135QJB Deep Well Submersible Pump

Undertake OEM processing! According to user requirements, design and manufacture of various types of special requirements of non-standard submersible motor and pump. The product implementation standards: GB/T2816-2014 "well submersible pump", GB/T2818-2014 "well submersible asynchronous motor". WhatsApp:17855846335
PDF DOWNLOAD
Details
Tags
 
Product Overview

The variable frequency winding design ensures the motor's long-term smooth conversion operation between 1HZ-50HZ, energy saving and longer service life. This product stands out for its advanced technology and efficient performance, which can achieve energy-saving and environmentally friendly operation, while ensuring the stability and reliability of the motor for long-term use. Not only that, its design makes the product with a longer life, bringing more value to users. Whether in home applications or industrial fields, this motor can provide you with excellent performance to meet a variety of needs.

 

 
Conditions of Use

1,Power supply: three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%).

2, water quality:

(1) water temperature is not higher than 20 °C;

(2) solid impurities content (mass ratio) is not greater than 0.01%;

(3) PH value (pH) 6.5-8.5;

(4) hydrogen sulfide content is not greater than 1.5mg/L;

(5) chloride ion content is not greater than 400mg/L.

3, the motor is a closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use

4, the submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m.

5, the well water flow should be able to meet the submersible pump water output and continuous operation, the submersible pump water output should be controlled at 0.7 - 1.2 times the rated flow.

6, the well should be straight, the submersible pump can not be used or dumped, only vertical use.

7, the submersible pump must be matched with the cable according to the requirements, and the external overload protection device.

8, the pump is strictly prohibited without water no-load test machine.

 

 
Model Meaning

 
Partial Model Reference
Model Flow (m3/h)   Head
(m)

  Rotatingspeed

(change/point)

 Waterpump(%)   Outlet
diameter
(mm)
Applicable well
diameter(mm) 
Rated
power(KW)
Rated
voltage(V)
 Rated
current(A)
Motorefficiency (%)  power factorcosφ   Unit
Radial Maximu size(mm)
Remark
135QJ5-34 5 34 2850   40  135above 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135above 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135above 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135above 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135above 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135above 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135above 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Safety Precautions

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, strictly according to the provisions of the pump lift, flow range of use, to prevent low flow or high lift pumping force, the thrust bearing and other parts of the wear, the motor overload burned 6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introduction to Structure

The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor parts are mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, and lead cable.



The main features of the product include:

The main characteristic of the product is that the pump is a water-immersed three-phase asynchronous motor, and the motor cavity is full of water for cooling the motor and lubricating the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference of the water inside the body caused by the change of temperature. At the same time, in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the end of the motor shaft, and the sand discharging ring is installed to form a sand control structure. In order to prevent the pump shaft from beating when starting up, the pump shaft and the motor shaft are connected by a coupling, and the thrust bearing is installed at the bottom of the motor. In addition, the motor and the pump bearing are water-lubricated, and the stator winding of the motor uses high-quality submersible motor winding to ensure high insulation performance. The overall design is made of computer CAD, with simple structure and superior technical performance.

 

 
Install

(1)Preparation before installation:
1. Check whether the submersible pump meets the usage conditions and scope specifed in the manual.
2. Using a heavy obiect with a diameter equal to the maximum outer diameter of the submersible pump, measure whether the inneldiameter of the wellbore can fit the submersible pump, and measure whether the well depth meets the installation requirements.
3. Check whether the wellbore is clean and whether the well water is turbid. Never use a submersible electric pump to wash the welor pump mud and sand water to avoid premature damage to the submersible electric pump.
4. Check whether the position of the welhead installation clamp is suitable and whether it can withstand the qualty of the entire unit
5. Check if the submersible pump components are complete and installed properly according to the assembly diagram in the manualRemove the filter screen and rotate the coupling to see if it rotates flexibly
6. Unscrew the water screw and fillthe motor cavity with clean, non corrosive water (note. be sure to fil it up), then tighten the waterscrew. After 12 hours of water injection, the insulation resistance of the motor should not be less than 150M Q when measured witha 500V shaking table.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

The attached cable wiring process diagram is as follows:

 

8. Use a multimeter to check whether the three-phase wires are connected and whether the DC resistance is approximately balanced.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and thenPour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2)Installation equipment and tools:
1. One pair of lifting chains for more than two tons.
2. A tripod with a vertical height of no less than four meters.
3. Two hanging ropes (wire ropes) that can bear a weight of more than one ton (can bear the weight of a complete set of water pumps).
4. Install two pairs of clamps (splints).
5. Wrenches, hammers, screwdrivers, electrical tools and instruments, etc.

 

(3)Electric pump installation:
1. The installation diagram of the submersible electric pump is shown in Figure 2. The specific installation dimensions are shown in Table 3 "List of Installation Dimensions of the Submersible Electric Pump".

