The product adopts special water-resistant wire for motor winding, with excellent characteristics such as high frequency shock resistance, pulse peak voltage shock resistance and high temperature aging resistance. The frequency conversion winding design ensures the motor to operate smoothly between 1Hz and 50Hz for a long time, making the frequency conversion deep well pump more energy saving and longer service life.
We are honored to introduce our products, this product provides three-phase AC 380V power supply (tolerance of ± 5%), 50HZ voltage (tolerance of ± 1%). At the same time, our products require strict water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor adopts closed or water-filled wet structure, which must be filled with clean water before use to prevent empty. Tighten the water charging and deflating bolts before use, otherwise, it is not allowed to use. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The well water flow shall meet the output and continuous operation requirements of the submersible pump, and the output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or inverted, but only vertically. The submersible pump must be equipped with cables according to requirements, and is equipped with external overload protection devices. It is strictly prohibited to conduct no-load tests on the pump without water. Our products guarantee to provide you with high quality and stable performance, while meeting your needs to ensure safe and reliable.
Үлгі | Ағым (м3/сағ) | Бас (м) |
Айналу жылдамдығы (өзгерту/нүкте) |
Су сорғысы(%) | Розетка диаметрі (мм) |
Жақсы қолданылады диаметрі (мм) |
Бағаланған power(KW) |
Бағаланған кернеу(V) |
Бағаланған ток (A) |
Мотор тиімділігі (%) | қуат коэффициентіcosφ | Бірлік Радиалды максималды өлшем (мм) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175жоғарыда | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175жоғарыда | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175жоғарыда | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175жоғарыда | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175жоғарыда | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175жоғарыда | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175жоғарыда | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175жоғарыда | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175жоғарыда | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175жоғарыда | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175жоғарыда | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175жоғарыда | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175жоғарыда | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
This well submersible pump is a pump suitable for clean water. Digging new wells and pumping sediment and turbid water are strictly prohibited. The voltage grade of the well pump is 380V/50HZ. Submersible motors with other voltage grades need to be customized. Underground cables must use waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as overload short circuit protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be tripped in time. During installation and use, the pump must be reliably grounded. It is prohibited to push and pull the switch when hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be injected with distilled water or non-corrosive clear cold water in the inner cavity, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. The same as the steering instructions. Pay attention to safety when the pump is upright to prevent tilting and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump flow at low lift or in high lift pull too large, resulting in extreme wear of thrust bearings and other components, the motor due to overload and burn. After put into the well, the measurement of the motor and the ground insulation resistance value, not less than 100M. After the start, regular observation of voltage and current, and check the motor winding insulation is in line with the requirements of the provisions. If the temperature of the storage site is below the freezing point, the water in the pump chamber should be drained to prevent the water in the motor chamber from freezing and damaging the motor due to low temperature.
Құрылымды қысқаша таныстыру: сорғы бөлігі негізінен сорғы білігінен, жұмыс дөңгелегінен, бұру қабығынан, резеңке мойынтіректен, тексеру клапанының корпусынан (қосымша бөлшектер) және басқа компоненттерден тұрады. Қозғалтқыш бөлігі негізінен негізден, қысымды реттейтін пленкадан, тірек мойынтірегінен, тіреу тақтасынан, төменгі бағыттаушы мойынтірек орынынан, статордан, ротордан, жоғарғы бағыттаушы мойынтірек орынынан, құм сақинасынан, су құятын бөліктен, кабельден және басқа компоненттерден тұрады.
Өнімнің негізгі ерекшеліктеріне мыналар жатады:
1.The motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing, the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the change of the temperature rise of the motor.
2.In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft is equipped with two oil seals, and a sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed at the lower part of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6.The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Орнату алдында дайындық:
1. Суасты сорғының нұсқаулықта көрсетілген пайдалану шарттары мен көлеміне сәйкес келетінін тексеріңіз.
