175QJB Diepput dompelpomp

Onderneem OEM-verwerking! Volgens gebruikersvereistes, ontwerp en vervaardiging van verskillende soorte spesiale vereistes van nie-standaard dompelmotor en pomp. Die produkimplementeringstandaarde: GB/T2816-2014 "put dompelpomp", GB/T2818-2014 "goed dompelbare asynchrone motor". WhatsApp: 17855846335
PDF DOWNLOAD
Besonderhede
Merkers
 
Produk Oorsig

The product adopts special water-resistant wire for motor winding, with excellent characteristics such as high frequency shock resistance, pulse peak voltage shock resistance and high temperature aging resistance. The frequency conversion winding design ensures the motor to operate smoothly between 1Hz and 50Hz for a long time, making the frequency conversion deep well pump more energy saving and longer service life.

 

 
Gebruiksvoorwaardes

We are honored to introduce our products, this product provides three-phase AC 380V power supply (tolerance of ± 5%), 50HZ voltage (tolerance of ± 1%). At the same time, our products require strict water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor adopts closed or water-filled wet structure, which must be filled with clean water before use to prevent empty. Tighten the water charging and deflating bolts before use, otherwise, it is not allowed to use. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The well water flow shall meet the output and continuous operation requirements of the submersible pump, and the output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or inverted, but only vertically. The submersible pump must be equipped with cables according to requirements, and is equipped with external overload protection devices. It is strictly prohibited to conduct no-load tests on the pump without water. Our products guarantee to provide you with high quality and stable performance, while meeting your needs to ensure safe and reliable.

 

 
Model Betekenis

175QJB Deep Well Submersible Pump

 
Gedeeltelike Modelverwysing
Model Vloei (m3/h) Kop
(m)

Roterende spoed

(verander/punt)

Water pomp(%)  Uitlaat
deursnee
(mm)
Goed toepaslik
deursnee (mm) 
 Gegradeer
power(KW)
Gegradeer
spanning (V)
Gegradeer
stroom (A)
Motordoeltreffendheid (%) power factorcosφ   Eenheid
Radiale maksimum grootte (mm)
175QJ10-42 10 42 2850 53 50  175hierbo 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175hierbo 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175hierbo 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175hierbo 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175hierbo 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175hierbo 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80  175hierbo 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175hierbo 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175hierbo 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175hierbo 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175hierbo 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175hierbo 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175hierbo 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Veiligheidsmaatreëls

This well submersible pump is a pump suitable for clean water. Digging new wells and pumping sediment and turbid water are strictly prohibited. The voltage grade of the well pump is 380V/50HZ. Submersible motors with other voltage grades need to be customized. Underground cables must use waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as overload short circuit protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be tripped in time. During installation and use, the pump must be reliably grounded. It is prohibited to push and pull the switch when hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be injected with distilled water or non-corrosive clear cold water in the inner cavity, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. The same as the steering instructions. Pay attention to safety when the pump is upright to prevent tilting and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump flow at low lift or in high lift pull too large, resulting in extreme wear of thrust bearings and other components, the motor due to overload and burn. After put into the well, the measurement of the motor and the ground insulation resistance value, not less than 100M. After the start, regular observation of voltage and current, and check the motor winding insulation is in line with the requirements of the provisions. If the temperature of the storage site is below the freezing point, the water in the pump chamber should be drained to prevent the water in the motor chamber from freezing and damaging the motor due to low temperature.

 

 
Inleiding tot Struktuur

Kort inleiding van die struktuur: pompdeel bestaan ​​hoofsaaklik uit pompas, stuwer, afleidingsdop, rubberlager, terugslagklepliggaam (opsionele onderdele) en ander komponente. Motoronderdeel bestaan ​​hoofsaaklik uit basis, drukregulerende film, stootlager, stootplaat, onderste geleide-laer-sitplek, stator, rotor, boonste geleide-laer-sitplek, sandring, waterinlaatgedeelte, kabel en ander komponente.


Die belangrikste kenmerke van die produk sluit in:

1.The motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing, the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the change of the temperature rise of the motor.

2.In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft is equipped with two oil seals, and a sand ring is installed to form a sand prevention structure.

3.In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed at the lower part of the motor.

4.The lubrication of the motor and the pump bearing is water lubrication.

5.The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.

6.The pump is designed by computer CAD, with simple structure and good technical performance.

