250QJP Peep Well -uppopumppu

Suorita OEM-käsittely! Mukaan käyttäjien vaatimukset, suunnittelu ja valmistus erilaisia ​​erityisvaatimuksia ei-standardi uppomoottori ja pumppu. Tuotteen toteutusstandardit: GB/T2816-2014 "kaivon uppopumppu", GB/T2818-2014 "kaivon upotettava asynkroninen moottori". WhatsApp: 17855846335
PDF DOWNLOAD
Yksityiskohdat
Tunnisteet
 
Tuote-esittely

This series of fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are equipped with alloy copper sleeves with water as lubricant. Stainless steel bushings replace ball bearings, avoiding the problems of easy rust of ball bearings and burnout of motor due to lack of oil and wear. Most suitable for music fountain, all models can be used horizontally.

 

 
Käyttöehdot

1, virtalähde: kolmivaiheinen AC 380V (toleranssi + / - 5%), 50 HZ (toleranssi + / - 1%).

2, veden laatu:

(1) water temperature is not higher than 20 °C;

(2) kiinteiden epäpuhtauksien pitoisuus (massasuhde) ei ole suurempi kuin 0,01 %;

(3) PH-arvo (pH) 6,5-8,5;

(4) rikkivetypitoisuus ei ole suurempi kuin 1,5 mg/l;

(5) kloridi-ionipitoisuus ei ole suurempi kuin 400 mg/l.

3, moottori on suljettu tai vedellä täytetty märkä rakenne, ennen käyttöä upotettavan moottorin ontelon on oltava täynnä puhdasta vettä, jotta vältetään väärät täynnä, ja kiristä sitten vesiruiskutus, ilmanpoistopultit, muuten ei saa käyttää

4, uppopumppu on upotettava kokonaan veteen, sukellussyvyys on enintään 70 m, uppopumpun pohja kaivon pohjasta on vähintään 3 m.

5, kaivon vesivirtauksen tulee pystyä vastaamaan uppopumpun vesitehoa ja jatkuvaa toimintaa, uppopumpun veden tuottoa tulisi säätää 0,7 - 1,2 kertaa nimellisvirtaamaan verrattuna.

6, kaivon tulee olla suora, uppopumppua ei voi käyttää tai upottaa, vain pystysuorassa käytössä.

7, uppopumppu on sovitettava yhteen kaapelin ja ulkoisen ylikuormitussuojalaitteen kanssa vaatimusten mukaisesti.

8, pumppu on ehdottomasti kielletty ilman veden kuormittamatonta testikonetta

 

 
Mallin merkitys

250QJP Peep Well Submersible Pump

 
Osittainen malliviite
Malli Virtaus (m3/h) Pää
(m)

Pyörimisnopeus

(muutos/piste)

Vesipumppu(%)  Pistorasia
halkaisija
(mm)
Soveltuu hyvin
halkaisija (mm) 
 Arvioitu
power(KW)
Arvioitu
jännite (V)
Arvioitu
virta (A)
Moottoriteho (%) power factorcosφ   Yksikkö
Säteittäinen enimmäiskoko (mm)
Huomautus
250QJ50-40 50 40 2875 72 80  250edellä 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250edellä 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250edellä 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250edellä 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250edellä 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250edellä 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250edellä 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250edellä 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250edellä 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Turvallisuusvarotoimet

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, tiukasti pumpun nostimen määräysten mukaisesti, virtausalueen käyttö, estämään alhaisen virtauksen tai suuren nostovoiman pumppausvoima, painelaakeri ja muut kulumisen osat, moottorin ylikuormitus poltettu

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Johdatus rakenteeseen

The introduction and structure of this pump product mainly include pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main characteristics of this pump product include the use of water-cooled wet submersible three-phase asynchronous motor, the motor cavity is filled with clean water to cool the motor and lubricate the bearing, the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and the sand ring is installed to form a sand prevention structure. In order to avoid the pump shaft jumping at startup, the pump shaft and the motor shaft are connected together through the coupling, and the thrust bearing is installed at the lower part of the motor. The motor and pump bearing lubrication adopts water lubrication. The stator winding of the motor adopts high quality submersible motor winding, with high insulation performance. The pump adopts computer CAD design, simple structure and superior technical performance.

