The variable frequency winding design ensures the motor's long-term smooth conversion operation between 1HZ-50HZ, energy saving and longer service life. This product stands out for its advanced technology and efficient performance, which can achieve energy-saving and environmentally friendly operation, while ensuring the stability and reliability of the motor for long-term use. Not only that, its design makes the product with a longer life, bringing more value to users. Whether in home applications or industrial fields, this motor can provide you with excellent performance to meet a variety of needs.
1,Power supply: three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%).
2, качество на водата:
(1) water temperature is not higher than 20 °C;
(2) съдържанието на твърди примеси (масово съотношение) не е по-голямо от 0,01%;
(3) PH стойност (pH) 6,5-8,5;
(4) съдържанието на сероводород не е по-голямо от 1,5 mg/L;
(5) съдържанието на хлоридни йони не е по-голямо от 400 mg/L.
3, the motor is a closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use
4, the submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m.
5, потокът на водата от кладенеца трябва да може да отговаря на изхода на водата от потопяемата помпа и непрекъсната работа, изходът на водата от потопяемата помпа трябва да се контролира при 0,7 - 1,2 пъти от номиналния дебит.
6, кладенецът трябва да е прав, потопяемата помпа не може да се използва или изхвърля, само вертикална употреба.
7, потопяемата помпа трябва да бъде съчетана с кабела според изискванията и външното устройство за защита от претоварване.
8, the pump is strictly prohibited without water no-load test machine.
Модел | Дебит (m3/h) | Глава (м) |
Скорост на въртене (промяна/точка) |
Водна помпа(%) | Изход диаметър (mm) |
Приложимо добре диаметър (mm) |
Оценен мощност (KW) |
Оценен напрежение (V) |
Оценен ток (A) |
Моторна ефективност (%) | power factorcosφ | Мерна единица Максимален радиален размер (mm) |
Забележка | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135по-горе | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135по-горе | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135по-горе | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135по-горе | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135по-горе | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135по-горе | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135по-горе | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, стриктно в съответствие с разпоредбите на повдигане на помпата, обхват на използване на потока, за предотвратяване на нисък поток или висока сила на повдигане на изпомпване, аксиалният лагер и други части на износването, претоварването на двигателя изгорено 6, след помпата надолу в кладенеца, измерването на съпротивлението на изолацията на двигателя към земята не трябва да бъде по-малко от 100M, след началото да се наблюдава напрежението и тока, да се провери изолацията на намотката на двигателя, дали е в съответствие с изискванията; температурата на мястото за съхранение на помпата, ако е по-ниска от точката на замръзване, трябва да изсуши водата в кухината на двигателя, да предотврати повреда от воден лед в кухината на двигателя, причинена от ниска температура.
The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor parts are mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, and lead cable.
Основните характеристики на продукта включват:
The main characteristic of the product is that the pump is a water-immersed three-phase asynchronous motor, and the motor cavity is full of water for cooling the motor and lubricating the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference of the water inside the body caused by the change of temperature. At the same time, in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the end of the motor shaft, and the sand discharging ring is installed to form a sand control structure. In order to prevent the pump shaft from beating when starting up, the pump shaft and the motor shaft are connected by a coupling, and the thrust bearing is installed at the bottom of the motor. In addition, the motor and the pump bearing are water-lubricated, and the stator winding of the motor uses high-quality submersible motor winding to ensure high insulation performance. The overall design is made of computer CAD, with simple structure and superior technical performance.

(1) Подготовка преди монтаж:
1. Проверете дали потопяемата помпа отговаря на условията за употреба и обхвата, посочени в ръководството.
2. Като използвате тежък предмет с диаметър, равен на максималния външен диаметър на потопяемата помпа, измерете дали вътрешният диаметър на сондажа може да пасне на потопяемата помпа и измерете дали дълбочината на кладенеца отговаря на изискванията за монтаж.
3. Проверете дали кладенецът е чист и дали водата в кладенеца е мътна. Никога не използвайте потопяема електрическа помпа за измиване на калта и пясъчната вода на помпата, за да избегнете преждевременна повреда на потопяемата електрическа помпа.
