250QJP Peep Well гүний насос

OEM боловсруулалт хийх! Хэрэглэгчийн шаардлагын дагуу стандартын бус гүний мотор, насосны төрөл бүрийн тусгай шаардлагын дизайн, үйлдвэрлэл. Бүтээгдэхүүний хэрэгжилтийн стандартууд: GB/T2816-2014 "худгийн гүний насос", GB/T2818-2014 "худагт гүний асинхрон мотор". WhatsApp: 17855846335
PDF DOWNLOAD
Дэлгэрэнгүй мэдээлэл
Шошго
 
Бүтээгдэхүүний тойм

This series of fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are equipped with alloy copper sleeves with water as lubricant. Stainless steel bushings replace ball bearings, avoiding the problems of easy rust of ball bearings and burnout of motor due to lack of oil and wear. Most suitable for music fountain, all models can be used horizontally.

 

 
Хэрэглэх нөхцөл

1, тэжээлийн хангамж: гурван фазын хувьсах гүйдлийн 380V (хүлцэл + / - 5%), 50HZ (хүлцэл + / - 1%).

2, усны чанар:

(1) water temperature is not higher than 20 °C;

(2) хатуу хольцын агууламж (массын харьцаа) 0.01% -иас ихгүй;

(3) PH утга (рН) 6.5-8.5;

(4) устөрөгчийн сульфидын агууламж 1.5 мг/л-ээс ихгүй;

(5) хлоридын ионы агууламж 400 мг/л-ээс ихгүй байна.

3, мотор нь хаалттай эсвэл усаар дүүрсэн нойтон бүтэцтэй, ашиглахаас өмнө гүний моторын хөндий нь цэвэр усаар дүүрсэн байх ёстой бөгөөд хуурамчаар дүүргэхээс сэргийлж, дараа нь ус шахах, агаар гаргах боолтыг чангалж, өөрөөр ашиглахыг хориглоно.

4, гүний насос бүрэн усанд живсэн байх ёстой, шумбах гүн нь 70м-ээс ихгүй, худгийн ёроолоос гүний насосны ёроол нь 3м-ээс багагүй байна.

5-д заасны дагуу худгийн усны урсгал нь гүний насосны усны гаралт, тасралтгүй ажиллагаатай байх ёстой, гүний насосны усны гаралтыг нэрлэсэн урсацаас 0.7 - 1.2 дахин их хэмжээгээр хянаж байх ёстой.

6, худаг нь шулуун байх ёстой, гүний насосыг ашиглах эсвэл хаях боломжгүй, зөвхөн босоо байрлалд ашиглах боломжтой.

7, гүний насос шаардлагын дагуу кабель таарч байх ёстой, гадна хэт ачааллаас хамгаалах төхөөрөмж.

8. Усны ачаалалгүй туршилтын машингүйгээр насосыг хатуу хориглоно

 

 
Загварын утга

250QJP Peep Well Submersible Pump

 
Загварын хэсэгчилсэн лавлагаа
Загвар Урсгал (м3/ц) Толгой
(м)

Эргэлтийн хурд

(өөрчлөлт/цэг)

Усны шахуурга(%)  Гаралтын цэг
диаметр
(мм)
Сайн хэрэглэх боломжтой
диаметр (мм) 
 Үнэлгээ өгсөн
power(KW)
Үнэлгээ өгсөн
хүчдэл(V)
Үнэлгээ өгсөн
одоогийн (A)
Моторт үр ашиг (%) power factorcosφ   Нэгж
Радиал хамгийн их хэмжээ(мм)
Тайлбар
250QJ50-40 50 40 2875 72 80  250дээрх 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250дээрх 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250дээрх 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250дээрх 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250дээрх 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250дээрх 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250дээрх 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250дээрх 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250дээрх 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Аюулгүй байдлын урьдчилан сэргийлэх арга хэмжээ

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, насос өргөх заалтын дагуу, ашиглалтын урсгалын хүрээ, бага урсах эсвэл өндөр өргөх шахуургын хүч, ачааны холхивч болон бусад эд ангиудын элэгдэл, моторын хэт ачаалал шатахаас сэргийлнэ.