2. Диаметрі суасты сорғының сыртқы диаметріне тең ауыр объектіні пайдаланып, ұңғыма оқпанының ішкі диаметрі суасты сорғысына сәйкес келетінін өлшеңіз және ұңғыма тереңдігінің орнату талаптарына сәйкес келетінін өлшеңіз.
3. Ұңғыма оқпанының тазалығын және ұңғыма суының лайлы екенін тексеріңіз. Сүңгуір электр сорғыны мерзімінен бұрын зақымдап алмас үшін, суасты сорғысын лай мен құм суын жуу үшін ешқашан суасты электр сорғысын пайдаланбаңыз.
4. Ұңғыма сағасын орнату қапсырмасының орны сәйкес келетінін және оның бүкіл қондырғының сапасына төтеп бере алатынын тексеріңіз.
5. Нұсқаулықтағы құрастыру схемасына сәйкес суасты сорғы бөліктерінің толық және дұрыс орнатылғанын тексеріңіз Сүзгі экранын алып тастаңыз және муфтаның икемді айналатынын көру үшін бұраңыз.
6. Су бұрандасын бұрап алыңыз да, мотор қуысын таза, коррозияға ұшырамайтын сумен толтырыңыз (ескертпе. толтыруды ұмытпаңыз), содан кейін су бұрандасын қатайтыңыз. 12 сағат су бүркуден кейін қозғалтқыштың оқшаулау кедергісі 500В шайқау үстелімен өлшенгенде 150M Q кем болмауы керек.
7. Кабель қосындысы, шығатын кабельдің бір шетінен 120 мм резеңке гильзаны кесіп тастаңыз және сәйкес кабельді электрик пышағымен кесіп тастаңыз, содан кейін үш өзекті сымның ұзындығын сатылы пішінде айналдырыңыз, 20 мм мыс өзегін аршып алыңыз, оксидті қырыңыз мыс сымның сыртына пышақпен немесе құм шүберекпен төсеп, екі жалғанған сымның ұшын палирлерге салыңыз. Қабатты жұқа мыс сыммен мықтап байлап болғаннан кейін, оны мұқият және мықтап дәнекерлеп, кез келгенін құмдаңыз. бетіндегі бөртпелер. Содан кейін, үш буын үшін поливестрлі оқшаулағыш таспаны пайдаланып, оларды үш жууға арналған жартылай қабаттастырылған етіп орау керек. Орау қабатының екі ұшын nyion жіппен мықтап ораңыз, содан кейін таспаны үш қабатқа орау үшін жартылай жинақталған әдісті қолданыңыз. Сыртқы қабатты үш қабатқа жоғары қысымды оқшаулағыш таспамен ораңыз. Соңында, үш жіпті біріктіріп, оларды жоғары қысымды таспамен бес қабатқа қайта-қайта ораңыз. Әрбір қабат мықтап байланған болуы керек, ал қабат аралық қосылыстар судың оқшаулауына кіріп, зақымданбауы үшін тығыз және тығыз болуы керек. Орап болғаннан кейін бөлме температурасында 20 'c суға 12 сағат салып, сілкілеу үстелімен оқшаулау кедергісін өлшеңіз. , ол 100М Ом кем болмауы керек
Қосылған кабельді қосу процесінің схемасы келесідей:
8. Үш фазалы сымдардың жалғанғанын және тұрақты тұрақты ток кедергісінің шамамен теңестірілгенін тексеру үшін мультиметрді пайдаланыңыз.
