Pam Rendam Telaga Dalam 250QJR

Lakukan pemprosesan OEM! Mengikut keperluan pengguna, reka bentuk dan pembuatan pelbagai jenis keperluan khas motor dan pam tenggelam bukan standard. Piawaian pelaksanaan produk: GB/T2816-2014 "pam tenggelam telaga", GB/T2818-2014 "motor tak segerak tenggelam telaga". WhatsApp:17855846335
PDF DOWNLOAD
Butiran
Tag
 
Gambaran Keseluruhan Produk

The hot water pump adopts 50W400 grade high quality cold rolled silicon steel, stamped by high speed punch, with the advantages of low stator iron loss and low self-heating. The motor winding is specially designed for high temperature and anti-aging hot water motor. The winding is waterproof, and the high quality accessories such as 3CR13 stainless steel impeller shaft and high temperature durable bushing make it able to operate at high temperature for a long time, and can be used with frequency converter, which can be automatically adjusted according to the water consumption.

 

 
Syarat Penggunaan

1, bekalan kuasa: tiga fasa AC 380V (toleransi + / - 5%), 50HZ (toleransi + / - 1%).

2, kualiti air:

(1) water temperature is not higher than 20 °C;

(2) kandungan kekotoran pepejal (nisbah jisim) tidak melebihi 0.01%;

(3) Nilai PH (pH) 6.5-8.5;

(4) kandungan hidrogen sulfida tidak melebihi 1.5mg/L;

(5) kandungan ion klorida tidak melebihi 400mg/L.

3, motor ditutup atau struktur basah yang dipenuhi air, sebelum menggunakan rongga motor tenggelam mesti penuh dengan air bersih, untuk mengelakkan penuh palsu, dan kemudian ketatkan suntikan air, bolt pelepas udara, jika tidak, tidak dibenarkan menggunakan

4, pam tenggelam mesti tenggelam sepenuhnya di dalam air, kedalaman menyelam tidak lebih daripada 70m, bahagian bawah pam tenggelam dari bahagian bawah telaga tidak kurang daripada 3m.

5, aliran air telaga harus dapat memenuhi keluaran air pam tenggelam dan operasi berterusan, keluaran air pam tenggelam harus dikawal pada 0.7 - 1.2 kali aliran undian.

6, telaga harus lurus, pam tenggelam tidak boleh digunakan atau dibuang, hanya penggunaan menegak.

7, pam tenggelam mesti dipadankan dengan kabel mengikut keperluan, dan peranti perlindungan beban luaran.

8, pam adalah dilarang sama sekali tanpa mesin ujian tanpa beban air

 

 
Maksud Model

Read More About 110 volt deep well submersible pump

 
Rujukan Model Separa
Model Aliran (m3/j) kepala
(m)

Kelajuan berputar

(ubah/titik)

Pam air(%)  Outlet
diameter
(mm)
Berkenaan dengan baik
diameter(mm) 
 Dinilai
power(KW)
Dinilai
voltan(V)
Dinilai
semasa (A)
Kecekapan motor (%) power factorcosφ   Unit
Saiz Maksimum Jejari (mm)
Teguran
250QJ50-40 50 40 2875 72 80  250atas 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250atas 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250atas 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250atas 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250atas 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250atas 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250atas 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250atas 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250atas 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Amaran keselamatan

 This well submersible pump is a clean water pump. It is strictly prohibited to dig new wells and extract sediment and turbid water. The voltage grade of the well pump is 380/50HZ. Other submersible motors with different voltage grades need to be customized. Underground cables must be waterproof and equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have conventional comprehensive motor protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection. In abnormal cases, the protection device should be tripped in time. The pump must be reliably grounded when installed and used. It is prohibited to push and pull the switch when the hands and feet are wet. The power must be cut off before installation and maintenance of the pump. The place where the pump is used must be clearly marked with "anti-electric shock". Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water. The intake/drain bolts must be tightened. When testing the pump on the ground, water must be added to the pump chamber to lubricate the rubber bearings. The instantaneous start should not exceed one second to check whether the direction is correct. This is also applicable to direction indication. When using the vertical electric pump, pay attention to safety to prevent overturning and injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump in low lift has a large flow or high lift has a large pull, resulting in extreme wear of thrust bearings and other parts, so that the motor overload burned. After the pump into the well, the measurement of the insulation resistance between the motor and the ground shall not be less than 100MΩ. After the start, regular observation of voltage and current, and check whether the motor winding insulation meets the requirements of the provisions. If the pump storage location temperature is below freezing, the water in the motor cavity should be drained to prevent freezing in the motor cavity and damage the motor due to low temperature.

