125QJB Deep Well Submersible Pump

Maacht OEM Veraarbechtung! No Benotzer Ufuerderunge, Design an Fabrikatioun vun verschidden Zorte vu speziellen Ufuerderunge vun Net-Standard submersible Motor a Pompel. D'Produktimplementatiounsnormen: GB/T2816-2014 "gutt submersible Pompel", GB/T2818-2014 "gutt submersible asynchronous Motor". WhatsApp: 17855846335
PDF DOWNLOAD
Detailer
Tags
 
Produit Iwwersiicht

Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.

 

 
Konditioune vun benotzen

1, Stroumversuergung: Dräi-Phase AC 380V (Toleranz +/- 5%), 50HZ (Toleranz +/- 1%).

2, Waasserqualitéit:

(1) water temperature is not higher than 20 °C;

(2) fest Gëftstoffer Inhalt (Mass Verhältnis) ass net méi wéi 0,01%;

(3) PH Wäert (pH) 6,5-8,5;

(4) Waasserstoff sulfide Inhalt ass net méi grouss wéi 1.5mg / L;

(5) Chloridiongehalt ass net méi wéi 400mg/L.

3, de Motor ass zou oder Waasser-gefëllt naass Struktur, virum Gebrauch der submersible Motor Kavitéit muss voller propper Waasser sinn, falsch voll ze verhënneren, an dann d'Waasser Sprëtz, Loft Fräisetzung Bolzen zouzedrécken, soss net erlaabt ze benotzen

4, Tauchpompel muss komplett am Waasser ënnergeet ginn, d'Tauchdéift ass net méi wéi 70m, de Buedem vun der Tauchpompel vun der Brunn ass net manner wéi 3m.

5, soll de Well Waasser Flux fäeg sinn der submersible Pompel Waasser Wasserstoff a kontinuéierlech Operatioun ze treffen, der submersible Pompel Waasser Wasserstoff soll op 0,7 - 1,2 Mol de bewäert Flux kontrolléiert ginn.

6, de Brunn soll riicht sinn, d'Tauchtpompel kann net benotzt oder gedumpt ginn, nëmme vertikal benotzt.

7, muss d'Tauchtpompel mat dem Kabel entspriechend den Ufuerderunge passen, an dem externen Iwwerlaaschtschutzapparat. 8, ass d'Pompel streng verbueden ouni Waasser No-Laascht Test Maschinn

 

 
Model Bedeitung

125QJB Deep Well Submersible Pump

 
Deelweis Modell Referenz
Modell Flow (m3/h)  Kapp
(m)
 Rotating speed(change/point)  Waasserpompel (%)  Outlet
Duerchmiesser
(mm)
Gutt applicabel
Duerchmiesser (mm) 
Bewäert
Muecht (KW)
Rated voltage(V) Ratedcurrent(A)  Motoreffizienz (%)  power factorcosφ  Eenheet
Radial Maximum Gréisst (mm)
Remarque
125QJ5-34 5 34 2850 53 40  125uewen 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125uewen 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125uewen 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125uewen 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125uewen 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125uewen 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125uewen 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125uewen 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125uewen 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125uewen 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125uewen 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125uewen 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125uewen 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125uewen 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      
 
Sécherheet Mesuren

 The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.

 

 
Aféierung an d'Struktur
The pump part is mainly composed of pump shaft,impeller,diversion shell,rubber bearing,check valve body(optional)and other components.The motor part is mainly composed of base,pressure regulating diaphragm,thrust bearing,thrust plate,lower guide bearing seat,stator,rotor,upper guide bearing seat,sand ring,water inlet section,lead cable and other components.

D'Haaptmerkmale vum Produkt enthalen:

1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

125QJB Deep Well Submersible Pump

 

 
Installéieren

(1) Virbereedung virun der Installatioun:
1. Iwwerpréift ob d'Tauchtpompel d'Benotzungsbedéngungen an den Ëmfang entsprécht, déi am Handbuch spezifizéiert sinn.
2. Benotzt e schwéieren Objet mat engem Duerchmiesser gläich wéi de maximalen äusseren Duerchmiesser vun der Tauchpompel, moosst ob den Inneldiameter vun der Wellbore d'Tauchpompel passt, a moosst ob d'Wueldéift d'Installatiounsufuerderunge entsprécht.

