250QJP Peep Bene Submersible Pump

OEM processus suscipe! Secundum usus usorum, consilium et fabricare varias species speciales requisita submersible motor et sentina non vexillum. Exsequendi signa: GB/T2816-2014 "Sentinam bene submersibilem", GB/T2818-2014 "Motorem asynchronum bene submersibile". Whatsapp: 17855846335
PDF DOWNLOAD
Details
Tags
 
Product Overview

This series of fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are equipped with alloy copper sleeves with water as lubricant. Stainless steel bushings replace ball bearings, avoiding the problems of easy rust of ball bearings and burnout of motor due to lack of oil and wear. Most suitable for music fountain, all models can be used horizontally.

 

 
Conditiones usus

1, potestas supple: three-phase AC 380V (tolerantia + / - 5%), 50HZ (tolerantia + / - 1%).

2, aquae qualitate;

(1) Aqua temperatura non est altior quam XX °C;

(2) immunditia solida contenta (ratio massae) non maior est quam 0.01%;

(3) PH valorem (pH) 6.5-8.5;

(4) hydrogenii sulfidelis contentum 1.5mg/L majus non est;

(5) Ion contentum chloridum maius 400mg/L non est.

III, motor clauditur vel aqua repleta humida structura, antequam uti cavitas submersibilis motoris plena sit aqua munda, ne falsa plena sit, et deinde aqua infusione obstringere, aere emittere fulmina, secus uti non licet.

IV, sentinam submersibilem penitus demergi debet in aqua, urinarum profunditas non est maior quam 70m, imo sentina submersibilis ab imo putei non minus quam 3m.

V, puteus aquae fluxus in sentinam aquae submersibilis output et operationem continuam occurrere possit, sentinae aquae output submersibilis coerceri debet ad 0.7 - 1.2 temporibus fluxus aestimatus.

VI, puteus rectum esse, sentinam submersible vel rasurae adhiberi non potest, tantum verticali usu.

VII, sentinam submersibilem aequare oportet cum fune secundum exigentias, et externam fabricam tutelae cultro.

VIII, sentinam sine aqua nullo onere test machinari stricte prohibetur

 

 
Model Meaning

 
Partialis Model Reference
Model Flow (m3/h) Caput
(m)

Rotatingspeed

(Mutatio / punctum)

Aqua sentinam(%)  Outlet
diametri
(mm)
Lorem bene
diametri (mm) 
 Ratum
power(KW)
Ratum
voltage(V)
Ratum
current (A *
Motorefficiency (%) potentia factorcosφ   Unitas
Aculeis Maximus amplitudo (mm)
Animadverte
250QJ50-40 50 40 2875 72 80  250supra 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250supra 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250supra 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250supra 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250supra 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250supra 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250supra 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250supra 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250supra 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Salus Cautelae

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

V, stricte secundum praescripta sentinae tollunt, fluunt usui, ne humilis fluat vel alta vi flare tollat, impulsus sustinens et alias partes indumenti, motor oneris combustus.

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introductio ad Structuram

The introduction and structure of this pump product mainly include pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main characteristics of this pump product include the use of water-cooled wet submersible three-phase asynchronous motor, the motor cavity is filled with clean water to cool the motor and lubricate the bearing, the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and the sand ring is installed to form a sand prevention structure. In order to avoid the pump shaft jumping at startup, the pump shaft and the motor shaft are connected together through the coupling, and the thrust bearing is installed at the lower part of the motor. The motor and pump bearing lubrication adopts water lubrication. The stator winding of the motor adopts high quality submersible motor winding, with high insulation performance. The pump adopts computer CAD design, simple structure and superior technical performance.