250QJP Peep Well Submersible Pump
 
Asentaa

(1) Valmistelu ennen asennusta:
1. Tarkista, täyttääkö uppopumppu käsikirjassa määritellyt käyttöehdot ja laajuuden.
2. Käytä paksua obiektia, jonka halkaisija on yhtä suuri kuin uppopumpun suurin ulkohalkaisija, ja mittaa, mahtuuko porausreiän sisähalkaisija uppopumppuun, ja mittaa, täyttääkö kaivon syvyys asennusvaatimukset.
3. Tarkista, onko kaivon reikä puhdas ja onko kaivon vesi sameaa. Älä koskaan käytä upotettavaa sähköpumppua Welor-pumpun mudan ja hiekkaveden pesemiseen välttääksesi upotettavan sähköpumpun ennenaikaiset vauriot.
4. Tarkista, onko hitsauspään asennuspuristimen asento sopiva ja kestääkö se koko yksikön laadun
5. Tarkista, ovatko uppopumpun komponentit valmiit ja asennettu oikein käsikirjan asennuskaavion mukaisesti. Irrota suodatinverkko ja käännä kytkintä nähdäksesi, pyöriikö se joustavasti
6. Irrota vesiruuvi ja täytä moottorin ontelo puhtaalla, syövyttämättömällä vedellä (huomaa, että täytä se), kiristä sitten vesiruuvi. 12 tunnin vedenruiskutuksen jälkeen moottorin eristysvastuksen ei tulisi olla alle 150M Q mitattuna 500 V:n ravistuspöydällä.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Liitteenä oleva kaapelin kytkentäkaavio on seuraava:
250QJP Peep Well Submersible Pump

 

8. Tarkista yleismittarilla, onko kolmivaihejohdot kytketty ja onko tasavirtavastus suunnilleen tasapainossa.
9. Tarkista, onko piiri ja muuntajan kapasiteetti ylikuormitettu, ja kytke sitten ylikuormitussuojakytkin tai käynnistyslaitteisto. Katso taulukosta 2 tietyt mallit ja kaada sitten ämpäri vettä vesipumppuun vesipumpun ulostuloaukosta pumpun kumilaakerien voitelemiseksi ja aseta sitten upotettava sähköpumppu pystyasentoon ja vakaasti. Käynnistä (enintään sekunti) ja tarkista, onko ohjaussuunta yhdenmukainen ohjauskyltin kanssa. Jos ei, vaihda mitkä tahansa kaksi kolmivaiheisen kaapelin liitintä. Asenna sitten suodatin ja valmistaudu menemään kaivoon. Jos sähköpumppua käytetään erikoistilanteissa (kuten ojissa, ojissa, joissa, lammikoissa, lammikoissa jne.), sähköpumpun on oltava luotettavasti maadoitettu.

 

(2) Asennuslaitteet ja -työkalut:
1. Yksi nostoketjupari yli kahdelle tonnille.
2. Kolmijalka, jonka pystykorkeus on vähintään neljä metriä.
3. Kaksi ripustusköyttä (vaijeriköyttä), jotka kestävät yli yhden tonnin painon (kestävät koko vesipumppusarjan painon).
4. Asenna kaksi paria puristimia (lastoja).
5. Avaimet, vasarat, ruuvimeisselit, sähkötyökalut ja -välineet jne.

 

(3) Sähköpumpun asennus:
1. Upotettavan sähköpumpun asennuskaavio on esitetty kuvassa 2. Erityiset asennusmitat on esitetty taulukossa 3 "Upotettavan sähköpumpun asennusmittojen luettelo".

 

2. Upotettavat sähköpumput, joiden korkeus on alle 30 metriä, voidaan nostaa suoraan kaivoon käyttämällä letkuja ja vaijereita tai muita hamppuköysiä, jotka kestävät koko koneen, vesiputkien ja putkissa olevan veden koko painon.

 

3. Pumput, joiden nostokorkeus on yli 30 metriä, käyttävät teräsputkia, ja asennusjärjestys on seuraava:
①Kiinnitä vesipumpun osan yläpää puristimella (moottori ja vesipumppu on kytketty tällä hetkellä), nosta se ripustusketjulla ja sido se hitaasti kaivoon, kunnes Aseta puristin kaivon päähän ja poista riippuva ketju.
② Käytä toista puristinparia putken kiinnittämiseen, nosta se riippuketjulla 15 cm:n päähän laipasta ja laske se hitaasti alas. Putken laipan ja pumpun laipan väliin Aseta kumityyny paikoilleen ja kiristä putki ja pumppu tasaisesti pulteilla, muttereilla ja jousialuslevyillä.
③ Nosta uppopumppua hieman, irrota puristin vesipumpun yläpäästä, sido kaapeli tiukasti vesiputkeen muoviteipillä ja sido se hitaasti alas, kunnes puristin asettuu kaivon päähän.
④Kiinnitä kaikki vesiputket kaivoon samalla tavalla.
⑤Kun ulostulokaapeli on kytketty ohjauskytkimeen, se liitetään kolmivaiheiseen virtalähteeseen.