175QJB Deep Well Submersible Pump
 
Installeer

(1) Voorbereiding voor installasie:
1. Kontroleer of die dompelpomp voldoen aan die gebruiksvoorwaardes en omvang gespesifiseer in die handleiding.
2. Gebruik 'n swaar voorwerp met 'n deursnee gelyk aan die maksimum buitenste deursnee van die dompelpomp, meet of die binnedeursnee van die boorput by die dompelpomp kan pas, en meet of die putdiepte aan die installasievereistes voldoen.
3. Kontroleer of die boorput skoon is en of die putwater troebel is. Moet nooit 'n dompelpomp gebruik om die welor pomp modder en sand water te was om voortydige skade aan die dompel elektriese pomp te vermy.
4. Kontroleer of die posisie van die putkopinstallasieklem geskik is en of dit die kwaliteit van die hele eenheid kan weerstaan
5. Kontroleer of die dompelpompkomponente volledig en behoorlik geïnstalleer is volgens die samestellingsdiagram in die handleiding Verwyder die filterskerm en draai die koppeling om te sien of dit buigsaam draai
6. Skroef die waterskroef los en vul die motorholte met skoon, nie-korrosiewe water (let wel. maak seker dat jy dit vol maak), draai dan die waterskroef vas. Na 12 uur se waterinspuiting moet die isolasieweerstand van die motor nie minder as 150M Q wees as dit gemeet word met 'n 500V skudtafel nie.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Die aangehegte kabelbedradingsprosesdiagram is soos volg:
175QJB Deep Well Submersible Pump

8. Gebruik 'n multimeter om te kyk of die driefase-drade verbind is en of die GS-weerstand ongeveer gebalanseerd is.
9. Kontroleer of die stroombaan en transformatorkapasiteit oorlaai is, en koppel dan die oorbelastingbeskermingskakelaar of aansittoerusting aan. Sien Tabel 2 vir spesifieke modelle, en Gooi dan 'n emmer water in die waterpomp vanaf die waterpompuitlaat om die rubberlaers in die pomp te smeer, en plaas dan die dompel elektriese pomp regop en bestendig.Begin (nie meer as een sekonde nie) en kyk of die stuurrigting ooreenstem met die stuurteken. Indien nie, ruil enige twee verbindings van die driefase-kabel om. Installeer dan die filter en maak gereed om in die put af te gaan. Indien dit in spesiale geleenthede gebruik word (soos slote, slote, riviere, damme, damme, ens.), moet die elektriese pomp betroubaar geaard wees.

 

(2) Installasie toerusting en gereedskap:
1. Een paar hyskettings vir meer as twee ton.
2. 'n Driepoot met 'n vertikale hoogte van nie minder nie as vier meter.
3. Twee hangtoue (draadtoue) wat 'n gewig van meer as een ton kan dra (kan die gewig van 'n volledige stel waterpompe dra).
4. Installeer twee pare klampe (spalke).
5. Sleutels, hamers, skroewedraaiers, elektriese gereedskap en instrumente, ens.

 

(3) Elektriese pompinstallasie:
1. Die installasiediagram van die dompel-elektriese pomp word in Figuur 2 getoon. Die spesifieke installasie-afmetings word in Tabel 3 "Lys van Installasie-afmetings van die dompel-elektriese pomp" getoon.

 

2. Dompelbare elektriese pompe met 'n hoogte van minder as 30 meter kan direk in die put gehys word deur gebruik te maak van slange en draadtoue of ander henneptoue wat die volle gewig van die hele masjien, waterpype en water in die pype kan dra.

 

3. Pompe met 'n hoogte van meer as 30 meter gebruik staalpype, en die installasievolgorde is soos volg:
①Gebruik 'n klem om die boonste punt van die waterpompdeel vas te klem (die motor en waterpomp is op hierdie tydstip gekoppel), lig dit met 'n hangketting en bind dit stadig in die put vas totdat Sit die klem op die putkop en verwyder die hang ketting.
② Gebruik nog 'n paar klampe om 'n pyp vas te klem, lig dit met 'n hangketting 15 cm weg van die flens af, en laat sak dit stadig. Tussen pypflens en pompflensSit die rubberkussing in plek en trek die pyp vas en pomp eweredig met boute, moere en veerringe.
③ Lig die dompelpomp effens op, verwyder die klem aan die boonste punt van die waterpomp, bind die kabel stewig aan die waterpyp vas met 'n plastiekband, en maak dit stadig vas totdat Die klem by die putkop geplaas is.
④Gebruik dieselfde metode om alle waterpype in die put vas te bind.
⑤ Nadat die uitloopkabel aan die beheerskakelaar gekoppel is, word dit aan die driefase-kragbron gekoppel.