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Бүтцийн танилцуулга

The introduction and structure of this pump product mainly include pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main characteristics of this pump product include the use of water-cooled wet submersible three-phase asynchronous motor, the motor cavity is filled with clean water to cool the motor and lubricate the bearing, the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and the sand ring is installed to form a sand prevention structure. In order to avoid the pump shaft jumping at startup, the pump shaft and the motor shaft are connected together through the coupling, and the thrust bearing is installed at the lower part of the motor. The motor and pump bearing lubrication adopts water lubrication. The stator winding of the motor adopts high quality submersible motor winding, with high insulation performance. The pump adopts computer CAD design, simple structure and superior technical performance.

250QJP Peep Well Submersible Pump
 
Суулгах

(1) Суулгахын өмнөх бэлтгэл:
1. Гүний насос нь гарын авлагад заасан ашиглалтын нөхцөл, хамрах хүрээг хангаж байгаа эсэхийг шалгана.
2. Гүний насосны гадна талын хамгийн их диаметртэй тэнцэх голчтой хүнд obiect ашиглан худгийн дотоод диаметр нь гүний насостой тохирох эсэхийг хэмжиж, худгийн гүн нь угсралтын шаардлагад нийцэж байгаа эсэхийг хэмжинэ.
3. Худагны цооног цэвэр, худгийн ус булингартай эсэхийг шалгана. Гүний насосыг дутуу гэмтээхгүйн тулд гүний насосыг шавар, элстэй усаар угааж болохгүй.
4. Худагны толгойн угсралтын хавчаарын байрлал тохиромжтой эсэх, энэ нь бүхэл бүтэн нэгжийн чанарыг тэсвэрлэх чадвартай эсэхийг шалгана.
5. Гүний насосны эд ангиуд нь гарын авлагын угсралтын схемийн дагуу бүрэн хийгдсэн, зөв ​​суурилуулсан эсэхийг шалгана Шүүлтүүрийн дэлгэцийг авч, холбоосыг эргүүлж уян хатан эргэлдэж байгаа эсэхийг шалгана уу.
6. Усны боолтыг тайлж, моторын хөндийг цэвэр, идэмхийгүй усаар дүүргэж (санаар. дүүргэхээ мартуузай), дараа нь усны боолтыг чангал. Ус шахсны дараа 12 цагийн дараа хөдөлгүүрийн тусгаарлагчийн эсэргүүцэл нь 500 В-ийн сэгсрэх хүснэгтээр хэмжихэд 150M Q-аас багагүй байх ёстой.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Хавсаргасан кабелийн холболтын диаграмм нь дараах байдалтай байна.
250QJP Peep Well Submersible Pump

 

8. Мультиметр ашиглан гурван фазын утас холбогдсон эсэх, тогтмол гүйдлийн эсэргүүцэл ойролцоогоор тэнцвэртэй байгаа эсэхийг шалгана.
9. Хэлхээ болон трансформаторын хүчин чадал хэт ачаалалтай байгаа эсэхийг шалгаад дараа нь хэт ачааллаас хамгаалах унтраалга буюу асаах төхөөрөмжийг холбоно. Тодорхой загваруудыг Хүснэгт 2-оос харна уу, дараа нь насосны резинэн холхивчийг тослохын тулд усны шахуургын гаралтаас усны шахуурга руу хувин ус хийнэ, дараа нь гүний цахилгаан насосыг босоо, тогтвортой байрлуулна. Эхлүүлэх (нэг секундээс илүүгүй) жолооны чиглэл нь жолооны тэмдэгтэй нийцэж байгаа эсэхийг шалгана. Үгүй бол гурван фазын кабелийн хоёр холбогчийг сольж, шүүлтүүрийг суурилуулж, худаг руу ороход бэлтгэ. Онцгой тохиолдлуудад (шулуун, шуудуу, гол мөрөн, цөөрөм, цөөрөм гэх мэт) ашигладаг бол цахилгаан насосыг найдвартай газардуулсан байх ёстой.

 

(2) Суурилуулах тоног төхөөрөмж, багаж хэрэгсэл:
1. Хоёр тонноос дээш ачаа өргөх нэг хос гинж.
2. Дөрвөн метрээс багагүй босоо өндөртэй штатив.
3. Нэг тонноос дээш жинтэй (усны шахуургын иж бүрэн жинг даах) хоёр өлгөөтэй олс (таасан татлага).
4. Хоёр хос хавчаар (шоор) суулгана.
5. Түлхүүр, алх, халив, цахилгаан хэрэгсэл, багаж хэрэгсэл гэх мэт.