 

2. Submersible electric pumps with a head less than 30 meters can be hoisted directly into the well using hoses and wire ropes or other hemp ropes that can bear the full weight of the entire machine, water pipes, and water in the pipes.

 

3. Pumps with a head of more than 30 meters use steel pipes, and the installation sequence is as follows:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well untilPut the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flangePut the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Lift the submersible pump slightly, remove the clamp on the upper end of the water pump, tie the cable firmly to the water pipe with a plastic tape, and slowly tie it down until The clamp is placed at the wellhead.
④Use the same method to tie all water pipes into the well.
⑤After the lead-out cable is connected to the control switch, it is connected to the three-phase power supply.

 

(4)Things to note during installation:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, pleaseDo not force the pump down to avoid damage to the submersible electric pump and the well.
2. During installation, a rubber pad should be placed at the flange of each pipe and tightened evenly.
3. When the water pump is lowered into the well, it should be placed in the middle of the well pipe to prevent the pump from running against the well wall for a long time, causing the pump to vibrate and the motor to sweep and burn.
4. Determine the depth of the water pump to the bottom of the well according to the flowing sand and silt conditions of the well. Do not bury the pump in the mud. The distance from the water pump to the bottom of the well is generally not less than 3 meters (see Figure 2).
5. The water entry depth of the water pump should be no less than 1-1.5 meters from the dynamic water level to the water inlet node (see Figure 2). Otherwise, the water pump bearings may be easily damaged.
6. The lift of the water pump cannot be too low. Otherwise, a gate valve needs to be installed on the wellhead water pipeline to control the pump flow at the rated flow point to prevent the motor from being overloaded and burned out due to large flow rates.
7. When the water pump is running, the water output should be continuous and even, the current should be stable (under rated working conditions, generally no more than 10% of the rated current), and there should be no vibration or noise. If there is any abnormality, the machine should be stopped to find out the cause and eliminate it.
8. When installing, pay attention to the setting of the motor grounding wire (see Figure 2). When the water pipe is a steel pipe, lead it from the wellhead clamp; when the water pipe is a plastic pipe, lead it from the grounding mark of the electric pump.

 

 
Maintenance and Maintenance
  1. 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and after the start, observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate, observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
  2. 2. After the first operation of the pump for four hours, the motor should be stopped to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. 3. After the pump is stopped, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
  4. 4. Our pump is designed to provide efficient, reliable and lasting pumping solutions.After normal operation, in order to prolong the service life of the pump, it is necessary to check the power supply voltage, running current and insulation resistance regularly to ensure that they are normal.
  5.  
  6. If the following conditions are found, the machine should be shut down immediately to eliminate the fault:
  7. - the current exceeds 20% under the rated working conditions;
  8. - the dynamic water level drops to the inlet section, resulting in intermittent drainage;
  9. - the submersible pump vibrates violently or emits noisy sounds;
  10. - the power supply voltage is lower than 340 volts;
  11. - one phase of a fuse is blown out;
  12. - the water pipe is damaged;
  13. - the thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
  14. The steps of disassembling the unit include unlocking the cable holder, taking off the pipe part, removing the line protection plate, rotating the drain screw and emptying all the water in the motor chamber, taking out the filter and loosening the screw of the coupling fixed to the motor shaft.Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (note that the unit should be placed horizontally when separating to prevent the bending of the pump shaft).
  15.  
  16. 5. The disassembly sequence of the pump includes: water inlet part, impeller, shunt shell, impeller, check valve body.When removing the impeller, use a special tool to loosen the cone sleeve fixing the impeller.During the disassembly process, avoid bending the pump shaft and damaging various parts.The disassembly process of the motor includes: placing the motor on the platform, and then removing the nuts on the studs, base, shaft head lock nut, thrust plate, key, lower guide rail, bearing seat and bolt from the bottom of the motor, then removing the rotor (be careful not to damage the winding), and finally removing the connecting parts and upper guide bearing seat. Before assembling the unit, it is necessary to clean the rust and dirt of each part, and apply sealant on each mating surface and fastener, and then assemble it in the opposite order of disassembly.After assembly, the coupling should be flexibly rotated, and then the filter should be put on to test the machine. Our pump products are designed to provide superior performance and reliability to meet your pumping needs.
  17. 6. Submersible pumps operating every year, or less than a year of operation but the submersible time has reached two years, should be taken out of the well according to the 5th dismantled maintenance, replacement of worn parts.

 

 
Storage and Custody

 1, put out the water in the motor cavity (especially in winter to prevent the motor from freezing), and tie the cable well.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, long-term use should pay attention to the rust prevention of submersible pumps.

 

 
Wearing Parts
  • Impeller
  • Shaft sleeve
  • Rubber shaft sleeve
  • Sealing ring
 
Application Scenarios

01 Deep well water intake

02 High-rise water supply

03 mountain water supply

04 tower water

05 Agricultural irrigation

06 garden irrigation

07 river water intake

08 domestic water

  1.  

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


Write your message here and send it to us

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


en_USEnglish