti o wuwo pẹlu iwọn ila opin ti o dọgba si iwọn ila opin ti ita ti o pọju ti fifa fifa, wiwọn boya inneldiameter ti wellbore le ni ibamu si fifa omi ti o wa ni isalẹ, ki o si wiwọn boya ijinle kanga ni ibamu pẹlu awọn ibeere fifi sori ẹrọ.
3. Ṣayẹwo boya ibi kanga jẹ mimọ ati boya omi kanga jẹ turbid. Maṣe lo fifa ina submersible lati fọ ẹrẹ fifa welor ati omi iyanrin lati yago fun ibajẹ ti tọjọ si fifa ina submersible.
4. Ṣayẹwo boya awọn ipo ti awọn welhead fifi sori dimole jẹ dara ati boya o le withstand awọn qualty ti gbogbo kuro
5. Ṣayẹwo boya awọn paati fifa submersible ti pari ati fi sori ẹrọ daradara ni ibamu si apẹrẹ apejọ ti o wa ninu iwe afọwọkọ Yọ iboju àlẹmọ naa ki o si yi asopọ pọ lati rii boya o n yi ni irọrun
6. Unscrew omi dabaru ati ki o fillthe motor iho pẹlu mọ, ti kii ipata omi (akọsilẹ. jẹ daju lati Fil o soke), ki o si Mu awọn waterscrew. Lẹhin awọn wakati 12 ti abẹrẹ omi, idabobo idabobo ti motor ko yẹ ki o kere ju 150M Q nigbati wọn wọn pẹlu tabili gbigbọn 500V.
7. Isopo okun, ge apo rọba 120mm kan lati opin kan ti okun ti njade ati okun ti o baamu pẹlu ọbẹ eletiriki lẹhinna ta gigun ti awọn okun onirin mẹta ni apẹrẹ ti o ni ipele, yọ mojuto 20mm Ejò kuro, yọ oxide. Layer lori theside ti awọn Ejò waya pẹlu kan ọbẹ tabi iyanrin asọ, ki o si fi awọn meji ti sopọ waya pari ni palirs.After tying awọn Layer ni wiwọ pẹlu itanran Ejò waya, solder o daradara ati ki o ìdúróṣinṣin, ati iyanrin ti eyikeyi. burrs lori dada. Lẹhinna, fun awọn isẹpo mẹta, lo teepu idabobo polyvester lati fi ipari si wọn ni ọna tolera ologbele fun awọn lafa mẹta. Pa awọn opin meji ti Layer wiwu ni wiwọ pẹlu okun nyion, ati lẹhinna lo ọna tolera ologbele lati fi ipari si teepu fun awọn fẹlẹfẹlẹ mẹta. Fi ipari si outellayer pẹlu teepu idabobo giga-titẹ fun awọn ipele mẹta. Nikẹhin, ṣe agbo awọn okun mẹta papo ki o si fi ipari si wọn leralera fun awọn marunlayers pẹlu teepu titẹ-giga. Layer kọọkan gbọdọ wa ni wiwọ ni wiwọ, ati awọn isẹpo interlayer gbọdọ jẹ ṣinṣin ati fimm lati yago fun omi lati wọ inu ati ba idabobo naa jẹ, Lẹhin ti murasilẹ, fi omi sinu omi ni iwọn otutu ti 20 'c fun wakati 12, ki o si wiwọn resistance idabobo pẹlu tabili gbigbọn. , eyiti ko yẹ ki o kere ju 100M Ω
Aworan ilana onirin okun ti a so mọ jẹ bi atẹle:
8. Lo multimeter kan lati ṣayẹwo boya awọn onirin mẹta-alakoso ti wa ni ti sopọ ati boya awọn DC resistance jẹ to iwontunwonsi.
9. Ṣayẹwo boya awọn Circuit ati transformer agbara ti wa ni apọju, ati ki o si so apọju Idaabobo yipada tabi ti o bere ẹrọ. Wo Tabili 2 fun awọn awoṣe kan pato, ati lẹhinna Tú garawa omi kan sinu fifa omi lati inu iṣan omi lati lubricate awọn bearings roba ninu fifa soke, ati lẹhinna gbe fifa ina mọnamọna submersible ni titọ ati iduroṣinṣin.Bẹrẹ (ko si ju iṣẹju kan lọ) ati ki o ṣayẹwo boya itọsọna idari ni ibamu pẹlu ami idari. Ti kii ba ṣe bẹ, paarọ eyikeyi awọn asopọ meji ti okun oni-mẹta. Lẹhinna fi àlẹmọ sori ẹrọ ki o mura lati lọ si isalẹ kanga naa. Ti a ba lo ni awọn iṣẹlẹ pataki (gẹgẹbi awọn koto, awọn koto, awọn odo, awọn adagun omi, awọn adagun omi, ati bẹbẹ lọ), fifa ina mọnamọna gbọdọ wa ni ilẹ ni igbẹkẹle.