4. Проверете дали позицията на монтажната скоба на главата е подходяща и дали може да издържи на качеството на целия модул
5. Проверете дали компонентите на потопяемата помпа са пълни и монтирани правилно съгласно схемата за сглобяване в ръководството Отстранете филтърната мрежа и завъртете съединителя, за да видите дали се върти гъвкаво
6. Развийте винта за вода и напълнете кухината на двигателя с чиста, некорозивна вода (забележка. не забравяйте да я напълните), след което затегнете винта за вода. След 12 часа впръскване на вода съпротивлението на изолацията на двигателя не трябва да бъде по-малко от 150M Q, когато се измерва с 500V маса за разклащане.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Приложената диаграма на процеса на кабелно окабеляване е както следва:
8. Използвайте мултиметър, за да проверите дали трифазните проводници са свързани и дали DC съпротивлението е приблизително балансирано.
9. Проверете дали веригата и капацитетът на трансформатора са претоварени и след това свържете превключвателя за защита от претоварване или стартовото оборудване. Вижте таблица 2 за конкретни модели и след това изсипете кофа с вода във водната помпа от изхода на водната помпа, за да смажете гумените лагери в помпата, след което поставете потопяемата електрическа помпа изправена и стабилна. Старт (не повече от една секунда) и проверете дали посоката на кормилното управление съответства на знака за управление. Ако не, разменете всеки два конектора на трифазния кабел. След това инсталирайте филтъра и се подгответе да слезете в кладенеца. Ако се използва в специални случаи (като канавки, канавки, реки, езера, езера и т.н.), електрическата помпа трябва да бъде надеждно заземена.
(2) Инсталационно оборудване и инструменти:
1. Един чифт вериги за повдигане над два тона.
2. Триножник с вертикална височина не по-малка от четири метра.
3. Две висящи въжета (телени въжета), които могат да издържат тегло над един тон (могат да понесат теглото на пълен комплект водни помпи).
4. Инсталирайте два чифта скоби (шини).
5. Гаечни ключове, чукове, отвертки, електрически инструменти и инструменти и др.
(3) Инсталация на електрическа помпа:
1. Монтажната схема на потопяемата електрическа помпа е показана на Фигура 2. Конкретните монтажни размери са показани в Таблица 3 „Списък на инсталационните размери на потопяемата електрическа помпа“.
2. Потопяеми електрически помпи с височина под 30 метра могат да бъдат повдигнати директно в кладенеца с помощта на маркучи и телени въжета или други конопени въжета, които могат да поемат пълното тегло на цялата машина, водопроводните тръби и водата в тръбите.
3. Помпите с напор над 30 метра използват стоманени тръби и последователността на монтаж е както следва:
①Използвайте скоба, за да затегнете горния край на частта на водната помпа (моторът и водната помпа са свързани в този момент), повдигнете я с висяща верига и бавно я завържете в кладенеца, докато Поставете скобата върху главата на кладенеца и отстранете висяща верига.
② Използвайте друг чифт скоби, за да захванете тръба, повдигнете я с висяща верига на 15 см от фланеца и я спуснете бавно. Между фланеца на тръбата и фланеца на помпата Поставете гумената подложка на място и затегнете тръбата и помпата равномерно с болтове, гайки и пружинни шайби.
③ Повдигнете леко потопяемата помпа, отстранете скобата в горния край на водната помпа, завържете кабела здраво към водопроводната тръба с пластмасова лента и бавно го завържете надолу, докато скобата се постави на устието на кладенеца.
④Използвайте същия метод, за да свържете всички водопроводни тръби в кладенеца.
⑤След като извеждащият кабел е свързан към контролния превключвател, той се свързва към трифазното захранване.
(4) Неща, които трябва да имате предвид по време на инсталацията:
1. Ако по време на процеса на изпомпване се установи заклинване, завъртете или издърпайте водопроводната тръба, за да преодолеете точката на засядане. Ако различни мерки все още не работят, моля, не натискайте помпата надолу, за да избегнете повреда на потопяемата електрическа помпа и кладенеца.
2. По време на монтажа трябва да се постави гумена подложка на фланеца на всяка тръба и да се затегне равномерно.
3. Когато водната помпа се спусне в кладенеца, тя трябва да се постави в средата на тръбата на кладенеца, за да се предотврати работата на помпата срещу стената на кладенеца за дълго време, причинявайки помпата да вибрира и двигателят да помита и изгаря .
