The product adopts special water-resistant wire for motor winding, with excellent characteristics such as high frequency shock resistance, pulse peak voltage shock resistance and high temperature aging resistance. The frequency conversion winding design ensures the motor to operate smoothly between 1Hz and 50Hz for a long time, making the frequency conversion deep well pump more energy saving and longer service life.
We are honored to introduce our products, this product provides three-phase AC 380V power supply (tolerance of ± 5%), 50HZ voltage (tolerance of ± 1%). At the same time, our products require strict water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor adopts closed or water-filled wet structure, which must be filled with clean water before use to prevent empty. Tighten the water charging and deflating bolts before use, otherwise, it is not allowed to use. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The well water flow shall meet the output and continuous operation requirements of the submersible pump, and the output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or inverted, but only vertically. The submersible pump must be equipped with cables according to requirements, and is equipped with external overload protection devices. It is strictly prohibited to conduct no-load tests on the pump without water. Our products guarantee to provide you with high quality and stable performance, while meeting your needs to ensure safe and reliable.
ماڈل | بہاؤ (m3/h) | سر (m) |
گھومنے کی رفتار (تبدیلی/نقطہ) |
پانی کا پمپ(٪) | آؤٹ لیٹ قطر (ملی میٹر) |
اچھی طرح سے قابل اطلاق قطر (ملی میٹر) |
درجہ بندی power(KW) |
درجہ بندی وولٹیج (V) |
درجہ بندی موجودہ (A) |
موٹر کارکردگی (%) | power factorcosφ | یونٹ ریڈیل زیادہ سے زیادہ سائز (ملی میٹر) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175اوپر | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175اوپر | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175اوپر | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175اوپر | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175اوپر | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175اوپر | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175اوپر | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175اوپر | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175اوپر | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175اوپر | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175اوپر | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175اوپر | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175اوپر | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
This well submersible pump is a pump suitable for clean water. Digging new wells and pumping sediment and turbid water are strictly prohibited. The voltage grade of the well pump is 380V/50HZ. Submersible motors with other voltage grades need to be customized. Underground cables must use waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as overload short circuit protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be tripped in time. During installation and use, the pump must be reliably grounded. It is prohibited to push and pull the switch when hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be injected with distilled water or non-corrosive clear cold water in the inner cavity, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. The same as the steering instructions. Pay attention to safety when the pump is upright to prevent tilting and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump flow at low lift or in high lift pull too large, resulting in extreme wear of thrust bearings and other components, the motor due to overload and burn. After put into the well, the measurement of the motor and the ground insulation resistance value, not less than 100M. After the start, regular observation of voltage and current, and check the motor winding insulation is in line with the requirements of the provisions. If the temperature of the storage site is below the freezing point, the water in the pump chamber should be drained to prevent the water in the motor chamber from freezing and damaging the motor due to low temperature.
ساخت کا مختصر تعارف: پمپ کا حصہ بنیادی طور پر پمپ شافٹ، امپیلر، ڈائیورژن شیل، ربڑ بیئرنگ، چیک والو باڈی (اختیاری حصے) اور دیگر اجزاء پر مشتمل ہوتا ہے۔ موٹر پارٹ بنیادی طور پر بیس، پریشر ریگولیٹنگ فلم، تھرسٹ بیئرنگ، تھرسٹ پلیٹ، لوئر گائیڈ بیئرنگ سیٹ، اسٹیٹر، روٹر، اپر گائیڈ بیئرنگ سیٹ، ریت کی انگوٹی، واٹر انلیٹ سیکشن، کیبل اور دیگر اجزاء پر مشتمل ہوتا ہے۔
مصنوعات کی اہم خصوصیات میں شامل ہیں:
1.The motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing, the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the change of the temperature rise of the motor.
2.In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft is equipped with two oil seals, and a sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed at the lower part of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6.The pump is designed by computer CAD, with simple structure and good technical performance.