(2) Awọn ohun elo fifi sori ẹrọ ati awọn irinṣẹ:
1. Ọkan bata ti awọn ẹwọn gbigbe fun diẹ ẹ sii ju awọn toonu meji lọ.
2. A mẹta pẹlu kan inaro iga ti ko kere ju mẹrin mita.
3. Awọn okun adiye meji (awọn okun waya) ti o le jẹ iwuwo diẹ ẹ sii ju ọkan lọ (le jẹ iwuwo ti pipe pipe ti awọn fifa omi).
4. Fi sori ẹrọ meji orisii clamps (splints).
5. Wrenches, òòlù, screwdrivers, itanna irinṣẹ ati ohun elo, ati be be lo.
(3) Fifi sori ẹrọ fifa ẹrọ itanna:
1. Aworan fifi sori ẹrọ ti fifa ina mọnamọna submersible ti wa ni afihan ni Nọmba 2. Awọn iwọn fifi sori ẹrọ pato ni a fihan ni Table 3 "Akojọ ti Awọn Iwọn fifi sori ẹrọ ti Imudanu Imọlẹ Imọlẹ".
2. Awọn ifasoke ina mọnamọna ti o wa ni isalẹ pẹlu ori ti o kere ju 30 mita ni a le gbe soke taara sinu kanga nipa lilo awọn okun ati awọn okun waya tabi awọn okun hemp miiran ti o le ni kikun iwuwo ti gbogbo ẹrọ, awọn ọpa omi, ati omi ninu awọn paipu.
3. Awọn ifasoke pẹlu ori ti o ju 30 mita lo awọn paipu irin, ati ilana fifi sori ẹrọ jẹ bi atẹle:
① Lo dimole kan lati di opin oke ti apakan fifa omi (moto ati fifa omi ti wa ni asopọ ni akoko yii), gbe e pẹlu ẹwọn ikele, ki o si sorara di e sinu kanga naa titi ti o fi fi dimole si ori kanga ki o si yọkuro ikele pq.
② Lo awọn clamps meji miiran lati di paipu kan, gbe e pẹlu ẹwọn ikele 15 cm kuro ni flange, ki o si lọ silẹ laiyara. Laarin pipe flange ati fifa flangeFi awọn roba pad ni ibi ati Mu paipu ati fifa boṣeyẹ pẹlu boluti, eso ati orisun omi washers.
③ Gbe fifa omi ti o wa ni isalẹ diẹ diẹ, yọ idimu ti o wa ni opin oke ti fifa omi, di okun naa ṣinṣin si paipu omi pẹlu teepu ike kan, ki o si so o lọra titi di igba ti a fi dimu si ibi kanga.
④ Lo ọna kanna lati di gbogbo awọn paipu omi sinu kanga.
⑤ Lẹhin ti okun-jade ti a ti sopọ si iyipada iṣakoso, o ti sopọ si ipese agbara mẹta-alakoso.
(4) Awọn nkan lati ṣe akiyesi lakoko fifi sori ẹrọ:
1. Ti o ba ti a jamming lasan ti wa ni ri nigba ti fifa ilana, tan tabi fa omi paipu lati bori awọn jamming ojuami. Ti ọpọlọpọ awọn igbese ko ba ṣiṣẹ, jọwọ maṣe fi agbara mu fifa soke lati yago fun ibajẹ si fifa ina submersible ati kanga.
2. Lakoko fifi sori ẹrọ, paadi rọba yẹ ki o gbe ni flange ti paipu kọọkan ati ki o ni wiwọ paapaa.
3. Nigbati fifa omi ba ti wa ni isalẹ sinu kanga, o yẹ ki o gbe si arin paipu kanga naa lati ṣe idiwọ fifa soke lati ṣiṣẹ lodi si odi kanga fun igba pipẹ, ti o mu ki fifa soke lati gbọn ati pe ọkọ ayọkẹlẹ lati gba ati sisun. .
4. Ṣe ipinnu ijinle ti fifa omi si isalẹ ti kanga gẹgẹbi iyanrin ti nṣan ati awọn ipo silt ti kanga. Ma ṣe sin fifa soke sinu ẹrẹ. Ijinna lati fifa omi si isalẹ ti kanga ni gbogbogbo ko kere ju awọn mita 3 (wo Nọmba 2).