3. Iwwerpréift ob de Wellbore propper ass an ob d'Wuelwasser türbid ass. Benotzt ni eng submersibel elektresch Pompel fir de Welor Pompel Schlamm a Sand Waasser ze wäschen fir virzäitegen Schued un der Tauchtpompel ze vermeiden.

4. Iwwerpréift ob d'Positioun vun der Wellhead Installatiounsklem gëeegent ass an ob et d'Qualitéit vun der ganzer Eenheet widderstoen kann

5. Iwwerpréift ob d'Tauchpompelkomponenten komplett sinn a richteg installéiert sinn no dem Montagediagramm am Handbuch De Filterbildschierm ewechhuelen an d'Kupplung rotéieren fir ze kucken ob se flexibel rotéiert

6. Schrauwen d'Waasserschrauwen un a fëllt d'Motorhuelraum mat propperem, net ätzendem Waasser (Notiz. Gitt sécher datt Dir se fillt), da dréit d'Waasserschraube fest. No 12 Stonnen Waasserinjektioun, däerf d'Isolatiounsresistenz vum Motor net manner wéi 150M Q sinn wann se mat engem 500V Schüttdësch gemooss ginn.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.

After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Dat befestegt Kabelverdrahtungsdiagramm ass wéi follegt:

125QJB Deep Well Submersible Pump

8. Benotzt e Multimeter fir z'iwwerpréiwen ob d'Drei-Phas-Drähte verbonne sinn an ob d'DC-Resistenz ongeféier ausgeglach ass.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2) Installatioun Ausrüstung an Tools:
1. Ee Paar Liftketten fir méi wéi zwee Tonnen.
2. E Stativ mat enger vertikaler Héicht vun net manner wéi véier Meter.
3. Zwee hängend Seeler (Draadseeler), déi e Gewiicht vu méi wéi engem Ton droen kënnen (kann d'Gewiicht vun engem komplette Set vu Waasserpompelen droen).
4. Installéiert zwee Puer Klameren (Splint).
5. Wrenches, Hammers, screwdrivers, elektresch Handwierksgeschir an Instrumenter, etc.

 

(3) Elektresch Pompel Installatioun:
1. D'Installatiounsdiagramm vun der Tauchpompel gëtt an der Figur 2. Déi spezifesch Installatiounsdimensioune ginn an der Tabell 3 "Lëscht vun Installatiounsdimensioune vun der Tauchtpompel" gewisen.


2. Submersibel elektresch Pompelen mat engem Kapp manner wéi 30 Meter kënnen direkt an d'Brunn geheien ginn mat Schlauchen a Drahtseeler oder aner Hanf Seeler, déi de ganze Gewiicht vun der ganzer Maschinn, Waasserleitungen a Waasser an de Päifen droen kënnen.

3. Pompelen mat engem Kapp vu méi wéi 30 Meter benotzen Stahlleitungen, an d'Installatiounssequenz ass wéi follegt:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Lift d'Tauchtpompel liicht op, huelt d'Klemm op der ieweschter Enn vun der Waasserpompel erof, bannen de Kabel fest an d'Waasserleitung mat engem Plastiksband, a bannen se lues erof bis D'Klemm op der Wellhead plazéiert ass.
④Benotz déiselwecht Method fir all Waasserleitungen an d'Bunn ze verbannen.
⑤Nodeems de Lead-Out-Kabel un de Kontrollschalter ugeschloss ass, ass et mat der Dräi-Phase-Energieversuergung ugeschloss.

 