 

(3) Цахилгаан насос суурилуулах:
1. Гүний цахилгаан насосны угсралтын диаграммыг Зураг 2-т үзүүлэв. Суурилуулалтын тусгай хэмжээсийг 3-р хүснэгтэд "Гүний цахилгаан насосны суурилуулах хэмжээсийн жагсаалт"-д үзүүлэв.

 

2. 30 метрээс бага толгойтой гүний цахилгаан насосыг бүхэлд нь машин, ус дамжуулах хоолой, хоолой дахь усыг бүхэлд нь даах чадвартай шланк, ган татлага эсвэл бусад олсны олс ашиглан шууд худаг руу өргөж болно.

 

3. 30 метрээс дээш өндөртэй насосууд нь ган хоолой ашигладаг бөгөөд угсралтын дараалал нь дараах байдалтай байна.
①Усны насосны хэсгийн дээд үзүүрийг хавчаараар хавчуулж (мотор ба усны шахуургыг энэ үед холбосон) өлгөөтэй гинжээр өргөж, хавчаарыг худгийн амсар дээр тавиад худаг руу аажмаар уя. өлгөөтэй гинж.
② Өөр нэг хос хавчаар ашиглан хоолойг хавчих ба фланцаас 15 см зайд өлгөөтэй гинжээр өргөж, аажмаар буулгана. Хоолойн фланц ба шахуургын фланцын хооронд резинэн дэвсгэрийг байрлуулж, хоолойг чангалж, боолт, самар, пүршний угаагчаар жигд шахна.
③ Гүний насосыг бага зэрэг өргөж, усны насосны дээд талын хавчаарыг авч, кабелийг хуванцар туузаар ус дамжуулах хоолойд сайтар боож, хавчаарыг худгийн амсарт байрлуулах хүртэл аажмаар боож өгнө.
④Бүх усны хоолойг худагт холбохдоо ижил аргыг хэрэглээрэй.
⑤Гаралтын кабелийг хяналтын унтраалгатай холбосны дараа гурван фазын тэжээлийн хангамжид холбогдсон байна.


(4) Суулгах явцад анхаарах зүйлс:
1. Ус шахах явцад гацах үзэгдэл илэрвэл ус дамжуулах хоолойг эргүүлэх буюу татах, гацах цэгийг даван туулах. Хэрэв янз бүрийн арга хэмжээ үр дүнгүй хэвээр байвал гүний цахилгаан насос болон худгийг гэмтээхгүйн тулд насосыг хүчээр буулгаж болохгүй.
2. Суурилуулалтын явцад хоолой бүрийн фланц дээр резинэн дэвсгэр тавьж, жигд чангална.
3. Усны насосыг худаг руу буулгах үед худгийн хананд шахуургыг удаан хугацаагаар ажиллуулж, насос чичирч, мотор нь шүүрдэж шатахаас сэргийлж худгийн голд байрлуулна. .
4. Худагны урсах элс, лаг шаврын нөхцлөөс хамааран худгийн ёроол хүртэлх усны насосны гүнийг тодорхойлно. Шахуургыг шаварт булж болохгүй. Усны насосоос худгийн ёроол хүртэлх зай нь ерөнхийдөө 3 метрээс багагүй байна (2-р зургийг үз).
5. Ус шахуургын ус орох гүн нь динамик усны түвшингээс усны оролтын зангилаа хүртэл 1-1.5 метрээс багагүй байх ёстой (2-р зургийг үз). Үгүй бол усны насосны холхивч амархан эвдэрч болзошгүй.
6. Усны шахуургын өргөлт хэт бага байж болохгүй. Үгүй бол худгийн амны ус дамжуулах хоолой дээр насосны урсгалыг хэвийн урсгалын цэг дээр хянахын тулд хөдөлгүүрийг хэт ачаалж, их урсацын хурднаас болж шатаахаас сэргийлэхийн тулд хаалганы хавхлагыг суурилуулах шаардлагатай.
7. Усны насос ажиллаж байх үед усны гаралт тасралтгүй жигд байх ёстой, гүйдэл нь тогтвортой байх ёстой (ажиллах нэрлэсэн нөхцөлд, ерөнхийдөө нэрлэсэн гүйдлийн 10% -иас ихгүй), чичиргээ, чимээ шуугиангүй байх ёстой. Хэрэв ямар нэгэн хэвийн бус байдал байгаа бол шалтгааныг олж мэдэх, арилгахын тулд машиныг зогсооно.
8. Суулгахдаа моторын газардуулгын утасны тохиргоонд анхаарлаа хандуулаарай (2-р зургийг үз). Ус дамжуулах хоолой нь ган хоолой байх үед худгийн хавчаараас хөтлөх; ус дамжуулах хоолой нь хуванцар хоолой байх үед цахилгаан насосны газардуулгын тэмдэгээс хүргэнэ.