5. Ijinle titẹsi omi ti fifa omi yẹ ki o jẹ ko kere ju awọn mita 1-1.5 lati ipele omi ti o ni agbara si oju omi ti nwọle (wo Nọmba 2). Bibẹẹkọ, awọn bearings fifa omi le ni irọrun bajẹ.
6. Gbigbe ti fifa omi ko le jẹ kekere ju. Bibẹẹkọ, àtọwọdá ẹnu-ọna nilo lati fi sori ẹrọ lori opo gigun ti omi kanga lati ṣakoso ṣiṣan fifa ni aaye ṣiṣan ti o ni iwọn lati ṣe idiwọ mọto lati ni apọju ati sisun nitori awọn iwọn sisan nla.
7. Nigbati fifa omi ba n ṣiṣẹ, ṣiṣan omi yẹ ki o wa ni ilọsiwaju ati paapaa, lọwọlọwọ yẹ ki o wa ni iduroṣinṣin (labẹ awọn ipo iṣẹ ti a ṣe ayẹwo, ni gbogbo igba ko ju 10% ti iṣiro lọwọlọwọ), ati pe ko yẹ ki o jẹ gbigbọn tabi ariwo. Ti aiṣedeede eyikeyi ba wa, ẹrọ naa yẹ ki o da duro lati wa idi ti o fa ati imukuro rẹ.
8. Nigbati fifi sori, san ifojusi si awọn eto ti awọn motor grounding waya (wo Figure 2). Nigbati paipu omi jẹ paipu irin, darí rẹ lati dimole kanga; nigbati paipu omi jẹ paipu ike kan, darí rẹ lati aami ilẹ ti fifa ina.
After installation of the underwater pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether the connection between the instrument and the starting equipment is wrong. If there is no problem, you can start the test machine. After starting, observe whether the indication reading of each instrument is correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has any noise or vibration. If everything is normal, it can be put into operation. Four hours after the first operation of the pump, it should be turned off and the thermal insulation resistance of the motor should be quickly tested, and its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing, resulting in the motor burning due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to eliminate the fault:
1 the current exceeds 20% under the rated working condition.
2 the dynamic water level drops to the inlet section, resulting in intermittent drainage.
3 the underwater pump vibrates violently or emits huge noise.
4 the supply voltage is lower than 340 volts.
5 a fuse is burned.
6 the water pipe is damaged.
7 the thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
When disassembling the device, it is necessary to untie the cable bundle and remove the pipeline part and the line protection plate. Remove the drain bolt and exclude all water in the motor chamber. Remove the filter element and loosen the screw on the coupling fixed to the motor shaft. Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (pay attention to placing the device horizontally when separating to prevent the bending of the pump shaft). The sequence of disassembling the pump is as follows: (see Figure 1) water inlet section, impeller, water inlet shell, impeller. Check the valve body, and use a special tool to loosen the cone sleeve fixed to the impeller when removing the impeller. In the process of disassembly, avoid bending the pump shaft and damaging various components. The disassembly process of the motor is as follows: (see Figure 1) put the motor on the platform, and remove the nuts on the screw (pull rod bolt), base, shaft head lock nut, thrust plate, key and lower guide rail - bearing seat, bolt, and then remove the rotor (be careful not to damage the wiring harness), and finally remove the connecting parts and upper guide bearing seat. Unit assembly: before assembly, the rust and dirt of each component should be cleaned, and the sealant should be coated on each mating surface and fastener, and then assembled in the opposite order of disassembly (the movement of the motor shaft after assembly is about one millimeter), after the assembly is completed, the coupling should be flexibly rotated, and then the filter element should be placed for testing. Each time the underwater electric pump has been used for one year, or less than one year but has been immersed for two years, it must be disassembled and inspected in accordance with Article 5 and replace the worn parts.
1, gbe omi jade ninu iho moto (paapaa ni igba otutu lati ṣe idiwọ mọto lati didi), ki o di okun naa daradara.
2, tọju sinu yara inu ile laisi awọn nkan ti o bajẹ ati awọn gaasi, pẹlu iwọn otutu ti o wa labẹ 40 °C.
3, gun-igba lilo yẹ ki o san ifojusi si ipata idena ti submersible bẹtiroli.
- Impeller
- Ọwọ ọpa
- Roba ọpa apo
-
Iwọn edidi
01 Gbigbe omi kanga ti o jinlẹ
02 Giga-jinde omi ipese
03 oke omi ipese
04 omi ẹṣọ
05 Ogbin irigeson
06 irigeson ọgba
07 odo omi gbigbemi
08 omi inu ile