 

 
Pengenalan kepada Struktur

Pengenalan ringkas struktur: bahagian pam terutamanya terdiri daripada aci pam, pendesak, cangkang lencongan, galas getah, badan injap sehala (bahagian pilihan) dan komponen lain. Bahagian motor terutamanya terdiri daripada asas, filem pengawal selia tekanan, galas tujahan, plat tujahan, tempat duduk galas panduan bawah, pemegun, pemutar, tempat duduk galas panduan atas, cincin pasir, bahagian salur masuk air, kabel dan komponen lain.


Ciri-ciri utama produk termasuk:

 1, Motor adalah motor asynchronous tiga fasa tenggelam basah yang dipenuhi air, rongga motor penuh dengan air bersih, digunakan untuk menyejukkan motor dan melincirkan galas, filem pengawalan tekanan di bahagian bawah motor digunakan untuk melaraskan perbezaan tekanan pengembangan dan pengecutan air di dalam badan yang disebabkan oleh perubahan kenaikan suhu motor.

 2, Untuk mengelakkan pasir di dalam air telaga daripada memasuki motor, hujung atas aci motor dilengkapi dengan dua meterai minyak, dan cincin pasir dipasang untuk membentuk struktur pencegahan pasir.

 3, Untuk mengelakkan aci pam daripada berjalan apabila dimulakan, aci pam dan aci motor disambungkan dengan gandingan, dan galas tujahan atas dipasang di bahagian bawah motor.

 4, Pelinciran motor dan galas pam adalah pelinciran air.

 5, Penggulungan stator motor diperbuat daripada wayar penggulungan motor tenggelam berkualiti tinggi, dengan prestasi penebat yang tinggi.

 6, Pam direka bentuk oleh komputer CAD, dengan struktur mudah dan prestasi teknikal yang baik.

Read More About 110 volt deep well submersible pump
 
Pasang

(1) Penyediaan sebelum pemasangan:
1. Periksa sama ada pam tenggelam memenuhi syarat penggunaan dan skop yang dinyatakan dalam manual.
2. Menggunakan obiect berat dengan diameter sama dengan diameter luar maksimum pam tenggelam, ukur sama ada diameter dalam lubang telaga boleh memuatkan pam tenggelam, dan ukur sama ada kedalaman telaga memenuhi keperluan pemasangan.
3. Periksa sama ada lubang telaga bersih dan sama ada air telaga itu keruh. Jangan sekali-kali menggunakan pam elektrik tenggelam untuk mencuci lumpur pam welor dan air pasir untuk mengelakkan kerosakan pramatang pada pam elektrik tenggelam.
4. Periksa sama ada kedudukan pengapit pemasangan welhead sesuai dan sama ada ia boleh menahan kualiti keseluruhan unit
5. Periksa sama ada komponen pam tenggelam lengkap dan dipasang dengan betul mengikut gambar rajah pemasangan dalam manual Tanggalkan skrin penapis dan putar gandingan untuk melihat sama ada ia berputar secara fleksibel
6. Tanggalkan skru air dan isikan rongga motor dengan air bersih dan tidak menghakis (nota. pastikan anda mengisinya), kemudian ketatkan skru air. Selepas 12 jam suntikan air, rintangan penebat motor hendaklah tidak kurang daripada 150M Q apabila diukur dengan meja goncang 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Gambar rajah proses pendawaian kabel yang dilampirkan adalah seperti berikut:
Read More About 4 inch deep well submersible pump

 

8. Gunakan multimeter untuk memeriksa sama ada wayar tiga fasa disambungkan dan sama ada rintangan DC adalah lebih kurang seimbang.
9. Periksa sama ada kapasiti litar dan pengubah telah terlebih beban, dan kemudian sambungkan suis perlindungan beban lampau atau peralatan permulaan. Lihat Jadual 2 untuk model tertentu, dan kemudianTuangkan baldi air ke dalam pam air dari alur keluar pam air untuk melincirkan galas getah dalam pam, dan kemudian letakkan pam elektrik tenggelam tegak dan stabil. Mula (tidak lebih dari satu saat) dan semak sama ada arah stereng adalah konsisten dengan tanda stereng. Jika tidak, tukar mana-mana dua penyambung kabel tiga fasa. Kemudian pasang penapis dan bersedia untuk turun ke dalam telaga. Jika digunakan dalam majlis-majlis khas (seperti parit, parit, sungai, kolam, kolam, dll.), pam elektrik mesti dibumikan dengan pasti.