(1) تنصیب سے پہلے تیاری:
1. چیک کریں کہ کیا آبدوز پمپ دستی میں بیان کردہ استعمال کی شرائط اور دائرہ کار کو پورا کرتا ہے۔
2. سبمرسیبل پمپ کے زیادہ سے زیادہ بیرونی قطر کے برابر قطر والے بھاری آبییکٹ کا استعمال کرتے ہوئے، پیمائش کریں کہ کنویں کا اندرونی قطر سبمرسیبل پمپ کو فٹ کر سکتا ہے، اور پیمائش کریں کہ کنویں کی گہرائی تنصیب کی ضروریات کو پورا کرتی ہے۔
3. چیک کریں کہ کنواں صاف ہے اور کنویں کا پانی گندا ہے یا نہیں۔ سبمرسیبل الیکٹرک پمپ کو ویلور پمپ کیچڑ اور ریت کے پانی سے دھونے کے لیے کبھی بھی استعمال نہ کریں تاکہ آبدوز برقی پمپ کو قبل از وقت نقصان سے بچا جا سکے۔
4. چیک کریں کہ آیا ویلہیڈ انسٹالیشن کلیمپ کی پوزیشن مناسب ہے اور کیا یہ پوری یونٹ کے معیار کو برداشت کر سکتی ہے
5. چیک کریں کہ کیا آبدوز پمپ کے اجزاء مکمل ہیں اور مینول میں اسمبلی ڈایاگرام کے مطابق صحیح طریقے سے انسٹال ہیں فلٹر اسکرین کو ہٹا دیں اور کپلنگ کو گھمائیں تاکہ یہ معلوم ہو سکے کہ آیا یہ لچکدار طریقے سے گھومتا ہے
6. واٹر اسکرو کو کھولیں اور موٹر کیویٹی کو صاف، غیر corrosive پانی سے بھریں (نوٹ۔ اسے بھرنا یقینی بنائیں)، پھر واٹر اسکرو کو سخت کریں۔ پانی کے انجیکشن کے 12 گھنٹے کے بعد، جب 500V ہلانے والی میز کے ساتھ پیمائش کی جائے تو موٹر کی موصلیت کی مزاحمت 150M Q سے کم نہیں ہونی چاہیے۔
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
منسلک کیبل وائرنگ کے عمل کا خاکہ مندرجہ ذیل ہے:
8. یہ چیک کرنے کے لیے ملٹی میٹر کا استعمال کریں کہ آیا تھری فیز تاریں جڑی ہوئی ہیں اور آیا ڈی سی مزاحمت تقریباً متوازن ہے۔
9. چیک کریں کہ آیا سرکٹ اور ٹرانسفارمر کی گنجائش اوورلوڈ ہے، اور پھر اوورلوڈ پروٹیکشن سوئچ یا شروع ہونے والے سامان کو جوڑیں۔ مخصوص ماڈلز کے لیے جدول 2 دیکھیں، اور پھر پمپ میں ربڑ کے بیرنگ کو چکنا کرنے کے لیے واٹر پمپ آؤٹ لیٹ سے پانی کے پمپ میں ایک بالٹی پانی ڈالیں، اور پھر آبدوز برقی پمپ کو سیدھا اور مستحکم رکھیں۔ اسٹارٹ کریں (ایک سیکنڈ سے زیادہ نہیں) اور چیک کریں کہ آیا اسٹیئرنگ کی سمت اسٹیئرنگ کے نشان کے مطابق ہے۔ اگر نہیں، تو تھری فیز کیبل کے کسی بھی دو کنیکٹرز کو تبدیل کریں۔ پھر فلٹر لگائیں اور کنویں کے نیچے جانے کی تیاری کریں۔ اگر خاص مواقع (جیسے گڑھے، گڑھے، ندی، تالاب، تالاب وغیرہ) میں استعمال کیا جائے تو الیکٹرک پمپ کو قابل اعتماد طریقے سے گراؤنڈ کیا جانا چاہیے۔
(2) تنصیب کا سامان اور اوزار:
1. دو ٹن سے زیادہ کے لیے لفٹنگ چینز کا ایک جوڑا۔
2. ایک تپائی جس کی عمودی اونچائی چار میٹر سے کم نہ ہو۔