4. Определете дълбочината на водната помпа до дъното на кладенеца според условията на течащ пясък и тиня в кладенеца. Не заравяйте помпата в калта. Разстоянието от водната помпа до дъното на кладенеца обикновено е не по-малко от 3 метра (вижте Фигура 2).
5. Дълбочината на входа на водата на водната помпа трябва да бъде не по-малко от 1-1,5 метра от динамичното ниво на водата до възела на входа на водата (виж Фигура 2). В противен случай лагерите на водната помпа могат лесно да се повредят.
6. Повдигането на водната помпа не може да бъде твърде ниско. В противен случай трябва да се монтира шибър на тръбопровода за вода на кладенеца, за да се контролира дебитът на помпата при номиналната точка на дебит, за да се предотврати претоварване и изгаряне на двигателя поради големи дебити.
7. Когато водната помпа работи, изходът на водата трябва да бъде непрекъснат и равномерен, токът трябва да е стабилен (при номинални работни условия, обикновено не повече от 10% от номиналния ток) и не трябва да има вибрации или шум. Ако има някаква аномалия, машината трябва да се спре, за да се установи причината и да се отстрани.
8. Когато инсталирате, обърнете внимание на настройката на заземяващия проводник на двигателя (вижте Фигура 2). Когато водопроводната тръба е стоманена тръба, изведете я от скобата на устието на кладенеца; когато водопроводната тръба е пластмасова, изведете я от маркировката за заземяване на електрическата помпа.
- 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and after the start, observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate, observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- 2. After the first operation of the pump for four hours, the motor should be stopped to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- 3. After the pump is stopped, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
- 4. Our pump is designed to provide efficient, reliable and lasting pumping solutions.After normal operation, in order to prolong the service life of the pump, it is necessary to check the power supply voltage, running current and insulation resistance regularly to ensure that they are normal.
- If the following conditions are found, the machine should be shut down immediately to eliminate the fault:
- - the current exceeds 20% under the rated working conditions;
- - the dynamic water level drops to the inlet section, resulting in intermittent drainage;
- - the submersible pump vibrates violently or emits noisy sounds;
- - the power supply voltage is lower than 340 volts;
- - one phase of a fuse is blown out;
- - the water pipe is damaged;
- - the thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
- The steps of disassembling the unit include unlocking the cable holder, taking off the pipe part, removing the line protection plate, rotating the drain screw and emptying all the water in the motor chamber, taking out the filter and loosening the screw of the coupling fixed to the motor shaft.Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (note that the unit should be placed horizontally when separating to prevent the bending of the pump shaft).
- 5. The disassembly sequence of the pump includes: water inlet part, impeller, shunt shell, impeller, check valve body.When removing the impeller, use a special tool to loosen the cone sleeve fixing the impeller.During the disassembly process, avoid bending the pump shaft and damaging various parts.The disassembly process of the motor includes: placing the motor on the platform, and then removing the nuts on the studs, base, shaft head lock nut, thrust plate, key, lower guide rail, bearing seat and bolt from the bottom of the motor, then removing the rotor (be careful not to damage the winding), and finally removing the connecting parts and upper guide bearing seat. Before assembling the unit, it is necessary to clean the rust and dirt of each part, and apply sealant on each mating surface and fastener, and then assemble it in the opposite order of disassembly.After assembly, the coupling should be flexibly rotated, and then the filter should be put on to test the machine. Our pump products are designed to provide superior performance and reliability to meet your pumping needs.
- 6. Submersible pumps operating every year, or less than a year of operation but the submersible time has reached two years, should be taken out of the well according to the 5th dismantled maintenance, replacement of worn parts.
1, извадете водата в кухината на двигателя (особено през зимата, за да предотвратите замръзване на двигателя) и завържете добре кабела.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, дългосрочната употреба трябва да обърне внимание на предотвратяването на ръжда на потопяемите помпи.
- Работно колело
- Втулка на вала
- Гумена втулка на вала
- Уплътнителен пръстен
01 Водовземане с дълбок кладенец
02 Високоетажно водоснабдяване
03 планински водопровод
04 кула вода
05 Селскостопанско напояване
06 градинско напояване
07 речно водохващане
08 битова вода