9. Тізбек пен трансформатор сыйымдылығының шамадан тыс жүктелгенін тексеріңіз, содан кейін артық жүктемеден қорғау қосқышын немесе іске қосу жабдығын қосыңыз. Арнайы үлгілер үшін 2-кестені қараңыз, содан кейін сорғыдағы резеңке мойынтіректерді майлау үшін су сорғысының розеткасынан су сорғысына бір шелек су құйыңыз, содан кейін суасты электр сорғысын тік және тұрақты орналастырыңыз. Іске қосу (бір секундтан артық емес) және руль бағыты рульдік белгімен сәйкес келетінін тексеріңіз. Олай болмаса, үш фазалы кабельдің кез келген екі қосқышын ауыстырыңыз. Содан кейін сүзгіні орнатып, ұңғымаға түсуге дайындалыңыз. Ерекше жағдайларда (мысалы, арықтар, арықтар, өзендер, тоғандар, тоғандар және т.б.) пайдаланылса, электр сорғы сенімді түрде жерге тұйықталуы керек.
(2) Орнату жабдықтары мен құралдары:
1. Екі тоннадан асатын бір жұп көтеру шынжырлары.
2. Тік биіктігі төрт метрден кем емес штатив.
3. Бір тоннадан астам салмақты көтере алатын (су сорғыларының толық жиынтығының салмағын көтере алатын) екі аспа арқан (сым арқан).
4. Екі жұп қысқышты (шпинттерді) орнатыңыз.
5. Кілттер, балғалар, бұрағыштар, электр құралдары мен аспаптары және т.б.
(3) Электр сорғыны орнату:
1. Сүңгуір электр сорғының орнату схемасы 2-суретте көрсетілген. Орнатудың нақты өлшемдері 3-кестеде «Сүңгуір электр сорғының орнату өлшемдерінің тізімі» көрсетілген.
2. Басы 30 метрден аспайтын суасты электр сорғыларын шлангтарды және сым арқандарды немесе бүкіл машинаның, су құбырларының және құбырлардағы судың толық салмағын көтере алатын басқа кендір арқандарды пайдаланып, тікелей ұңғымаға көтеруге болады.
3. Басын 30 метрден асатын сорғыларда болат құбырлар пайдаланылады, орнату реті келесідей:
①Су сорғы бөлігінің үстіңгі ұшын (қозғалтқыш пен су сорғысы осы уақытта қосылған) қысу үшін қысқышты пайдаланыңыз, оны ілулі шынжырмен көтеріп, қысқышты ұңғыма сағасына орнатып, оны алып тастағанша ұңғымаға баяу байлаңыз. ілулі тізбек.
② Құбырды қысу үшін басқа қысқыштарды пайдаланыңыз, оны фланецтен 15 см қашықтықта ілулі шынжырмен көтеріп, баяу түсіріңіз. Құбыр фланеці мен сорғы фланецінің арасы Резеңке төсемді орнына қойып, құбырды және сорғыны болттар, гайкалар және серіппелі шайбалармен біркелкі қатайтыңыз.
③ Суасты сорғыны сәл көтеріңіз, су сорғышының үстіңгі жағындағы қысқышты алыңыз, кабельді су құбырына пластик таспамен мықтап байлаңыз және қысқыш ұңғыма сағасына қойылғанша баяу байлаңыз.
④Барлық су құбырларын ұңғымаға байлау үшін бірдей әдісті қолданыңыз.
⑤Шығару кабелі басқару қосқышына қосылғаннан кейін ол үш фазалы қуат көзіне қосылады.
(4) Орнату кезінде ескеретін жайттар:
1. Егер сору процесінде кептелу құбылысы анықталса, кептелу нүктесін жеңу үшін су құбырын бұраңыз немесе тартыңыз. Егер әртүрлі шаралар әлі де жұмыс істемесе, суасты электр сорғы мен ұңғымаға зақым келтірмеу үшін сорғыны күштеп түсірмеңіз.
2. Орнату кезінде әрбір құбырдың фланеціне резеңке төсеніш салынып, біркелкі тартылуы керек.
3. Су сорғыны ұңғымаға түсіргенде, сорғы ұзақ уақыт бойы ұңғыма қабырғасына қарсы жұмыс істеп, сораптың дірілдеуіне және қозғалтқыштың сыпырылуына және жануына жол бермеу үшін оны ұңғыма құбырының ортасына қою керек. .