(4) Saachen ze notéieren während der Installatioun:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Bei der Installatioun sollt e Gummi-Pad am Flange vun all Päif plazéiert ginn a gläichméisseg festgehalen ginn.
3. Wann d'Waasserpompel an d'Wuel erofgesat gëtt, sollt et an der Mëtt vun der Brunnpipe plazéiert ginn, fir datt d'Pompel net laang géint d'Wuelmauer leeft, sou datt d'Pompel vibréiert an de Motor schëdden a brennt. .
4. Bestëmmt d'Tiefe vun der Waasserpompel bis zum Buedem vun der Brunn no de fléissende Sand a Siltbedingunge vun der Brunn. Begruewen d'Pompel net am Bulli. D'Distanz vun der Waasserpompel bis zum Enn vun der Brunn ass normalerweis net manner wéi 3 Meter (kuckt Figur 2).
5. D'Waasserentrée Tiefe vun der Waasserpompel sollt net manner wéi 1-1,5 Meter vum dynamesche Waasserniveau op d'Waasserinletknuet sinn (kuckt Figur 2). Soss kënnen d'Waasserpompellager liicht beschiedegt ginn.
6. De Lift vun der Waasserpompel kann net ze niddreg sinn. Soss muss e Paartventil op der Wellhead Waasserleitung installéiert ginn fir de Pompelstroum um bewäertte Flosspunkt ze kontrolléieren fir ze verhënneren datt de Motor iwwerlaascht a verbrannt gëtt wéinst grousse Flowraten.
7. Wann d'Waasserpompel leeft, soll d'Waasserausgang kontinuéierlech sinn a souguer, de Stroum soll stabil sinn (ënner bewäertte Aarbechtsbedingunge, allgemeng net méi wéi 10% vum bewäerten Stroum), an et sollt keng Schwéngung oder Kaméidi sinn. Wann et eng Anomalie ass, sollt d'Maschinn gestoppt ginn fir d'Ursaach erauszefannen an ze eliminéieren.
8. Beim Installatioun, oppassen op d'Astellung vum Motor Buedemdraad (kuckt Bild 2). Wann d'Waasser Päif e Stol Päif ass, féiert et aus der wellhead clamp; wann d'Waasserleitung e Plastiksleit ass, féiert se vun der Äerdmarke vun der elektrescher Pompel.

 

 
Ënnerhalt an Ënnerhalt
  • 1.Nodeems d'Tauchpompel installéiert ass, kontrolléiert d'Isolatiounsresistenz an d'Drei-Phaseleitung vum Schalter erëm, kontrolléiert ob d'Instrument an d'Verbindung vun der Startausrüstung falsch sinn, wann et kee Problem ass, kann d'Proufmaschinn gestart ginn, a beobachten ob d'Indikatorliesungen vum Instrument d'Nominalspannung a Stroum, déi op der Nummplack nom Start spezifizéiert sinn, iwwerschreiden, a beobachten ob d'Pompel Kaméidi a Schwéngungsphenomen huet, an a Betrib geholl wann alles normal ass.
  • 2.No der éischter Operatioun vun der Pompel fir véier Stonne soll de Motor ofgeschalt ginn fir d'thermesch Isolatiounsresistenz séier ze testen, a säi Wäert soll net manner wéi 0,5 Megaohm sinn.
  • 3.Nodeems d'Pompel ofgeschalt gëtt, sollt et no fënnef Minutten gestart ginn, fir ze verhënneren, datt d'Waasserkolonn an der Päif komplett ëmgedréit gëtt an exzessiv Motorstroum a Verbrennung verursaacht.
  • 4.Nodeems d'Pompel an normaler Operatioun gesat gëtt, fir säi Liewensdauer ze verlängeren, ass et néideg ze kontrolléieren ob d'Versuergungsspannung, d'Aarbechtsstroum an d'Isolatiounsresistenz normal regelméisseg sinn. Wann déi folgend Konditioune fonnt ginn, sollt d'Pompel direkt ausgeschalt ginn fir Probleemer ze léisen.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Den dynamesche Waasserniveau fällt op d'Waasserintaksektioun, wat intermittéiert Waasser verursaacht.
  • 3 D'Tauchtpompel huet schwéier Schwéngungen oder Kaméidi.
  • 4 D'Versuergungsspannung ass manner wéi 340 Volt.
  • 5 Eng Sicherung ass ausgebrannt.
  • 6 D'Waasserversuergungsleitung ass beschiedegt.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Lagerung a Versuergung

This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.

 

 
Droen Deeler
    • Impeller
    • Schaft Hülse
    • Gummistécker Schacht Hülse
    •  Dichtungsring

 
Applikatioun Szenarie

01 Déift gutt Waasser ofgeroden

02 Héichwaasserversuergung

03 Bierg Waasser Fourniture 

04 Tuerm Waasser

05 Landwirtschaftlech Bewässerung

06 Gaart Bewässerung

07 Floss Waasser ofgeroden

08 Hauswaasser

 

Wann Dir un eise Produkter interesséiert sidd, kënnt Dir wielen Är Informatioun hei ze verloossen, a mir wäerte kuerz mat Iech a Kontakt sinn.


Schreift Äre Message hei a schéckt en un eis

Wann Dir un eise Produkter interesséiert sidd, kënnt Dir wielen Är Informatioun hei ze verloossen, a mir wäerte kuerz mat Iech a Kontakt sinn.


lbLuxembourgish