 
install

(I) Praeparatio ante institutionem:
1. Perspice an sentinam submersibilem usui conditionibus occurrat et ambitum in manuali definitum.
2. Utens obiectu gravi cum diametro aequali maximo diametro exterioris sentinae submersibilis, metire an inneldiametri putoris sentinam submersibilem aptare possit, et metire an puteus profundus ad institutionem requisita occurrat.
3. Reprehendo utrum puteus mundus sit, et si puteus aqua turbidus est. Numquam uti sentinam electricam submersibilem ad lavandum putorem sentinam lutum et aquam arenam ad vitandum praematurum damnum ad sentinam electricam submersibilem.
4. Reprehendo an positio fibulae institutionis welhead sit conveniens et an qualitatem totius unitatis sustinere possit
5. Reprehendo si partes sentinae submersibiles sint perfectae et rite institutae secundum schematis conventus in manu-Removeo velum colum et gyrari queat ad videndum an mollius circumagatur.
6. Aquam cochleae et cavum mobilem reple, non mordax aqua (ex corrosivis (vide ut eam sursum), tum obstringas aqualram. Post 12 horas aquae injectiones, insulatio motoris resistentia non minus quam 150M Q mensurata est cum 500V tabula quatiens.
7. Cable iuncturam, globulus manica 120mm abscindens ab extremo e fune exeuntis et adaptans funem cum cultello electriciano vacillat longitudine trium filorum nucleorum in figura calcatae, decoriabit 20mm nucleum cupri, rade oxydi. iacuit extrinsecus filum aeneum cum cultello vel panno arenario, et inseres duas filis connexis in palirs. Postea ligans lauacrum arcte cum filo cupreo, solidatur illud penitus et firmiter, et arena cuiuslibet. silua in superficie. Deinde tres articulos, polyvestrum taeniola utere, ut eas in modum semi reclinatum pro tribus labris involvas. Involve ad duos terminos stratis ligaturae tightywith nyion stamina, et deinde utere modum reclinatum semi reclinatum ad machinam trium ordinum involvere. Involve exterius cum summus pressura velit machinae tres ordines. Denique ternas plicas simul et eas identidem involvunt pro quinque laminis cum taenia alta pressura. Singulae tabulae arcte ligatae esse debent, et articuli interpositi stricta et fimm debent esse ne aqua in velitationem penetrare et laedere, Involutione, aqua macerari in cella temperie 20'c per 12 horas, et metiare velit resistentiam cum mensa quatiente. quod non debet esse minus quam 100M Ω .

 

Adnexa funis processus schematis wiring talis est:

 

8. Multimetro utere ad reprimendam num tria-phasma fila connexa sint et an resistentia DC proxime libratum sit.
9. Perscriptio num ambitus et transformantis capacitas cumulatur, et tunc coniunge cum onere transitum tutelae vel apparatum incipiens. Vide Tabulam 2 ad exempla specifica, et mitte situlam aquae in sentinam aquae ex aqua sentinae exitum ad praestringendum iuvantis gestus in sentinam, et pone sentinam submersibilem electricam erectam et constantem.Start (non plus quam unum secundum) et vide utrum directio gubernii sit cum signo gubernaculo consonans. Sin minus, aliquos duos connexiones trium-phase cables permuto. Deinde colum inaugurare et ad puteum descendere parant. Si in peculiaribus occasionibus adhibeantur (sicut fossae, fossae, flumina, stagna, stagna, etc.), sentinam electricam certo fundari debent.

 

(2) Installation instrumentorum et instrumentorum;
1. Unum par catenarum levandi plus duobus talentis.
2. Tripode cum perpendiculo non minus quam quattuor metra.
3. Duo funes suspensi (funes filum) qui pondus plus quam unum ton ferre possunt (pondere aquae soleatus completae).
4. duo paria fibulatorum inaugurare (facile).
5. Clavis, malleis, verticillis, instrumentis electricis et instrumentis, etc.

 

(III) Electric sentinam institutionem:
1. Tabulae institutionis sentinae submersibilis electrici in Figura ostenditur 2. Specificae institutiones dimensiones in Tabula 3 monstrantur "Index institutionis Dimensiones Submersible Electric Pump".

 

2. Solatus electrici submersibiles cum capite minore quam 30 metra directe levari possunt in puteum caligarum et funiculos filum vel alias funiculos cannabinos, qui plenum pondus totius machinae, fistulae aquae et aquae in tibiis ferre possunt.

 

3. Pumps cum capite plusquam 30 metrorum utimur fistulis ferreis, et series institutionis haec est:
① Fibulae utere ad fibulae partem superiorem sentinam aquae (motricis et aquae sentinae hoc tempore coniunctae sunt), eam cum cathena pensili tolle, et lente eam in puteum ligabis, donec Fibulae in putei caput auferas et removeas. catena pendula.
② Alterum par fibularum utere ad fistulam fibulae, eam leva cum cathena pendula 15 cm a LABIUM, et lente deprime. Inter fistulam LABIUM et sentinam flangePut Flexilis caudex in loco, et obstringere tibiam et sentinam aequabiliter cum valvis, nucibus et lavatoribus veris.
③ Sentinam submersibilem leviter tolle, fibulam in superiore fine aquae sentinae tolle, funem ligabis ad fistulam aquae cum taenia plastica firmiter, et lente ligabis eam donec Fibulae ad putei caput ponatur.
Eadem methodo omnes aquae fistulas in puteum alligant.
⑤Post funem plumbeum ad imperium transitum coniungitur, cum copia trium phase iungitur.