 

(2) Peralatan dan alatan pemasangan:
1. Sepasang rantai angkat untuk lebih daripada dua tan.
2. Tripod dengan ketinggian menegak tidak kurang daripada empat meter.
3. Dua tali gantung (tali dawai) yang boleh menanggung berat lebih daripada satu tan (boleh menanggung berat set lengkap pam air).
4. Pasang dua pasang pengapit (splints).
5. Sepana, tukul, pemutar skru, alatan dan instrumen elektrik, dsb.

 

(3) Pemasangan pam elektrik:
1. Gambar rajah pemasangan pam elektrik tenggelam ditunjukkan dalam Rajah 2. Dimensi pemasangan khusus ditunjukkan dalam Jadual 3 "Senarai Dimensi Pemasangan Pam Elektrik Rendam".

 

2. Pam elektrik tenggelam dengan kepala kurang daripada 30 meter boleh dinaikkan terus ke dalam telaga menggunakan hos dan tali dawai atau tali rami lain yang boleh menanggung berat penuh keseluruhan mesin, paip air, dan air dalam paip.

 

3. Pam dengan kepala lebih daripada 30 meter menggunakan paip keluli, dan urutan pemasangan adalah seperti berikut:
①Gunakan pengapit untuk mengapit hujung atas bahagian pam air (motor dan pam air telah disambungkan pada masa ini), angkatnya dengan rantai gantung, dan ikat perlahan-lahan ke dalam perigi sehingga Letakkan pengapit pada kepala perigi dan keluarkan rantai gantung.
② Gunakan sepasang pengapit lain untuk mengapit paip, angkat dengan rantai gantung 15 cm dari bebibir, dan turunkannya perlahan-lahan. Antara bebibir paip dan bebibir pamLetakkan pad getah pada tempatnya dan ketatkan paip dan pam sama rata dengan bolt, nat dan pencuci spring.
③ Angkat sedikit pam tenggelam, keluarkan pengapit di hujung atas pam air, ikat kabel dengan kuat pada paip air dengan pita plastik, dan ikat perlahan-lahan sehingga Pengapit diletakkan di kepala telaga.
④Gunakan kaedah yang sama untuk mengikat semua paip air ke dalam telaga.
⑤Selepas kabel plumbum disambungkan ke suis kawalan, ia disambungkan ke bekalan kuasa tiga fasa.


(4) Perkara yang perlu diberi perhatian semasa pemasangan:
1. Jika fenomena jamming ditemui semasa proses mengepam, pusing atau tarik paip air untuk mengatasi masalah jamming point. Jika pelbagai langkah masih tidak berkesan, silaJangan paksa pam ke bawah untuk mengelakkan kerosakan pada pam elektrik tenggelam dan telaga.
2. Semasa pemasangan, pad getah hendaklah diletakkan pada bebibir setiap paip dan diketatkan sama rata.
3. Apabila pam air diturunkan ke dalam telaga, ia harus diletakkan di tengah-tengah paip telaga untuk mengelakkan pam daripada berjalan di dinding telaga untuk masa yang lama, menyebabkan pam bergetar dan motor menyapu dan terbakar. .
4. Tentukan kedalaman pam air ke dasar telaga mengikut keadaan pasir dan kelodak telaga yang mengalir. Jangan tanam pam di dalam lumpur. Jarak dari pam air ke dasar telaga biasanya tidak kurang daripada 3 meter (lihat Rajah 2).
5. Kedalaman kemasukan air pam air hendaklah tidak kurang daripada 1-1.5 meter dari paras air dinamik ke nod salur masuk air (lihat Rajah 2). Jika tidak, galas pam air mungkin mudah rosak.
6. Lif pam air tidak boleh terlalu rendah. Jika tidak, injap pintu perlu dipasang pada saluran paip air kepala telaga untuk mengawal aliran pam pada titik aliran berkadar untuk mengelakkan motor daripada terlebih beban dan terbakar akibat kadar aliran yang besar.
7. Apabila pam air sedang berjalan, keluaran air hendaklah berterusan dan sekata, arus harus stabil (di bawah keadaan kerja yang diberi nilai, secara amnya tidak lebih daripada 10% daripada arus undian), dan tidak sepatutnya ada getaran atau bunyi. Sekiranya terdapat sebarang kelainan, mesin hendaklah dihentikan untuk mengetahui punca dan menghapuskannya.
8. Apabila memasang, perhatikan tetapan wayar pembumian motor (lihat Rajah 2). Apabila paip air adalah paip keluli, bawa ia dari pengapit kepala telaga; apabila paip air adalah paip plastik, bawa ia dari tanda pembumian pam elektrik.

