175QJB Deep Well Submersible Pump

Undertake OEM processing! According to user requirements, design and manufacture of various types of special requirements of non-standard submersible motor and pump. The product implementation standards: GB/T2816-2014 "well submersible pump", GB/T2818-2014 "well submersible asynchronous motor". WhatsApp:17855846335
PDF DOWNLOAD
Details
Tags
 
Product Overview

The product adopts special water-resistant wire for motor winding, with excellent characteristics such as high frequency shock resistance, pulse peak voltage shock resistance and high temperature aging resistance. The frequency conversion winding design ensures the motor to operate smoothly between 1Hz and 50Hz for a long time, making the frequency conversion deep well pump more energy saving and longer service life.

 

 
Conditions of Use

We are honored to introduce our products, this product provides three-phase AC 380V power supply (tolerance of ± 5%), 50HZ voltage (tolerance of ± 1%). At the same time, our products require strict water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor adopts closed or water-filled wet structure, which must be filled with clean water before use to prevent empty. Tighten the water charging and deflating bolts before use, otherwise, it is not allowed to use. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The well water flow shall meet the output and continuous operation requirements of the submersible pump, and the output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or inverted, but only vertically. The submersible pump must be equipped with cables according to requirements, and is equipped with external overload protection devices. It is strictly prohibited to conduct no-load tests on the pump without water. Our products guarantee to provide you with high quality and stable performance, while meeting your needs to ensure safe and reliable.

 

 
Model Meaning

 
Partial Model Reference
Model Flow (m3/h) Head
(m)

Rotatingspeed

(change/point)

Waterpump(%)  Outlet
diameter
(mm)
Applicable well
diameter(mm) 
 Rated
power(KW)
Rated
voltage(V)
Rated
current(A)
Motorefficiency (%) power factorcosφ   Unit
Radial Maximu size(mm)
175QJ10-42 10 42 2850 53 50  175above 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175above 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175above 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175above 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175above 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175above 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80  175above 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175above 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175above 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175above 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175above 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175above 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175above 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Safety Precautions

This well submersible pump is a pump suitable for clean water. Digging new wells and pumping sediment and turbid water are strictly prohibited. The voltage grade of the well pump is 380V/50HZ. Submersible motors with other voltage grades need to be customized. Underground cables must use waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as overload short circuit protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be tripped in time. During installation and use, the pump must be reliably grounded. It is prohibited to push and pull the switch when hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be injected with distilled water or non-corrosive clear cold water in the inner cavity, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. The same as the steering instructions. Pay attention to safety when the pump is upright to prevent tilting and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump flow at low lift or in high lift pull too large, resulting in extreme wear of thrust bearings and other components, the motor due to overload and burn. After put into the well, the measurement of the motor and the ground insulation resistance value, not less than 100M. After the start, regular observation of voltage and current, and check the motor winding insulation is in line with the requirements of the provisions. If the temperature of the storage site is below the freezing point, the water in the pump chamber should be drained to prevent the water in the motor chamber from freezing and damaging the motor due to low temperature.

 

 
Introduction to Structure

Brief introduction of structure: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. Motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable and other components.


The main features of the product include:

1.The motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing, the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the change of the temperature rise of the motor.

2.In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft is equipped with two oil seals, and a sand ring is installed to form a sand prevention structure.

3.In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed at the lower part of the motor.

4.The lubrication of the motor and the pump bearing is water lubrication.

5.The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.

6.The pump is designed by computer CAD, with simple structure and good technical performance.

 
Install

(1)Preparation before installation:
1. Check whether the submersible pump meets the usage conditions and scope specifed in the manual.
2. Using a heavy obiect with a diameter equal to the maximum outer diameter of the submersible pump, measure whether the inneldiameter of the wellbore can fit the submersible pump, and measure whether the well depth meets the installation requirements.
3. Check whether the wellbore is clean and whether the well water is turbid. Never use a submersible electric pump to wash the welor pump mud and sand water to avoid premature damage to the submersible electric pump.
4. Check whether the position of the welhead installation clamp is suitable and whether it can withstand the qualty of the entire unit
5. Check if the submersible pump components are complete and installed properly according to the assembly diagram in the manualRemove the filter screen and rotate the coupling to see if it rotates flexibly
6. Unscrew the water screw and fillthe motor cavity with clean, non corrosive water (note. be sure to fil it up), then tighten the waterscrew. After 12 hours of water injection, the insulation resistance of the motor should not be less than 150M Q when measured witha 500V shaking table.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

The attached cable wiring process diagram is as follows:

8. Use a multimeter to check whether the three-phase wires are connected and whether the DC resistance is approximately balanced.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and thenPour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2)Installation equipment and tools:
1. One pair of lifting chains for more than two tons.
2. A tripod with a vertical height of no less than four meters.
3. Two hanging ropes (wire ropes) that can bear a weight of more than one ton (can bear the weight of a complete set of water pumps).
4. Install two pairs of clamps (splints).
5. Wrenches, hammers, screwdrivers, electrical tools and instruments, etc.