(4) Dinge om op te let tydens installasie:
1. Indien 'n versteuringsverskynsel tydens die pompproses gevind word, draai of trek die waterpyp om die vassteekpunt te oorkom. As verskeie maatreëls steeds nie werk nie, moet asseblief nie die pomp af dwing om skade aan die dompelpomp en die put te voorkom nie.
2. Tydens installasie moet 'n rubberkussing by die flens van elke pyp geplaas word en eweredig vasgedraai word.
3. Wanneer die waterpomp in die put laat sak word, moet dit in die middel van die putpyp geplaas word om te verhoed dat die pomp vir 'n lang tyd teen die putwand loop, wat veroorsaak dat die pomp vibreer en die motor vee en brand .
4. Bepaal die diepte van die waterpomp tot by die bodem van die put volgens die vloeiende sand- en sliktoestande van die put. Moenie die pomp in die modder begrawe nie. Die afstand vanaf die waterpomp na die bodem van die put is oor die algemeen nie minder nie as 3 meter (sien Figuur 2).
5. Die watertoevoerdiepte van die waterpomp moet nie minder nie as 1-1,5 meter wees vanaf die dinamiese watervlak na die waterinlaatknooppunt (sien Figuur 2). Andersins kan die waterpomplaers maklik beskadig word.
6. Die hysbak van die waterpomp kan nie te laag wees nie. Andersins moet 'n hekklep op die putkopwaterpyplyn geïnstalleer word om die pompvloei by die aangewese vloeipunt te beheer om te verhoed dat die motor oorlaai en uitbrand as gevolg van groot vloeitempo's.
7. Wanneer die waterpomp aan die gang is, moet die wateruitset aaneenlopend en eweredig wees, die stroom moet stabiel wees (onder gegradeerde werksomstandighede, gewoonlik nie meer as 10% van die aangeslane stroom), en daar moet geen vibrasie of geraas wees nie. As daar enige abnormaliteit is, moet die masjien gestop word om die oorsaak uit te vind en dit uit te skakel.
8. Wanneer jy installeer, let op die instelling van die motor se aarddraad (sien Figuur 2). Wanneer die waterpyp 'n staalpyp is, lei dit uit die putkopklem; wanneer die waterpyp 'n plastiekpyp is, lei dit vanaf die aardmerk van die elektriese pomp.

 

 
Onderhoud en Onderhoud
  • 1.After installing the submersible pump, recheck the insulation resistance and three-phase continuity switch, check whether there is any error in the connection between the instrument and the starting equipment.If there is no problem, you can start to test the machine. After starting, observe whether the indication reading of each instrument is correct.If the rated voltage and current specified on the nameplate are exceeded, please observe whether the pump has noise or vibration.If everything is normal, it can be put into operation. After the pump runs for the first time for four hours, the motor thermal insulation resistance should be closed and tested quickly. Its value should not be less than 0.5 megaohm. After the pump stops, it should be restarted after five minutes to prevent the water column in the pipeline from completely reversing, which will cause the motor to burn out due to excessive current.
  •  
  • 2.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
  • 1.Under the rated working condition, the current exceeds 20%.
  • 2.The dynamic water level drops to the water inlet section, resulting in intermittent water.
  • 3.The submersible pump has severe vibration or noise.
  • 4.The supply voltage is lower than 340 volts.
  • 5.A fuse is burned out.
  • 6.The water pipeline is damaged.
  • 7.The motor's insulation resistance to the geothermal state is lower than 0.5 megaohm.
  •  
  • 3.Unit disassembly:
  • - Maak die kabelbinder los, verwyder die pyplyndeel en verwyder die draadplaat.
  • - screw down the water bolt, put out the water in the motor chamber.
  • - verwyder die filter, los die vaste skroef op die koppeling om die motoras vas te maak.
  •  
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Berging en bewaring

 1, sit die water in die motorholte uit (veral in die winter om te verhoed dat die motor vries), en bind die kabel goed vas.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, langtermyn gebruik moet aandag gee aan die roes voorkoming van dompelpompe.

 

 
Dra Onderdele
  • Impeller
  • Skaghuls
  • Rubber skag huls
  • Seëlring

 

 
Toepassingsscenario's

01 Diep put water inname

02 Hoë watervoorsiening

03 bergwatervoorsiening

04 toring water

05 Landboubesproeiing

06 tuinbesproeiing

07 rivier water inname

08 huishoudelike water

As jy belangstel in ons produkte, kan jy kies om jou inligting hier te los, en ons sal binnekort met jou in verbinding tree.


Skryf jou boodskap hier en stuur dit vir ons

As jy belangstel in ons produkte, kan jy kies om jou inligting hier te los, en ons sal binnekort met jou in verbinding tree.


afAfrikaans