(4.) Notae in installation:
1. Si vallum phaenomenon in flantibus processum inveniatur, vertere vel fistulam aquam trahere, ut punctum vallum superetur. Si variae mensurae adhuc non operantur, quaeso Noli sentinam cogere ad vitandum damnum in sentinam electricam et puteum submersibilem.
2. In institutione, codex iuvantis ad cuiusque fistulae LABIUM collocari debet et aequaliter coarctari.
3. Cum aqua sentina in puteum demissa, in media fistula putei poni debet, ne sentinam contra murum putei diu curreret, sentinam pulsum et motorem verrere et comburere. .
4. Determinare profunditatem aquae sentinae ad imum putei iuxta arenam fluentem et condiciones putei limum. Sentinam in luto non sepelias. Distantia aquae sentinae ad fundum putei fere non minus quam 3 metra (vide figura 2).
5. Aquae viscus profunditas aquae sentinae non minus esse debet quam 1-1.5 metra a gradu aquae dynamicae ad nodi aquae diverticulum (vide Figure 2). Alioquin aquae sentinae gestus facile laedantur.
6. Aquae levare sentinam nimis humilis esse non potest. Alioquin valvae portae aquae putei fistulae inaugurari debet ut fluere sentinam fluere apud punctum aestimatum fluere prohibeat ne motor oneretur et exuratur propter magnas rates fluxus.
7. Cum aqua currit sentina, aqua output continuum et par esse debet, currens sit stabilis (sub condiciones operationis aestimatae, plerumque non plus quam 10% currentis aestimatae), nec vibratio nec strepitus esse debet. Si qua deprauatio est, machina cessari debet causam cognoscendi et removendi.
8. Cum inaugurari, attende ad occasum filum fundationis motoris (vide Figure 2). Fistula cum aqua est ferrea tibia, a puteo fibulato duc; cum fistula aquatica fistula plastica est, eam a fundamento sentinae electrici notam duc.

 

 
Tutela et sustentationem

 After the installation of the underwater pump, the insulation resistance and three-phase continuity of the switch face should be rechecked, and the connection between the instrument and the start device should be checked for any errors. If there is no problem, you can start to test the machine. After the start, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has noise or vibration. If everything is normal, it can be put into operation. After the first operation of the pump for four hours, the motor should be shut down and tested for thermal insulation resistance quickly. Its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and causing the motor to burn out due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal. If the following conditions are found, the machine should be shut down immediately to eliminate the fault: the current exceeds 20% under rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the underwater pump becomes violently vibrating or making noise; the supply voltage is lower than 340 volts; a fuse is blown out; the water pipe is damaged; the motor's thermal insulation resistance to the earth is less than 0.5 megaohm. The sequence of disassembly is: untie the cable fastening, remove the pipeline part, remove the line protection plate, screw down the water discharge bolt and discharge all the water in the motor chamber, remove the filter and loosen the coupling fixing screw of the motor shaft. The sequence of disassembly of the pump is: (see Figure 1) inlet section, impeller, guide housing, impeller, check the valve body. When removing the impeller, use special tools to loosen the taper sleeve of the impeller. Avoid bending the pump shaft and damaging the components throughout the process. The disassembly process of the motor is: (see Figure 1) put the motor on the platform, and remove the bolts, base, shaft head lock nut, thrust plate, key, lower guide plate (transverse bolt), bearing seat, screw knife seat from the bottom of the motor in order (take care not to damage the winding), and finally remove the connecting part and the upper guide bearing seat. Before assembling the unit, the rust and dirt of each part should be cleaned, and the sealant should be applied to each mating surface and fastener, and then assembled in reverse order of disassembly (the movement of the motor shaft after assembly is about one millimeter). After assembly, the coupling should be rotated flexibly and put on the filter for test. Once a year, or if less than a year of operation but has been immersed for two years, the underwater electric pump must be disassembled for maintenance in accordance with Article 5 and replace worn parts to ensure the normal operation and durability of the pump.

 

 
Repono et custodiam

 I, aquam in cavo motorio extingue (praesertim hieme ne motor a frigore) et funem bene ligaveris.

 2, repone in cella involucri sine substantiis et vaporibus corrosivis, cum temperatura infra 40 °C.

 III, diu terminus usus observandum ne rubigo soleatus submersible.

 

 
Partibus gerens
  • Impeller
  • hastile sleeve
  • Flexilis scapus sleeve
  • signantes anulum

 
Application missiones

I Aquam profunda bene attractio

II High-surgere aquarum copia

03 mons aquae copia 

04 aqua turris

05 Irrigatio agriculturae

VI hortus irrigationis

07 attractio aquae fluminis

08 aqua domestica

 

Si interest in productis nostris, informationes tuas hic relinquere potes, et tecum brevi tactus erimus.


Epistulam tuam hic scribe et mitte nobis

Si interest in productis nostris, informationes tuas hic relinquere potes, et tecum brevi tactus erimus.


laLatin