(4) Huomioitavaa asennuksen aikana:
1. Jos pumppausprosessin aikana havaitaan juuttumisilmiö, käännä tai vedä vesiputkea päästäksesi eroon tukoskohdasta. Jos useat toimenpiteet eivät vieläkään auta, älä paina pumppua väkisin alas, jotta uppopumppu ja kaivo eivät vaurioidu.
2. Asennuksen aikana kumityyny tulee asettaa jokaisen putken laippaan ja kiristää tasaisesti.
3. Kun vesipumppu lasketaan kaivoon, se tulee sijoittaa kaivon putken keskelle, jotta pumppu ei pääse pyörimään kaivon seinää vasten pitkään, jolloin pumppu tärisee ja moottori lakaise ja palaa. .
4. Määritä vesipumpun syvyys kaivon pohjaan kaivon virtaavan hiekka- ja lieteolosuhteiden mukaan. Älä hauta pumppua mutaan. Etäisyys vesipumpusta kaivon pohjaan on yleensä vähintään 3 metriä (katso kuva 2).
5. Vesipumpun veden sisääntulosyvyyden tulee olla vähintään 1-1,5 metriä dynaamisesta vedenpinnasta vedentulon solmuun (katso kuva 2). Muuten vesipumpun laakerit voivat vaurioitua helposti.
6. Vesipumpun nosto ei saa olla liian matala. Muussa tapauksessa kaivon pään vesiputkeen on asennettava sulkuventtiili, joka ohjaa pumpun virtausta nimellisvirtauspisteessä, jotta moottori ei ylikuormituisi ja palaisi pois suurten virtausnopeuksien takia.
7. Kun vesipumppu on käynnissä, veden tulee olla jatkuvaa ja tasaista, virran tulee olla vakaa (nimellisissä käyttöolosuhteissa, yleensä enintään 10 % nimellisvirrasta), eikä siinä saa olla tärinää tai melua. Jos havaitaan poikkeavuuksia, kone on pysäytettävä syyn selvittämiseksi ja sen poistamiseksi.
8. Kiinnitä asennuksen yhteydessä huomiota moottorin maadoitusjohtimen asentoon (katso kuva 2). Kun vesiputki on teräsputki, johda se kaivonpään puristimesta; kun vesiputki on muoviputki, johda se sähköpumpun maadoitusmerkistä.

 

 
Huolto ja huolto

 After the installation of the underwater pump, the insulation resistance and three-phase continuity of the switch face should be rechecked, and the connection between the instrument and the start device should be checked for any errors. If there is no problem, you can start to test the machine. After the start, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has noise or vibration. If everything is normal, it can be put into operation. After the first operation of the pump for four hours, the motor should be shut down and tested for thermal insulation resistance quickly. Its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and causing the motor to burn out due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal. If the following conditions are found, the machine should be shut down immediately to eliminate the fault: the current exceeds 20% under rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the underwater pump becomes violently vibrating or making noise; the supply voltage is lower than 340 volts; a fuse is blown out; the water pipe is damaged; the motor's thermal insulation resistance to the earth is less than 0.5 megaohm. The sequence of disassembly is: untie the cable fastening, remove the pipeline part, remove the line protection plate, screw down the water discharge bolt and discharge all the water in the motor chamber, remove the filter and loosen the coupling fixing screw of the motor shaft. The sequence of disassembly of the pump is: (see Figure 1) inlet section, impeller, guide housing, impeller, check the valve body. When removing the impeller, use special tools to loosen the taper sleeve of the impeller. Avoid bending the pump shaft and damaging the components throughout the process. The disassembly process of the motor is: (see Figure 1) put the motor on the platform, and remove the bolts, base, shaft head lock nut, thrust plate, key, lower guide plate (transverse bolt), bearing seat, screw knife seat from the bottom of the motor in order (take care not to damage the winding), and finally remove the connecting part and the upper guide bearing seat. Before assembling the unit, the rust and dirt of each part should be cleaned, and the sealant should be applied to each mating surface and fastener, and then assembled in reverse order of disassembly (the movement of the motor shaft after assembly is about one millimeter). After assembly, the coupling should be rotated flexibly and put on the filter for test. Once a year, or if less than a year of operation but has been immersed for two years, the underwater electric pump must be disassembled for maintenance in accordance with Article 5 and replace worn parts to ensure the normal operation and durability of the pump.

 

 
Säilytys ja säilytys

 1, sammuta vesi moottorin ontelosta (etenkin talvella moottorin jäätymisen estämiseksi) ja sido kaapeli hyvin.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, pitkäaikaisessa käytössä tulee kiinnittää huomiota uppopumppujen ruosteenestoon.

 

 
Kuluvat osat
  • Juoksupyörä
  • Akseliholkki
  • Akselin kumiholkki
  • Tiivisterengas

 
Sovellusskenaariot

01 Syvän kaivon vedenotto

02 Korkean rakennuksen vesihuolto

03 vuoren vesihuolto 

04 torni vesi

05 Maatalouden kastelu

06 puutarhan kastelu

07 joen vedenotto

08 käyttövesi

 

Jos olet kiinnostunut tuotteistamme, voit jättää tietosi tähän, niin otamme sinuun pian yhteyttä.


Kirjoita viestisi tähän ja lähetä se meille

Jos olet kiinnostunut tuotteistamme, voit jättää tietosi tähän, niin otamme sinuun pian yhteyttä.


fiFinnish