4. Ұңғыманың ағып жатқан құм және тұнба жағдайына сәйкес су сорғышының ұңғыма түбіне дейінгі тереңдігін анықтаңыз. Сорғыны балшыққа көмуге болмайды. Су сорғышынан ұңғыма түбіне дейінгі қашықтық әдетте 3 метрден кем емес (2-суретті қараңыз).
5. Су сорғышының судың кіру тереңдігі судың динамикалық деңгейінен су құятын торапқа дейін 1-1,5 метрден кем болмауы керек (2-суретті қараңыз). Әйтпесе, су сорғысының мойынтіректері оңай зақымдалуы мүмкін.
6. Су сорғышының көтергіштігі тым төмен болмауы керек. Әйтпесе, қозғалтқыштың шамадан тыс жүктелуін және үлкен дебиттің салдарынан жанып кетуін болдырмау үшін номиналды дебит нүктесінде сорғы шығынын бақылау үшін ұңғыма сағасының су құбырына қақпақ клапанын орнату қажет.
7. Су сорғы жұмыс істеп тұрған кезде судың шығуы үздіксіз және біркелкі болуы керек, ток тұрақты болуы керек (номиналды жұмыс жағдайында, әдетте номиналды токтың 10% -нан аспауы керек), діріл немесе шу болмауы керек. Қандай да бір ауытқулар болса, себебін анықтау және оны жою үшін машинаны тоқтату керек.
8. Орнатқан кезде қозғалтқышты жерге қосу сымының параметріне назар аударыңыз (2-суретті қараңыз). Су құбыры болат құбыр болса, оны ұңғыманың қысқышынан жүргізеді; су құбыры пластикалық құбыр болса, оны электр сорғысының жерге қосу белгісінен өткізіңіз.
- 1.After installing the submersible pump, recheck the insulation resistance and three-phase continuity switch, check whether there is any error in the connection between the instrument and the starting equipment.If there is no problem, you can start to test the machine. After starting, observe whether the indication reading of each instrument is correct.If the rated voltage and current specified on the nameplate are exceeded, please observe whether the pump has noise or vibration.If everything is normal, it can be put into operation. After the pump runs for the first time for four hours, the motor thermal insulation resistance should be closed and tested quickly. Its value should not be less than 0.5 megaohm. After the pump stops, it should be restarted after five minutes to prevent the water column in the pipeline from completely reversing, which will cause the motor to burn out due to excessive current.
- 2.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1.Under the rated working condition, the current exceeds 20%.
- 2.The dynamic water level drops to the water inlet section, resulting in intermittent water.
- 3.The submersible pump has severe vibration or noise.
- 4.The supply voltage is lower than 340 volts.
- 5.A fuse is burned out.
- 6.The water pipeline is damaged.
- 7.The motor's insulation resistance to the geothermal state is lower than 0.5 megaohm.
- 3.Unit disassembly:
- - Кабель байлауын шешіп, құбыр бөлігін алып тастаңыз және сым тақтасын алыңыз.
- - screw down the water bolt, put out the water in the motor chamber.
- - сүзгіні алыңыз, қозғалтқыш білігін бекіту үшін муфтадағы бекітілген бұранданы босатыңыз.
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
1, мотор қуысындағы суды сөндіріңіз (әсіресе қыста қозғалтқыш қатып қалмас үшін) және кабельді жақсылап байлаңыз.
2, коррозиялық заттар мен газдары жоқ, температурасы 40 °C төмен жабық бөлмеде сақтаңыз.
3, ұзақ мерзімді пайдалану суасты сорғыларының тоттануына назар аудару керек.
- Доңғалақ
- Білік жеңі
- Резеңке білік жеңі
-
Тығыздау сақинасы
01 Терең ұңғыма суын алу
02 Көп қабатты су құбыры
03 тау сумен жабдықтау
04 мұнара суы
05 Ауыл шаруашылық суару
06 бақшаны суару
07 өзен суын алу
08 тұрмыстық су