3. دو لٹکنے والی رسیاں (تار کی رسیاں) جو ایک ٹن سے زیادہ وزن برداشت کر سکتی ہیں (پانی کے پمپ کے مکمل سیٹ کا وزن برداشت کر سکتی ہیں)۔
4. کلیمپ کے دو جوڑے (اسپلنٹ) لگائیں۔
5. رنچیں، ہتھوڑے، سکریو ڈرایور، برقی آلات اور آلات وغیرہ۔
(3) الیکٹرک پمپ کی تنصیب:
1. سبمرسیبل الیکٹرک پمپ کی تنصیب کا خاکہ شکل 2 میں دکھایا گیا ہے۔ مخصوص تنصیب کے طول و عرض جدول 3 میں "سبمرسیبل الیکٹرک پمپ کی تنصیب کے طول و عرض کی فہرست" میں دکھائے گئے ہیں۔
2. 30 میٹر سے کم سر والے آبدوز برقی پمپوں کو ہوز اور تار کی رسیوں یا دیگر بھنگ کی رسیوں کا استعمال کرتے ہوئے براہ راست کنویں میں لہرایا جا سکتا ہے جو پوری مشین، پانی کے پائپوں اور پائپوں میں پانی کا پورا وزن برداشت کر سکتے ہیں۔
3. 30 میٹر سے زیادہ سر والے پمپ سٹیل کے پائپ استعمال کرتے ہیں، اور تنصیب کی ترتیب حسب ذیل ہے:
①واٹر پمپ والے حصے کے اوپری سرے کو کلیمپ کرنے کے لیے کلیمپ کا استعمال کریں (موٹر اور واٹر پمپ اس وقت جڑے ہوئے ہیں)، اسے لٹکی ہوئی زنجیر کے ساتھ اٹھائیں، اور آہستہ آہستہ اسے کنویں میں باندھیں جب تک کہ کلیمپ کو کنویں کے سر پر نہ لگائیں اور اسے ہٹا دیں۔ پھانسی کی زنجیر.
② پائپ کو کلیمپ کرنے کے لیے کلیمپ کا دوسرا جوڑا استعمال کریں، اسے فلینج سے 15 سینٹی میٹر دور لٹکتی زنجیر کے ساتھ اٹھائیں، اور اسے آہستہ آہستہ نیچے کریں۔ پائپ فلینج اور پمپ فلینج کے درمیان ربڑ کے پیڈ کو جگہ پر رکھیں اور پائپ کو سخت کریں اور بولٹ، نٹ اور اسپرنگ واشر کے ساتھ یکساں طور پر پمپ کریں۔
③ آبدوز پمپ کو تھوڑا سا اٹھائیں، پانی کے پمپ کے اوپری سرے پر موجود کلیمپ کو ہٹائیں، کیبل کو پلاسٹک کے ٹیپ سے پانی کے پائپ سے مضبوطی سے باندھیں، اور اسے آہستہ آہستہ اس وقت تک باندھیں جب تک کہ کلیمپ کنویں کے سر پر نہ لگ جائے۔
④ پانی کے تمام پائپوں کو کنویں میں باندھنے کے لیے ایک ہی طریقہ استعمال کریں۔
⑤لیڈ آؤٹ کیبل کے کنٹرول سوئچ سے منسلک ہونے کے بعد، یہ تھری فیز پاور سپلائی سے منسلک ہے۔
(4) انسٹالیشن کے دوران نوٹ کرنے کی چیزیں:
1. اگر پمپنگ کے عمل کے دوران جیمنگ کا رجحان پایا جاتا ہے، تو پانی کے پائپ کو موڑ دیں یا کھینچیں تاکہ جیمنگ پوائنٹ پر قابو پایا جا سکے۔ اگر مختلف اقدامات اب بھی کام نہیں کرتے ہیں، تو براہ کرم آبدوز برقی پمپ اور کنویں کو پہنچنے والے نقصان سے بچنے کے لیے پمپ کو مجبور نہ کریں۔
2. تنصیب کے دوران، ربڑ کا پیڈ ہر پائپ کے کنارے پر رکھا جانا چاہیے اور یکساں طور پر سخت ہونا چاہیے۔
3. جب پانی کے پمپ کو کنویں میں اتارا جاتا ہے، تو اسے کنویں کے پائپ کے درمیان میں رکھنا چاہیے تاکہ پمپ کو زیادہ دیر تک کنویں کی دیوار کے خلاف چلنے سے روکا جا سکے، جس سے پمپ ہل جائے اور موٹر جھاڑو اور جل جائے۔ .