 

(3)Electric pump installation:
1. The installation diagram of the submersible electric pump is shown in Figure 2. The specific installation dimensions are shown in Table 3 "List of Installation Dimensions of the Submersible Electric Pump".

 

2. Submersible electric pumps with a head less than 30 meters can be hoisted directly into the well using hoses and wire ropes or other hemp ropes that can bear the full weight of the entire machine, water pipes, and water in the pipes.

 

3. Pumps with a head of more than 30 meters use steel pipes, and the installation sequence is as follows:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well untilPut the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flangePut the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Lift the submersible pump slightly, remove the clamp on the upper end of the water pump, tie the cable firmly to the water pipe with a plastic tape, and slowly tie it down until The clamp is placed at the wellhead.
④Use the same method to tie all water pipes into the well.
⑤After the lead-out cable is connected to the control switch, it is connected to the three-phase power supply.


(4)Things to note during installation:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, pleaseDo not force the pump down to avoid damage to the submersible electric pump and the well.
2. During installation, a rubber pad should be placed at the flange of each pipe and tightened evenly.
3. When the water pump is lowered into the well, it should be placed in the middle of the well pipe to prevent the pump from running against the well wall for a long time, causing the pump to vibrate and the motor to sweep and burn.
4. Determine the depth of the water pump to the bottom of the well according to the flowing sand and silt conditions of the well. Do not bury the pump in the mud. The distance from the water pump to the bottom of the well is generally not less than 3 meters (see Figure 2).
5. The water entry depth of the water pump should be no less than 1-1.5 meters from the dynamic water level to the water inlet node (see Figure 2). Otherwise, the water pump bearings may be easily damaged.
6. The lift of the water pump cannot be too low. Otherwise, a gate valve needs to be installed on the wellhead water pipeline to control the pump flow at the rated flow point to prevent the motor from being overloaded and burned out due to large flow rates.
7. When the water pump is running, the water output should be continuous and even, the current should be stable (under rated working conditions, generally no more than 10% of the rated current), and there should be no vibration or noise. If there is any abnormality, the machine should be stopped to find out the cause and eliminate it.
8. When installing, pay attention to the setting of the motor grounding wire (see Figure 2). When the water pipe is a steel pipe, lead it from the wellhead clamp; when the water pipe is a plastic pipe, lead it from the grounding mark of the electric pump.

 

 
Maintenance and Maintenance
  • 1.After installing the submersible pump, recheck the insulation resistance and three-phase continuity switch, check whether there is any error in the connection between the instrument and the starting equipment.If there is no problem, you can start to test the machine. After starting, observe whether the indication reading of each instrument is correct.If the rated voltage and current specified on the nameplate are exceeded, please observe whether the pump has noise or vibration.If everything is normal, it can be put into operation. After the pump runs for the first time for four hours, the motor thermal insulation resistance should be closed and tested quickly. Its value should not be less than 0.5 megaohm. After the pump stops, it should be restarted after five minutes to prevent the water column in the pipeline from completely reversing, which will cause the motor to burn out due to excessive current.
  •  
  • 2.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
  • 1.Under the rated working condition, the current exceeds 20%.
  • 2.The dynamic water level drops to the water inlet section, resulting in intermittent water.
  • 3.The submersible pump has severe vibration or noise.
  • 4.The supply voltage is lower than 340 volts.
  • 5.A fuse is burned out.
  • 6.The water pipeline is damaged.
  • 7.The motor's insulation resistance to the geothermal state is lower than 0.5 megaohm.
  •  
  • 3.Unit disassembly:
  • - Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • - screw down the water bolt, put out the water in the motor chamber.
  • - remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  •  
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Storage and Custody

 1, put out the water in the motor cavity (especially in winter to prevent the motor from freezing), and tie the cable well.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, long-term use should pay attention to the rust prevention of submersible pumps.

 

 
Wearing Parts
  • Impeller
  • Shaft sleeve
  • Rubber shaft sleeve
  • Sealing ring

 

 
Application Scenarios

01 Deep well water intake

02 High-rise water supply

03 mountain water supply

04 tower water

05 Agricultural irrigation

06 garden irrigation

07 river water intake

08 domestic water

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


Write your message here and send it to us

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


en_USEnglish