 

 
Засвар үйлчилгээ, засвар үйлчилгээ

 After the installation of the underwater pump, the insulation resistance and three-phase continuity of the switch face should be rechecked, and the connection between the instrument and the start device should be checked for any errors. If there is no problem, you can start to test the machine. After the start, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has noise or vibration. If everything is normal, it can be put into operation. After the first operation of the pump for four hours, the motor should be shut down and tested for thermal insulation resistance quickly. Its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and causing the motor to burn out due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal. If the following conditions are found, the machine should be shut down immediately to eliminate the fault: the current exceeds 20% under rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the underwater pump becomes violently vibrating or making noise; the supply voltage is lower than 340 volts; a fuse is blown out; the water pipe is damaged; the motor's thermal insulation resistance to the earth is less than 0.5 megaohm. The sequence of disassembly is: untie the cable fastening, remove the pipeline part, remove the line protection plate, screw down the water discharge bolt and discharge all the water in the motor chamber, remove the filter and loosen the coupling fixing screw of the motor shaft. The sequence of disassembly of the pump is: (see Figure 1) inlet section, impeller, guide housing, impeller, check the valve body. When removing the impeller, use special tools to loosen the taper sleeve of the impeller. Avoid bending the pump shaft and damaging the components throughout the process. The disassembly process of the motor is: (see Figure 1) put the motor on the platform, and remove the bolts, base, shaft head lock nut, thrust plate, key, lower guide plate (transverse bolt), bearing seat, screw knife seat from the bottom of the motor in order (take care not to damage the winding), and finally remove the connecting part and the upper guide bearing seat. Before assembling the unit, the rust and dirt of each part should be cleaned, and the sealant should be applied to each mating surface and fastener, and then assembled in reverse order of disassembly (the movement of the motor shaft after assembly is about one millimeter). After assembly, the coupling should be rotated flexibly and put on the filter for test. Once a year, or if less than a year of operation but has been immersed for two years, the underwater electric pump must be disassembled for maintenance in accordance with Article 5 and replace worn parts to ensure the normal operation and durability of the pump.

 

 
Хадгалалт ба хамгаалалт

 1, моторын хөндий дэх усыг унтрааж (ялангуяа өвлийн улиралд мотор хөлдөхөөс сэргийлж), кабелийг сайтар холбоно.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, урт хугацааны хэрэглээ нь гүний насосны зэврэлтээс урьдчилан сэргийлэхэд анхаарах хэрэгтэй.

 

 
Элсэн эд анги
  • Импеллер
  • Босоо амны ханцуй
  • Резинэн босоо амны ханцуй
  • Битүүмжлэх бөгж

 
Хэрэглээний хувилбарууд

01 Гүний худгийн усны хэрэглээ

02 Өндөр давхрын усан хангамж

03 уулын усан хангамж 

04 цамхаг ус

05 Газар тариалангийн усалгаа

06 цэцэрлэгийн усалгаа

07 голын ус авах

08 ахуйн ус

 

Хэрэв та манай бүтээгдэхүүнийг сонирхож байгаа бол энд мэдээллээ үлдээх боломжтой бөгөөд бид тантай удахгүй холбогдох болно.


Энд мессежээ бичээд бидэнд илгээгээрэй

Хэрэв та манай бүтээгдэхүүнийг сонирхож байгаа бол энд мэдээллээ үлдээх боломжтой бөгөөд бид тантай удахгүй холбогдох болно.


mnMongolian