4. کنویں کی بہتی ریت اور گاد کے حالات کے مطابق کنویں کے نیچے تک پانی کے پمپ کی گہرائی کا تعین کریں۔ پمپ کو کیچڑ میں نہ دفن کریں۔ پانی کے پمپ سے کنویں کے نیچے تک کا فاصلہ عام طور پر 3 میٹر سے کم نہیں ہوتا ہے (شکل 2 دیکھیں)۔
5. پانی کے پمپ کی پانی کے اندراج کی گہرائی متحرک پانی کی سطح سے پانی کے انلیٹ نوڈ تک 1-1.5 میٹر سے کم نہیں ہونی چاہیے (تصویر 2 دیکھیں)۔ بصورت دیگر، پانی کے پمپ کے بیرنگ آسانی سے خراب ہو سکتے ہیں۔
6. واٹر پمپ کی لفٹ بہت کم نہیں ہو سکتی۔ بصورت دیگر، ویل ہیڈ واٹر پائپ لائن پر گیٹ والو نصب کرنے کی ضرورت ہے تاکہ درجہ بند بہاؤ پوائنٹ پر پمپ کے بہاؤ کو کنٹرول کیا جا سکے تاکہ موٹر کو اوور لوڈ ہونے اور زیادہ بہاؤ کی شرح کی وجہ سے جل جانے سے روکا جا سکے۔
7. جب پانی کا پمپ چل رہا ہو، پانی کی پیداوار مسلسل اور یکساں ہونی چاہیے، کرنٹ مستحکم ہونا چاہیے (درجہ بندی شدہ کام کے حالات کے تحت، عام طور پر ریٹیڈ کرنٹ کے 10% سے زیادہ نہیں)، اور کوئی کمپن یا شور نہیں ہونا چاہیے۔ اگر کوئی غیر معمولی بات ہو تو اس کی وجہ معلوم کرنے اور اسے ختم کرنے کے لیے مشین کو روک دینا چاہیے۔
8. انسٹال کرتے وقت، موٹر گراؤنڈنگ وائر کی ترتیب پر توجہ دیں (تصویر 2 دیکھیں)۔ جب پانی کا پائپ سٹیل کا پائپ ہو تو اسے ویل ہیڈ کلیمپ سے لیڈ کریں۔ جب پانی کا پائپ پلاسٹک کا پائپ ہو تو اسے الیکٹرک پمپ کے گراؤنڈ مارک سے لے جائیں۔
- 1.After installing the submersible pump, recheck the insulation resistance and three-phase continuity switch, check whether there is any error in the connection between the instrument and the starting equipment.If there is no problem, you can start to test the machine. After starting, observe whether the indication reading of each instrument is correct.If the rated voltage and current specified on the nameplate are exceeded, please observe whether the pump has noise or vibration.If everything is normal, it can be put into operation. After the pump runs for the first time for four hours, the motor thermal insulation resistance should be closed and tested quickly. Its value should not be less than 0.5 megaohm. After the pump stops, it should be restarted after five minutes to prevent the water column in the pipeline from completely reversing, which will cause the motor to burn out due to excessive current.
- 2.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1.Under the rated working condition, the current exceeds 20%.
- 2.The dynamic water level drops to the water inlet section, resulting in intermittent water.
- 3.The submersible pump has severe vibration or noise.
- 4.The supply voltage is lower than 340 volts.
- 5.A fuse is burned out.
- 6.The water pipeline is damaged.
- 7.The motor's insulation resistance to the geothermal state is lower than 0.5 megaohm.
- 3.Unit disassembly:
- - کیبل ٹائی کو کھولیں، پائپ لائن کا حصہ ہٹائیں، اور تار کی پلیٹ کو ہٹا دیں۔
- - screw down the water bolt, put out the water in the motor chamber.
- - فلٹر کو ہٹا دیں، موٹر شافٹ کو ٹھیک کرنے کے لیے کپلنگ پر لگے ہوئے سکرو کو ڈھیلا کریں۔
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
1، موٹر کیویٹی میں پانی نکال دیں (خاص طور پر سردیوں میں موٹر کو جمنے سے روکنے کے لیے) اور کیبل کو اچھی طرح باندھ دیں۔
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3، طویل مدتی استعمال سبمرسیبل پمپ کے مورچا کی روک تھام پر توجہ دینا چاہئے.
- امپیلر
- شافٹ آستین
- ربڑ شافٹ آستین
-
سگ ماہی کی انگوٹی
01 گہرے کنویں کا پانی پینا
02 بلند و بالا پانی کی فراہمی
03 پہاڑی پانی کی فراہمی
04 ٹاور پانی
05 زرعی آبپاشی
06 باغ کی آبپاشی
07 دریا کے پانی کی مقدار
08 گھریلو پانی