 

 
Penyelenggaraan dan Penyelenggaraan
  • (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
  • (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  • (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  • (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Paras air dinamik menurun ke bahagian salur masuk air, menyebabkan air terputus-putus.
  • 3 Pam tenggelam mempunyai getaran atau bunyi yang teruk.
  • 4 Voltan bekalan adalah lebih rendah daripada 340 volt.
  • 5 Fius terbakar.
  • 6 Paip bekalan air rosak.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • (5)Unit disassembly:
  • 1 Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2 skru ke bawah bolt air, masukkan air ke dalam ruang motor.
  • 3 keluarkan penapis, longgarkan skru tetap pada gandingan untuk menetapkan aci motor.
  • 4 skru ke bawah bolt yang menyambungkan bahagian salur masuk air dengan motor, dan pisahkan pam daripada motor (perhatikan kusyen unit semasa memisahkan, untuk mengelakkan lenturan aci pam)
  • 5 urutan pembongkaran pam ialah: (lihat rajah 1) bahagian salur masuk air, pendesak, cangkerang lencongan, pendesak...... badan injap semak, apabila mengeluarkan pendesak, gunakan alat khas untuk melonggarkan lengan kon tetap pendesak terlebih dahulu, dan elakkan lenturan dan lebam aci pam semasa proses pembongkaran.
  • 6 proses pembongkaran motor ialah: (lihat rajah 1) letakkan motor pada platform, dan tanggalkan nat, tapak, nat pengunci kepala aci, plat tujah, kunci, tempat duduk galas pemandu bawah dan bolt kepala dua dari bahagian bawah motor pula, dan kemudian keluarkan pemutar (perhatikan untuk tidak merosakkan pakej wayar) dan akhirnya keluarkan bahagian penyambung dan tempat duduk galas panduan atas.
  • 7 unit pemasangan: sebelum pemasangan, karat dan kotoran bahagian hendaklah dibersihkan, dan permukaan mengawan dan pengikat disalut dengan sealant, dan kemudian dipasang dalam susunan yang bertentangan dengan pembongkaran (aci motor bergerak ke atas dan ke bawah selepas pemasangan selama kira-kira satu milimeter), selepas pemasangan, gandingan hendaklah fleksibel, dan kemudian mesin ujian skrin penapis. Pam tenggelam hendaklah dibawa keluar dari telaga untuk dibongkar dan penyelenggaraan mengikut Perkara 5 selepas setahun beroperasi, atau kurang daripada setahun beroperasi tetapi dua tahun masa menyelam, dan bahagian yang haus hendaklah diganti.

 

 
Penyimpanan dan Penjagaan

This product is a submersible pump. In order to ensure that your equipment can work effectively for a long time, we provide the following suggestions: In winter, pay special attention to draining the water in the motor cavity to prevent freezing; roll up the cable and tie it well.When storage, select a room with a temperature below 40 °C and no corrosive substances or gases. When not in use for a long time, be sure to prevent the submersible pump from rusting.These simple methods will improve the service life and performance of the product, ensuring that you can fully enjoy the convenience and benefits it brings.

 

 
Memakai Bahagian
  • Pendesak
  • Lengan aci
  • Lengan aci getah
  • Cincin pengedap

 
Senario Aplikasi

01 Pengambilan air perigi dalam

02 Bekalan air bertingkat tinggi

03 bekalan air gunung

04 air menara

05 Pengairan pertanian

06 pengairan taman

07 pengambilan air sungai

08 air domestik

 

Jika anda berminat dengan produk kami, anda boleh memilih untuk meninggalkan maklumat anda di sini, dan kami akan menghubungi anda sebentar lagi.


Tulis mesej anda di sini dan hantarkan kepada kami

Jika anda berminat dengan produk kami, anda boleh memilih untuk meninggalkan maklumat anda di sini, dan kami akan menghubungi anda sebentar lagi.


ms_MYMalay